Skip to content

176 web animation techniques, each a live demo with plain settings and a ready-made prompt for your AI assistant. No dependencies, no build step.

10.2 KB
Raw Blame

Next projects: coordination

2026-10-13. What four projects share: See inside and Compare on every page (the rollout, 2026-10-13-see-inside-compare-rollout-design.md), the Animation finder (the finder, 2026-10-13-animation-finder-design.md), Famous effects (2026-10-13-famous-effects-design.md) and ten new animations (2026-10-13-ten-new-animations-design.md), plus the later tab pass. Each spec points here; where a spec and this file disagree, this file wins. The coordinator (the main session) owns everything below. Sources: the cross-review of the four specs (.superpowers/sdd/2026-10-13-learn-pilot/spec-cross-review.md) and the owner's answers of 2026-10-13.

Order (owner, 2026-10-13)

  1. The rollout, from 2026-10-14: Phase 0, the first batch and the owner's look, the other 159 pages, integration, the final review and the owner's final look. Live in one piece on the owner's word.
  2. The finder and Famous effects, at the same time, beside Phase 0 and the owner's first-batch look (about a day of agent work each). Each goes live as soon as it is ready and the owner approves it: the finder reached from the home page (the button under the search, the Finder link in its top bar), Famous effects from the home page's footer and the README.
  3. The ten new animations, right after the rollout's Phase 0 (owner, 2026-10-14), beside the first batch and the other 159 pages, on their own branch; built without the new tabs. Their branch is merged into the rollout's at the start of the rollout's integration, so its final review, gallery and final look cover all 176 pages, and both go live together on the owner's word.
  4. The tab pass: Finder and Famous effects tabs on all 176 pages, Famous effects in the home page's bar, Finder in the Famous effects page's bar, and 404's bar if decided. The coordinator writes its short spec after the ten new animations are integrated, from the finder spec's section 7.
  5. Paused: the learning path and Motion basics, on feat/learn-pilot; they resume after these by reverting the rollout's clean-up commit.

If the finder or Famous effects is not live when the ten new animations are due to start, the coordinator asks the owner whether they wait for it or take it in (it then goes live with them).

Branches and places

Project Branch Cut from Worktrees (.claude/worktrees/) Run folder (.superpowers/sdd/) Ports
Rollout feat/see-inside-compare; slots sic/<NN><letter>, categories sic/cat-NN as it is sic-<NN><letter> <start date>-see-inside-compare/ 8800 (before-pictures), 8801–8820 (slots), 8821–8850 (re-cut slots, the probe, lanes, category checks, final review, integration)
Finder feat/animation-finder main af-* <start date>-animation-finder/ 8901–8909
Famous effects feat/famous-effects main fx-* <start date>-famous-effects/ 8931–8939
Ten new feat/ten-animations; lanes ten/L<n> feat/see-inside-compare once Phase 0 is merged (owner, 2026-10-14); merged back into it at the start of the rollout's integration ten-L<n>, ten-int, ten-rev <start date>-ten-animations/ 8961–8970 (lanes), 8971 (ten-int), 8972 (ten-rev)
Tab pass set in its spec the branch that holds the ten new pages (main once they are live) set in its spec set in its spec set in its spec
Releases main — release — 8990
  • feat/see-inside-compare holds the unapproved pilot (the switch on Parallax Scrolling, and its lesson line and learn/ until Phase 0 removes them), so nothing that may go live before the rollout is cut from it.
  • The main checkout stays on feat/see-inside-compare for the whole run: every agent reads its CLAUDE.md, and review servers serve it. It is never switched to another branch.
  • The before-pictures server (8800) serves a detached checkout of main, so main stays free for the release worktree.
  • feat/learn-pilot stays as it is.

Machine

  • One pool of eight page checks for the whole machine: slots/slot-1…8 in the rollout's run folder, made by the coordinator before any project starts. A check takes a slot by creating its folder (an atomic step) and removes it when done; the ten new animations and the tab pass use the same pool.
  • Headless Chrome only for page checks; the browser pane is the owner's. The one exception is Famous effects' live check of real sites, in the pane, only while the owner is not reviewing there.
  • One server and one scratch folder per worktree; no git stash (all worktrees share it); leftover hb-chrome-* temp folders removed at the end with the owner's OK.
  • On a usage-limit hit, the finder and Famous effects pause first, then the rollout runs fewer slots.

Who changes which file

Each project changes only what is named here; the coordinator merges one project at a time.

File Changed by Rule
Animation pages (animations/*/*/index.html) rollout (each page's views, one commit per page) · ten new (ten new pages, the Next link on five last pages) · tab pass (every top bar) · the version line: whoever bumps it (below) the finder and Famous effects never
index.html (home page) finder (FIND_Q, FIND, findMatches, the view and its CSS, the Find button, the Finder link in the bar) · Famous effects (a footer link) · ten new (cards, PLACES, FIND rows, previews, counts) · tab pass (Famous effects in the bar) · the version line: whoever bumps it (below) each only its own lines
assets/css/demo-page.css, assets/js/demo-page.js, tests/demo-page.test.js rollout (Phase 0; the first batch if the owner asks; integration) · ten new (integration, if needed) · tab pass only these, in this order, each with the next version number
tools/check-pages.mjs rollout (Phase 0: the do-it path, captions and copies, the learn target removed) · finder (steps in home) · Famous effects (the famous target) · tab pass (the bar) the finder and Famous effects add new functions and blocks, and touch shared lines only to list famous (usage line, header, target list)
tests/pages.test.js rollout (switch tests, the final gate, lesson selectors removed) · finder (404 cases) · Famous effects (sitemap count, footer link) · ten new (KEYBOARD_PAGES, PHONE_DEFAULTS) · tab pass (the pinned bar) each its own test blocks
tests/finder.test.js finder (new) · ten new (Ink Spread Reveal joins case 9 at integration)
famous/, tools/make-famous.mjs, tests/famous.test.js, tools/update-sitemap.mjs, tools/make-skill.mjs, tests/skill.test.js Famous effects
tools/make-social-image.mjs finder (hides .find-cta, #nav-find) · tab pass (hides its home-bar link)
404.html finder (whereTo, a third way back) · ten new (the count) · tab pass (its bar, if decided)
.github/ISSUE_TEMPLATE/ finder (animation_not_here.yml, a contact link in config.yml) · Famous effects (famous_effect.yml) · ten new (the count in config.yml)
CLAUDE.md, CONTRIBUTING.md, .github/pull_request_template.md finder · Famous effects · rollout · tab pass written at each project's integration, in merge order, on top of what main holds by then
README.md, CHANGELOG.md rollout (How to use, step 2) · finder (step 1) · Famous effects (a line after step 3) · ten new (counts, catalog); one Unreleased line each each only its own lines
Every written count (166 → 176) ten new only
Existing page READMEs (animations/*/*/README.md) ten new (one See also line on each of nine closest pages, at integration) the rollout changes no page README except where a ruling says so
Generated files nobody by hand merging rule 5

Version numbers (?v=N on the shared files)

  • Today: 8 on main (live), 9 on feat/see-inside-compare (the pilot).
  • 10: the rollout's Phase 0.
  • Then the next number, each only if needed: a shared change the owner asks for at the first batch (before the other 159 pages start); the rollout's integration (changes from the lanes' ledgers); the ten new animations' integration.
  • The tab pass always takes the next number.
  • A bump covers every animation page and the home page in one commit, on tracked files only (git ls-files), line endings kept. The Famous effects page links neither shared file. When main is merged into a branch, the higher number wins.

Merging and releasing

  1. Merge, never rebase or squash. Slots and lanes change only what their own spec allows and never take main's commits themselves.
  2. Before its release, a branch takes main's latest commits: the coordinator merges main into it, resolves the overlaps (rule 6), writes the generated files again (rule 5) and runs the tests, home and famous (once it exists).
  3. Release, only on the owner's word for that project: in the release worktree (on main) the coordinator merges the branch with --no-ff, writes the generated files again (rule 5), runs the tests, home and famous (once it exists) on the result, then pushes. When asking for the word, the coordinator names the next launch post.
  4. The same day, while the rollout is not yet live, the coordinator merges main into feat/see-inside-compare the same way as rule 2.
  5. Generated files are never merged by hand: sitemap.xml, llms.txt, skills/animation-handbook/, og-image.png and the two marked blocks of famous/index.html. After any merge, take either side, run node tools/update-sitemap.mjs, node tools/make-skill.mjs, node tools/make-famous.mjs (once famous/ exists) and, when the home page's top changed, node tools/make-social-image.mjs (with the repo served), and commit the result in the merge.
  6. The coordinator alone resolves overlaps, by the table above: each project keeps its own lines. Where a resolution needs more than keeping both sides (the learn target gone while famous stays), a fresh agent reviews it.
  7. Launch posts: Reddit on 2026-10-17, Show HN on 2026-10-25. Nothing merges into main from 2026-10-23 to 2026-10-26 without the owner's explicit word for that day, so the rollout can go live before Show HN if it is approved by 2026-10-22, and otherwise after 2026-10-26.