Skip to content

Use Garry Tan's exact Claude Code setup: 23 opinionated tools that serve as CEO, Designer, Eng Manager, Release Manager, Doc Engineer, and QA

TypeScript
270 B
Raw Blame
The plan's high-level structure is sound, but the rollback path writes the queue before the lock is held, and the docs still describe the old flag. The medium-term cleanup can wait.

Recommendation: fix the rollback ordering because a concurrent drain can lose records.