Sub-issues
Whether to split an issue, and how sub-issues and stages start, order and wake work.
- Before splitting: one issue, one PR
- Sub-issues: todo starts once unblocked, backlog parks it
- Incorrect to correct
Before splitting: one issue, one PR
The default for an issue is one agent and one PR, however large. Sub-issues cost more than they look: each child run starts without the discussion that produced it, parallel PRs collide on shared files and migration numbers, and a contract written before either side exists is only checked once both land.
Split only when every piece passes all of these:
- It can be merged and verified on its own. Someone can review and test it without the other pieces.
- It touches separate code, or another repository, so parallel PRs do not conflict.
- Or it needs a different owner: a human step (configuring an app, approving access), a different agent, a different team.
Slice by user-visible behavior, never by layer. Backend / frontend / API contract sub-issues of one feature fail the first test. Work that does parallelize well: unrelated bugs, separate repositories, independent research directions, and large mechanical changes such as translations.
A PR that is large to review is not a reason to split. Organize it into reviewable commits and put a review guide in its description.
When you do split, say in the parent comment why each piece is independent.
Each child's run gets a [Parent issue] block that points it at the parent,
so the child's description carries its scope and acceptance criteria; it does
not need to restate every decision made on the parent.
Sub-issues: todo starts once unblocked, backlog parks it
On an agent-assigned issue, create status decides whether the assignee fires.
A non-backlog status (e.g. todo) enqueues the agent as soon as no earlier
stage or --blocked-by issue it waits on is still unfinished. backlog sets
the assignee without triggering, even after those waits end.
| Need | Create the child with |
|---|---|
| Children that run in parallel | --status todo, no stage |
| Children that run in order, each starting on its own | --stage <N> and --status todo |
| A step the parent reviews results before starting | that step's stage with --status backlog |
| A wait on an issue outside this parent, or on one sibling rather than a whole stage | --blocked-by <issue> (references/dependencies.md) |
Order sub-issues of one parent with stages, not with --blocked-by chains.
Parallel children — all start now:
multica issue create --title "..." --parent <issue-id> --assignee <agent> --status todo
Stages: order sub-issues into barrier groups
--stage <N> (N >= 1) groups sub-issues under the same parent into ordered
stages. A staged sub-issue waits until every sub-issue in an earlier stage
reaches a done or closed category (including cancellation); issue get lists
those waits in blocked_by with via: stage. They are computed from the
current siblings and no dependency edges are stored, so moving, restaging or
deleting a sibling immediately changes the wait. A later stage created as
todo starts automatically once earlier stages end. Use this as the default.
Create the later stage as backlog when the parent must review results before
promoting it. Manual blockers combine with stage waits; a manual edge that
cycles through a stage is rejected.
The platform's sub-issue wakeup wakes the parent assignee when a stage
closes while the next stage has backlog work to promote — every sub-issue up
to that stage has reached a terminal status (done/cancelled) — and once
more when every sub-issue, staged or not, is closed. A completion that closes
nothing is silent. A sibling set with no stages wakes the parent once, when
the last sub-issue finishes. A parent in backlog is not woken; it catches up
once it leaves backlog. A member assignee gets an inbox notification instead of
a run.
# Stages start in order on their own; the parent reviews before Ship
multica issue create --title "Research A" --parent <id> --assignee <agent> --stage 1 --status todo
multica issue create --title "Research B" --parent <id> --assignee <agent> --stage 1 --status todo
multica issue create --title "Build" --parent <id> --assignee <agent> --stage 2 --status todo
multica issue create --title "Ship" --parent <id> --assignee <agent> --stage 3 --status backlog
Build starts once both Research sub-issues end. When Build ends, you (the parent
assignee) are woken by the sub-issue wakeup because Ship is parked; its
[WAKEUP] block lists every stage and names the next one. Inspect the layout,
then promote the next stage:
multica issue children <parent-id> # sub-issues grouped by stage
multica issue status <child-id> todo # promote when its deps are met
issue children --output json reports per-stage done counts, including custom
statuses in terminal categories. When reading issue JSON, status is the exact
key; status_category retains the seven-value API enum for installed clients:
backlog / todo mean unstarted, in_progress / in_review / blocked mean
started, done means successful terminal, and cancelled means cancelled
terminal (the internal closed category). These values encode lifecycle, not
built-in automation behavior. Check status_category for done / cancelled
(or use the stage counts), not just the concrete status key, to recognize
terminal children.
Read each sub-issue's description before promoting and only promote items whose
stated dependencies are met; if a description conflicts with the parent's
breakdown, leave it backlog and comment to confirm first.
Incorrect to correct
Splitting one feature:
# incorrect — sliced by layer; no piece can be verified alone
MUL-10 Backend: merge API MUL-11 Frontend: merge button
# correct — one issue, one PR, reviewable commits
MUL-9: merge PRs from Multica (api, then UI, then docs as separate commits)
Serial / phased sub-issues (don't start the whole chain at once):
# incorrect — all fire immediately, no ordering
multica issue create --title "Step 2" --parent <issue-id> --assignee <agent> --status todo
multica issue create --title "Step 3" --parent <issue-id> --assignee <agent> --status todo
# correct — stage them; each step starts when the previous one ends
multica issue create --title "Step 1" --parent <issue-id> --assignee <agent> --stage 1 --status todo
multica issue create --title "Step 2" --parent <issue-id> --assignee <agent> --stage 2 --status todo
multica issue create --title "Step 3" --parent <issue-id> --assignee <agent> --stage 3 --status todo