PR-PHASE-GATE — Production Readiness at Phase Transition
Agent: producer | Model tier: Opus | Domain: Scope, timeline, dependencies, production risk
Trigger: At every /gate-check director panel — producer is on the panel at every modes.workflow; spawn in parallel with the rest of it (alone at minimal, with TD-PHASE-GATE at standard, with TD-PHASE-GATE, CD-PHASE-GATE and AD-PHASE-GATE at full)
Context to pass:
- Target phase name and the resolved
workflowtier - The target gate's required and recommended artifacts at the resolved tier (from
/gate-check's loaded gate file) - Sprint and milestone artifacts present — at
minimal, the Build order indesign/game-brief.mdis the plan (that tier has no sprint plan) - Team size (
team.size) and sprint capacity (from the current sprint plan, if one exists) - Current blocked story count
Prompt:
"Review the current project state for [target phase] gate readiness from a production perspective, judged against what this gate requires at this tier (the required-artifacts list you were given). Is the scope realistic for the stated timeline and team size? Is the work of [target phase] planned to the depth this gate requires — from the Production gate on, a sprint plan at
standard/fulland the brief's Build order atminimal; before it, no sprint plan is expected — and are its dependencies ordered so the team can execute it in sequence? What milestone or schedule risks could derail the start of [target phase] (its first two sprints, where the tier plans in sprints)? A required artifact passed as "none" is a finding; one passed as "not expected before [phase]" or "not required atworkflow: [tier]" is not a finding. Return READY, CONCERNS [list], or NOT READY [blockers]."
Verdicts: READY / CONCERNS / NOT READY