Skip to content

Turn Claude Code into a full game dev studio — 49 AI agents, 72 workflow skills, and a complete coordination system mirroring real studio hierarchy.

1.7 KB
Raw Blame

Gate definition. The spawning skill passes this file's path to the director agent; the AGENT reads it — the parent session should not.

PR-EPIC — Epic Structure Feasibility Review

Agent: producer | Model tier: Opus | Domain: Scope, timeline, dependencies, production risk

Trigger: After epics are defined by /create-epics, before stories are broken out — validates the epic structure is producible before /create-stories is invoked

Context to pass:

  • The epic structure for the layer, inline — every epic's scope summary and governing-ADR count. /create-epics runs this gate before writing any epic file, so there are no paths yet.
  • Milestone timeline and target dates
  • Team capacity (solo / small team / size)
  • Layer being epiced (Foundation / Core / Feature / etc.)

Prompt:

"Review this epic structure for production feasibility before story breakdown begins. Are the epic boundaries scoped appropriately — could each epic realistically complete before a milestone deadline? Are epics correctly ordered by system dependency — does any epic require another epic's output before it can start? Are any epics underscoped (too small, should merge) or overscoped (too large, should split into 2-3 focused epics)? Are the Foundation-layer epics scoped to allow Core-layer epics to begin at the start of the next sprint after Foundation completes? Return REALISTIC (epic structure is producible), CONCERNS [specific structural adjustments before stories are written], or UNREALISTIC [epics must be split, merged, or reordered — story breakdown cannot begin until resolved]."

Verdicts: REALISTIC / CONCERNS / UNREALISTIC