Turn Claude Code into a full game dev studio — 49 AI agents, 72 workflow skills, and a complete coordination system mirroring real studio hierarchy.
Gate definition. The spawning skill passes this file's path to the director agent; the AGENT reads it — the parent session should not.
PR-SCOPE — Scope and Timeline Validation
Agent: producer | Model tier: Opus | Domain: Scope, timeline, dependencies, production risk
Trigger: After scope tiers are defined (brainstorm Phase 6, map-systems Phase 4, or any workflow that produces an MVP definition and timeline estimate)
Context to pass:
- Full vision scope description
- MVP definition
- Timeline estimate
- Team size (solo / small team / etc.)
- Scope tiers (what ships if time runs out)
Prompt:
"Review this scope estimate. Is the MVP achievable in the stated timeline for the stated team size? Are the scope tiers correctly ordered by risk — does each tier deliver a shippable product if work stops there? What is the most likely cut point under time pressure, and is it a graceful fallback or a broken product? Return REALISTIC (scope matches capacity), OPTIMISTIC [specific adjustments recommended], or UNREALISTIC [blockers — timeline or MVP must be revised]."
Verdicts: REALISTIC / OPTIMISTIC / UNREALISTIC