Skip to content

Canvix — Free & open-source graphic design tool. A community-built Canva alternative with a drag-and-drop editor, templates, shapes, text, images & one-click export. Works on desktop, tablet & mobile.

3.8 KB
Raw Blame

Canvix Funding Scope Matrix — FOSS United × NLnet × Unfunded × Shipped

Purpose: prove, line by line, that the FOSS United proposal funds work that no other funder is being billed for, and that nothing already completed is billed to anyone. Companion to CANVIX-FOSS-UNITED-PROPOSAL.md.

Statuses: ✅ shipped (unbilled) · 🔜 FOSS United application (this proposal) · 🔜 NLnet application (pending, not approved) · ⚪ unfunded project work (own cadence)

Work stream Status Funder Evidence / notes
Docker self-hosting + compose + scoped API keys (NLnet WP1) ✅ shipped — (unfunded) PR #77 (v0.24), docs/DOCKER.md, CI docker job — completed before any funding decision
Brief-contract extraction, rendered-compliance audit, layout planning, vision-critique-before-completion, fail-closed acks, skills engine (v0.29.4) ✅ shipped — (unfunded) PR #85, merged 2026-11-24 — the foundation this proposal builds on; the grant funds the next layer, not these commits
A. Design-output correctness — constraint edge cases, exact text/color preservation, native-element reliability, deterministic geometry checks, corpus in CI 🔜 FOSS United (M2, ₹1,20,000) FOSS United only Extends the shipped v0.29.4 internals into a public, reproducible corpus; no NLnet WP covers design-output correctness
B. Design evaluation — 20+ brief corpus, screenshot baseline, before/after harness, grounded review reports, fallback behavior 🔜 FOSS United (M1+M3, ₹2,50,000) FOSS United only Evaluation/QA infrastructure; orthogonal to every NLnet WP (which are feature + stability work)
C. Creator education & community — tutorials, onboarding, 2 engagements, open toolkit 🔜 FOSS United (M4, ₹1,30,000) FOSS United only Education/community output; not in NLnet scope anywhere
Test bench hardware (desktop + Android device) 🔜 FOSS United (M1, within ₹70,000 line) FOSS United only NLnet explicitly excludes workstation purchases; FOSS United line is a purpose-scoped test bench
Real-time collaboration scaling — LISTEN/NOTIFY hub, op-level undo broadcast (NLnet WP2) 🔜 NLnet NLnet only ROADMAP §3, ~120 h — zero overlap with A/B/C
Mobile/touch accessible editing (NLnet WP3) 🔜 NLnet NLnet only ROADMAP §3, ~60 h
Share roles + .canvix portability (NLnet WP4) 🔜 NLnet NLnet only ROADMAP §3, ~80 h
v1.0 stabilization gate — CI perf budgets, WCAG audit, self-hoster handbook, 1.0 tag (NLnet WP5 S1–S4) 🔜 NLnet NLnet only ROADMAP §3, ~60 h — note: M3's design fallback/verification work is agent correctness, not WCAG accessibility; no double billing
AI-provider track — z-ai-web-dev-sdk removal, provider-neutral adapter ⚪ unfunded — ~65 h, deliberately outside both applications (NLnet policy excludes AI connectors; FOSS United scope has no AI connector work)
Media GC, misc debt, release checklist upkeep ⚪ unfunded — Own cadence per ROADMAP §5

Double-funding audit (maintainer's commitment): funded commits carry distinguishing trailers — Grant: FOSSUnited M# vs Grant: NLnet WP# — and git log --grep='Grant: ' lists every billed commit. An auditor can reconstruct which funder paid for which hour from the public history alone. If either application is approved, the maintainer maintains a timesheet mapping hours to trailers; if both are approved, hours are allocated strictly along the matrix above (A/B/C + test bench to FOSS United; WP2–WP5 to NLnet; nothing billed twice).

If neither is funded: A/B/C proceed on the project's own cadence in ROADMAP's recommended order; the matrix still holds (the scope simply ships slower).