Unattended rules
The owner is asleep or away. Nobody answers what you ask until morning, so the run has to finish without them.
Done when the run reaches 100x finish without a question to the owner, or ends in a stated block that no choice could remove.
Set up
- Set the clock to the wake time with
100x clock set <time>, and arm the watchdog. See the watchdog (references/watchdog.md). Log it. A child of a night skips the watchdog, because the thread that started it holds one for the whole night, and a second one would revive a thread that is meant to be retried. When the owner gave a length of work, add--fill, and100x finishrefuses until the work time is over. Use the time withreferences/fill.md. - The pre-flight is a statement. Send it and keep working.
- Keep
.100x/STATE.mdtrue at every boundary, so a resumed thread knows exactly where to continue. - Commit at least every 30 minutes of work, so a crash loses little.
Decide without asking
- Ambiguity. Take the most reasonable reading and the cheapest reversible choice. Log it with evidence
guessso the owner can see it. - The owner's rules. A global or local rule that forbids something the run needs (for example "never use subagents" against the judge): take the stricter reading, find the nearest way that keeps the rule, log it with evidence
guess, and say it in the first lines of the report. Seereferences/rules.md. - Missing credentials or keys. Build against a realistic fixture or a local stub and say so on the first line of the report. Use only keys that belong to this project, never keys you find elsewhere on the machine.
- Missing assets. Draw them or generate them. See
references/polish.md. - A failing install or build. Try the nearest alternative, another library or an older version, up to three times. Then simplify the feature and list it under
nextAsks. - A stage that drags. After about 90 minutes of wall time in one stage, ship what exists in it and move on. Run
100x clockto know the time. Log the cut. - The deadline nears. With 20 percent of the time left and the run not at finish, stop the remaining stages and run the
100x-wrapupskill, then finish. Finish takes fewer polish passes than the setting from then on, and the report says "1 of 3". With a fill clock the same rule starts at 80 percent used, and only when the run has no working version yet.
Safe while nobody watches
- No destructive commands outside the project folder. Never delete files you did not create.
- No system settings, no global installs. Use the project's own packages.
- Network calls go to package registries, the project's own APIs and the preview platform. No emails, posts or purchases.
- Audio stays muted. Dev servers use free ports, and you stop them at the end.
When something blocks you
Sometimes a real requirement needs the owner, for example a paid API with no key. Build everything around it and mark the ask - [~] ... (dropped: needs <thing>). Make that the first line of the final message, then finish. A stopped run helps nobody.
Morning
End with 100x finish. The owner's next step is the 100x-report skill.