AiSOC — Community-Feedback-Driven Roadmap (2026-05-12)
Status: a dated snapshot, not the current plan. These artefacts were produced by a community-feedback synthesis pass on 2026-05-12, against the v7.1 line. The tree has since moved several majors past that. They are kept as received —
scripts/check_deferral_tracker.pyexcludes this directory for exactly that reason — so theF-ID trail from feedback to shipped work survives. For what is planned now, read/ROADMAP.md; for what actually works, read/docs/audit/REPOSITORY_REALITY.md.
This directory captures the planning artifacts derived from that synthesis pass. No second pass has been run, so there is no later dated directory beside it.
Contents
| File | Purpose |
|---|---|
AiSOC_ROADMAP.md |
Now / Next / Later strategic narrative — 30-day, 30–90-day, and 90+-day buckets. |
AiSOC_Community_Feedback_Synthesis.md |
Themed feedback log with stable IDs (F001–Fxxx) for traceability. |
AiSOC_Proposed_Issues.md |
23 implementation tickets, each tagged with Feedback Item: Fxxx. |
How these docs are used
F-IDsare stable. Every issue, PR, and commit that addresses a feedback theme should reference the matchingFID in its body so the trail back to the originating feedback survives refactors.- The "Now" bucket was the work-in-flight queue as of 2026-05-12, scoped
to the 30 days after that date on the v7.1 line. It is history now. This
README previously pointed at a root
PROGRESS.mdfor its status; that file is gitignored and has never been committed, so the pointer resolved to nothing. Release-by-release status lives in/CHANGELOG.md. - "Next" and "Later" are intent, not commitment. They get re-prioritized on the next synthesis pass.
- Path & module references in the issue drafts are not authoritative.
They were path-corrected against the v7.1.0 baseline and nothing since.
Where a draft conflicts with
main,mainwins — this README used to say the opposite, which on a v12 tree would send a contributor to rename working code to match a snapshot from eight majors ago.
Reconciliation notes (carried forward)
The 2026-05-12 synthesis revealed some drift between CHANGELOG.md and the
state of main. The relevant correction lives in
/CHANGELOG.md under the [7.0.x] heading: the
PR1–PR6 endpoint-telemetry wave was developed on
feat/pr6-osquery-extensions and not merged into main. The generic
live_action interface (Issue #8) is
therefore built fresh on main, not on top of those primitives.
Workflow
- Pick an issue from
AiSOC_Proposed_Issues.md. - Open a GitHub issue using the draft body (or reference the file if the
draft is faithful enough to skip re-typing). Apply the
area:subarealabels listed in the draft. - Re-verify every path the draft names against
mainbefore you start. - Branch off
main, implement against the acceptance criteria, satisfy the eval gates listed in/AGENTS.mdwhen relevant. - PR title format:
[F<id>] <area>: <change>so the feedback trail is visible ingit log.
Next synthesis pass
The 2026-05-12 pass planned a 30-day cadence. It was not repeated, and
2026-05-12/ remains the only dated directory here. A future pass would land
beside it under its own date.