π€― LobeHub - Super-Agents on Your Team. Add super-agents to the chats your team already uses.They take on work by themselves and get better every week.
Agent Goals product and UX audit
Scope
Audited the complete implemented journey:
Topic Goal lab gate
β Agent navigation
β Goal list
β Goal detail
β Acceptance checks and latest result
β Task execution plan
β Agent runs / operations
Evidence sources: task and acceptance domain types, Task lifecycle/store behavior, Goal list/detail routes, Agent navigation, Acceptance bundle hooks, and browser verification against representative local data.
Product model
| Concept | Business role | Terminal fact |
|---|---|---|
| Goal | Stable result the Agent keeps pursuing | The user-visible objective remains stable while its plan and runs change |
| Acceptance | Decision contract and evidence for whether the result is good enough | Human acceptance closes the delivery lifecycle; verifier output is supporting evidence |
| Task | Current executable plan for pursuing the Goal | Task status describes execution, not Goal success |
| Task execution | One scheduled/manual/heartbeat attempt represented by a task topic | Produces an execution outcome and may trigger verification or another round |
| Agent run | Gateway operation actually executed by an Agent | Supplies execution provenance; it does not by itself mean the Goal succeeded |
The UI therefore treats Goal as the lookup object, Acceptance as attached proof, and Task/Agent Run as drill-down execution evidence.
User view model
When a user opens Goals, the first scan must answer:
- What outcomes is this Agent pursuing?
- Which goals need attention and how close are they to acceptance?
- On a Goal, what exactly is the target?
- How much execution has happened (Task executions and Agent runs)?
- What is the latest acceptance result, and what evidence supports it?
Chronology, task configuration, individual topics and operations are secondary audit dimensions. They remain accessible through the execution-plan drill-down.
Implemented corrections
- Goal list defaults to a dense list for scanning and supports explicit List/Card switching.
- Goal detail begins with the complete Goal definition.
- The first screen then shows Acceptance progress, Task execution count, Agent run count, round budget, and the latest acceptance result.
- Acceptance checks are displayed as the proof attached to the Goal, not as an unrelated report.
- Current execution plan is secondary and links to the existing Task Detail.
- Loading, transient error, not-found and lab-gated deep-link states are distinct.
End-to-end audit
| Stage | Expected behavior | Result |
|---|---|---|
| Gate | Disabled lab hides navigation and redirects Goal deep links | Covered |
| Entry | Goal is an Agent-level destination | Covered |
| Browse | Default list supports fast comparison; Card view remains available | Covered |
| Inspect | Goal definition and progress lead; execution internals are secondary | Covered |
| Judge | Acceptance checks and latest result are visible | Covered |
| Investigate | User can open the underlying Task execution plan | Covered |
| Recover | Fetch errors offer retry; missing Goal is not reported as a network error | Covered |
Honest remaining boundaries
Direct Goal creation β not modeled as a management-page event
Goals are currently created through the /goal conversation flow, which creates
the goal-marked root Task and Acceptance contract. The Goal page has no standalone
create event or form contract. Adding a decorative Create button would promise a
business event that does not yet exist. A future slice should first define whether
creation starts a conversation draft, creates a durable Goal immediately, or opens
a structured contract editor.
At-scale browsing β data capability required
The current Goal query is capped at 100 records and has no cursor/search contract. The view is suitable for the current Agent-level collection, but a 10k Goal manager requires server-side pagination, search, sort and status facets so counts and empty results remain truthful across the full set.
Dedicated Goal lifecycle actions β intentionally delegated
Pause/resume/run controls currently belong to the underlying Task execution model. Before adding Goal-level controls, the controller must define their business event: whether they pause scheduling only, suspend all external wakes, or terminate the Goal contract. Until then, Goal Detail links to Task Detail rather than presenting ambiguous controls.
Coverage signal
- High confidence: navigation, gate, list/detail information architecture, Acceptance projection, Task drill-down, local loading/error behavior.
- Medium confidence: Agent run count is derived from persisted/running operation provenance in task activities; the future dedicated Goal model should expose an explicit aggregate rather than relying on projection.
- Not covered by the current model: controller wake history, cost budget, deadline, lease ownership and Goal-level pause/terminate semantics described in the broader architecture proposal.