Skip to content

Use Garry Tan's exact Claude Code setup: 23 opinionated tools that serve as CEO, Designer, Eng Manager, Release Manager, Doc Engineer, and QA

TypeScript

fix: remove PR size nagging from /retro (v0.9.4.1) (#264)

Garry Tan1f4b6fd7a2a3
diff --git a/CHANGELOG.md b/CHANGELOG.md
index 2fa0a8440..69070ecdd 100644
--- a/CHANGELOG.md
+++ b/CHANGELOG.md
@@ -1,5 +1,11 @@
# Changelog
+## [0.9.4.1] - 2026-03-20
+
+### Changed
+
+- **`/retro` no longer nags about PR size.** The retro still reports PR size distribution (Small/Medium/Large/XL) as neutral data, but no longer flags XL PRs as problems or recommends splitting them. AI reviews don't fatigue — the unit of work is the feature, not the diff.
+
## [0.9.4.0] - 2026-03-20 — Codex Reviews On By Default
### Changed
diff --git a/VERSION b/VERSION
index 3544d2f06..199bf2ae5 100644
--- a/VERSION
+++ b/VERSION
@@ -1 +1 @@
-0.9.4.0
+0.9.4.1
diff --git a/retro/SKILL.md b/retro/SKILL.md
index bc1f5f329..ff4f7283c 100644
--- a/retro/SKILL.md
+++ b/retro/SKILL.md
@@ -435,7 +435,7 @@ From commit diffs, estimate PR sizes and bucket them:
- **Small** (<100 LOC)
- **Medium** (100-500 LOC)
- **Large** (500-1500 LOC)
-- **XL** (1500+ LOC) — flag these with file counts
+- **XL** (1500+ LOC)
### Step 8: Focus Score + Ship of the Week
@@ -627,14 +627,13 @@ Narrative interpreting what the team-wide patterns mean:
Narrative covering:
- Commit type mix and what it reveals
-- PR size discipline (are PRs staying small?)
+- PR size distribution and what it reveals about shipping cadence
- Fix-chain detection (sequences of fix commits on the same subsystem)
- Version bump discipline
### Code Quality Signals
- Test LOC ratio trend
- Hotspot analysis (are the same files churning?)
-- Any XL PRs that should have been split
- Greptile signal ratio and trend (if history exists): "Greptile: X% signal (Y valid catches, Z false positives)"
### Test Health
@@ -673,7 +672,7 @@ For each teammate (sorted by commits descending), write a section:
- "Fixed the N+1 query that was causing 2s load times on the dashboard"
- **Opportunity for growth**: 1 specific, constructive suggestion. Frame as investment, not criticism. Examples:
- "Test coverage on the payment module is at 8% — worth investing in before the next feature lands on top of it"
- - "3 of the 5 PRs were 800+ LOC — breaking these up would catch issues earlier and make review easier"
+ - "Most commits land in a single burst — spacing work across the day could reduce context-switching fatigue"
- "All commits land between 1-4am — sustainable pace matters for code quality long-term"
**AI collaboration note:** If many commits have `Co-Authored-By` AI trailers (e.g., Claude, Copilot), note the AI-assisted commit percentage as a team metric. Frame it neutrally — "N% of commits were AI-assisted" — without judgment.
diff --git a/retro/SKILL.md.tmpl b/retro/SKILL.md.tmpl
index a918e24a9..a81b12c92 100644
--- a/retro/SKILL.md.tmpl
+++ b/retro/SKILL.md.tmpl
@@ -231,7 +231,7 @@ From commit diffs, estimate PR sizes and bucket them:
- **Small** (<100 LOC)
- **Medium** (100-500 LOC)
- **Large** (500-1500 LOC)
-- **XL** (1500+ LOC) — flag these with file counts
+- **XL** (1500+ LOC)
### Step 8: Focus Score + Ship of the Week
@@ -423,14 +423,13 @@ Narrative interpreting what the team-wide patterns mean:
Narrative covering:
- Commit type mix and what it reveals
-- PR size discipline (are PRs staying small?)
+- PR size distribution and what it reveals about shipping cadence
- Fix-chain detection (sequences of fix commits on the same subsystem)
- Version bump discipline
### Code Quality Signals
- Test LOC ratio trend
- Hotspot analysis (are the same files churning?)
-- Any XL PRs that should have been split
- Greptile signal ratio and trend (if history exists): "Greptile: X% signal (Y valid catches, Z false positives)"
### Test Health
@@ -469,7 +468,7 @@ For each teammate (sorted by commits descending), write a section:
- "Fixed the N+1 query that was causing 2s load times on the dashboard"
- **Opportunity for growth**: 1 specific, constructive suggestion. Frame as investment, not criticism. Examples:
- "Test coverage on the payment module is at 8% — worth investing in before the next feature lands on top of it"
- - "3 of the 5 PRs were 800+ LOC — breaking these up would catch issues earlier and make review easier"
+ - "Most commits land in a single burst — spacing work across the day could reduce context-switching fatigue"
- "All commits land between 1-4am — sustainable pace matters for code quality long-term"
**AI collaboration note:** If many commits have `Co-Authored-By` AI trailers (e.g., Claude, Copilot), note the AI-assisted commit percentage as a team metric. Frame it neutrally — "N% of commits were AI-assisted" — without judgment.