Open-source AI Security Operations Center: alert fusion, LLM-agent triage, MITRE ATT&CK investigation, and a replayable decision ledger for every agent step. Self-hostable, runs with no API keys, MIT licensed. Ships an MCP server for Claude, Cursor and Continue.
Python agentic-aiai-securityalert-triageblue-teamcybersecuritydetection-engineeringincident-responselanggraphllm-agentsmcpmitre-attackmodel-context-protocolpurple-teamsecurity-operationsself-hostedsiemsoarsocthreat-detectionthreat-intelligence
docs(roadmap): state program status precisely (12/13 landed, Phase 4c pending) (#438)
Beenu Aroraa9d084eb3c24
diff --git a/ROADMAP.md b/ROADMAP.mdindex 72ef574a1..e46b31a96 100644--- a/ROADMAP.md+++ b/ROADMAP.md@@ -36,7 +36,7 @@ A proof-first, security-first program to make every README claim gate-backed, cl- [x] Phase 11 — API / SDK / release engineering (pure-Python OpenAPI breaking-change detector `scripts/openapi_diff.py` + `openapi-breaking.yml` gate: PR spec vs base fails on removed endpoint/schema/field, type change, tightened request, or dropped enum value — closes the OpenAPI NO GATE row; per-language SDK generated-client contract-drift tracked as 11b)- [x] Phase 12 — Observability + governance (per-service SLOs in `docs/operations/slos.yaml` with a coverage gate; `docs/operations/observability.md` documenting the four golden signals + single OTel trace across the spine; `GOVERNANCE.md` + `MAINTAINERS.md` + DCO sign-off in `CONTRIBUTING.md`; governance-completeness gate — `governance.yml`)-**All 13 phases (0–12) of the World-Class Hardening Program have landed.** The claim-to-gate matrix stands at **15 GATED / 11 PARTIAL / 1 NO GATE** (the last NO GATE — wet-eval live-agent scoreboard tables — needs a budgeted live-agent run, tracked as Phase 4c). Honestly-scoped continuations remain per phase (3.5+, 4c, 7b, 9b, 10b, 11b) and are tracked in `docs/audit/PROGRESS.md`; none change the committed phase checklist above.+**Program status:** 12 of the 13 phases (0–3, 5–12) are fully landed; Phase 4 is partially landed (4a/4b shipped — the de-circularised DAC gate + the honest executable-vs-imported detection truth table) with **4c pending a budgeted live-agent run** (live-agent eval / calibration / model matrix / wet-eval live tables). The claim-to-gate matrix stands at **15 GATED / 11 PARTIAL / 1 NO GATE** — the single remaining NO GATE row is exactly that wet-eval live-agent scoreboard, and it closes with 4c. Honestly-scoped per-phase continuations (3.5+, 4c, 7b, 9b, 10b, 11b) are tracked in `docs/audit/PROGRESS.md`; none change the committed phase checklist above.## v4.0 — Shipped