Open-source AI Security Operations Center: alert fusion, LLM-agent triage, MITRE ATT&CK investigation, and a replayable decision ledger for every agent step. Self-hostable, runs with no API keys, MIT licensed. Ships an MCP server for Claude, Cursor and Continue.
ADR-0002 — Compliance claims: "controls aligned to" until a Type I audit lands
- Status: accepted
- Date: 2026-06-28
- Decision-makers: Beenu Arora (founder), AiSOC core team
- Context: the Phase 1.3 fix already landed in v8.x.
- Not followable: this ADR was written against a missing-pieces plan that is not in this repository —
plans/aisoc-missing-pieces/has never been committed — so the section numbers it cited cannot be looked up. The decision stands on its own text.
Context
The original landing surface asserted SOC 2 · ISO 27001 · GDPR · DPDP on every deployment row of the /sovereign matrix as if those were attested certifications. They are not. No third-party audit has ever been commissioned against the AiSOC platform; what we have is an internal SOC2View.tsx self-attestation surface that helps tenants track their controls — not a SOC 2 report for AiSOC.
Phase 1.3 of the missing-pieces plan already softened those claims to "controls aligned to" across /sovereign, Features.tsx, and the README. That's a temporary patch. The strategic question is whether the AiSOC platform should commission a real audit programme, or commit permanently to the "controls aligned to" framing.
The two paths from the plan are:
- (a) Commission SOC 2 Type I → Type II → ISO 27001 audits with the timelines from the original spec (Month 9 / Month 12 / Month 18).
- (b) Permanently reframe every compliance claim across landing / docs as "controls aligned to" instead of unqualified framework names.
Decision
We adopt a third path that's the honest middle ground: keep the "controls aligned to" framing in marketing for now, and commit to a Type I audit in the next fiscal year as the gating event for graduating the framing.
Concretely:
- All current marketing surfaces stay as "controls aligned to ..." with no audit-status assertions. This was already landed in Phase 1.3 and is non-regressing — the CI check at
scripts/audit_compliance_claims.py(added in Phase 1.3) fails the build if anyone re-asserts unqualified framework names. - We commission SOC 2 Type I in the first fiscal quarter that has both >$500k ARR and an enterprise design partner who needs it for procurement. We do not chase the audit speculatively; the audit costs (~$25–40k + ~3 months of an engineer's time) only pencil out against a concrete revenue gate.
- ISO 27001 and DPDP wait — Type II + ISO are sequenced after the first Type I report (typically 12 months apart). DPDP requires Indian establishment which we do not have today.
- GDPR is a self-attestation regime, not an audited one. We document our GDPR posture (controller/processor mapping, DPA template, DSR workflow) under
docs/compliance/gdpr.mdand link it from/sovereign. No audit is needed; what's needed is a published policy. That doc lands in the same release as this ADR. - The
/sovereignpage gets a "Roadmap" footer that surfaces the path from "controls aligned" → "Type I attested" → "Type II attested" so prospects can see where we are.
Consequences
Code changes that land alongside this ADR
apps/web/src/app/(marketing)/sovereign/page.tsx— add a "Compliance roadmap" callout below the deployment matrix.docs/compliance/gdpr.md(new) — GDPR posture: controller/processor mapping, DPA template, DSR workflow, sub-processor list.docs/compliance/README.md(new) — index of the compliance docs surface.scripts/audit_compliance_claims.pyalready exists from Phase 1.3; no change.
Marketing posture
- We do not claim unqualified SOC 2 / ISO 27001 anywhere on the landing or docs.
- We do publish our internal control mappings against those frameworks so prospects can see what we cover, even pre-audit.
- The Cyble-managed SaaS row on
/sovereignretains its(target)qualifier and inherits the same roadmap.
Roadmap
- Type I audit: trigger event = "first enterprise design partner where audit is procurement-blocking". Estimated calendar quarter: H2 2027.
- Type II audit: 12 months after Type I report lands.
- ISO 27001: stage 1 audit aligned to Type II calendar.
- DPDP: deferred until Indian establishment.
Alternatives considered
- Commission a Type I audit immediately, independent of revenue.
- Rejected: the $25–40k cash cost and ~3 months of engineering time are a meaningful fraction of seed-stage runway. We commission the audit when it converts a concrete deal, not on speculation.
- Permanently commit to "controls aligned to" framing with no audit on the roadmap.
- Rejected: enterprise procurement requires Type II or ISO for serious deals. Permanently disclaiming an audit closes off the upper market.
- Claim audit certifications now and reframe if challenged.
- Rejected: misleading. Every reframe of this kind during an enterprise procurement cycle becomes a deal-killer.
Open questions
- Is GDPR's DSR endpoint (a real
POST /api/v1/dsrsurface for tenants to forward subject requests) in scope for the OSS repo or only for managed mode? Current default: OSS ships the endpoint stub, managed mode wires the operator workflow.
Supersedes / superseded by
- Supersedes: none.
- Superseded by: none.