Turn Claude Code into a full game dev studio — 49 AI agents, 72 workflow skills, and a complete coordination system mirroring real studio hierarchy.
Adoption Plan
Generated: [date] Project phase: [phase] Engine: [name + version, or "Not configured"] Template version: v1.0+
Work through these steps in order. Check off each item as you complete it.
Re-run /adopt anytime to check remaining gaps.
Step 1: Fix Blocking Gaps
[One sub-section per blocking gap with problem, fix command, time estimate, checkbox]
Step 2: Fix High-Priority Gaps
[One sub-section per high gap]
Step 3: Bootstrap Infrastructure
[At workflow: minimal, replace 3a–3d with one line: "Not on the minimal path —
the brief's build order is the plan. Next: /create-stories (or /dev-story
once stories exist)."]
3a. Register existing requirements (creates tr-registry.yaml)
Run /architecture-review — even if ADRs already exist, this run bootstraps
the TR registry from your existing GDDs and ADRs.
Time: 1 session (review can be long for large codebases)
- tr-registry.yaml created
3b. Create control manifest
Run /create-control-manifest
Time: 30 min
- docs/architecture/control-manifest.md created
3c. Create sprint tracking file
Run /sprint-plan update
Time: 5 min (if sprint plan already exists as markdown)
- production/sprint-status.yaml created
3d. Set authoritative project stage
Run /gate-check [current-phase] (the gate into the phase the project is in;
at Concept there is none — Concept is the default stage, nothing to run)
Time: 5 min
-
project.stageinproject.yamlwritten (legacyproduction/stage.txtalso updated)
Step 4: Medium-Priority Gaps
[One sub-section per medium gap]
Step 5: Optional Improvements
[One sub-section per low gap]
What to Expect from Existing Stories
Existing stories continue to work with all template skills. New format checks (TR-ID validation, manifest version staleness) auto-pass when the fields are absent — so nothing breaks. They won't benefit from staleness tracking until regenerated. Do not regenerate stories that are in progress or done.
Re-run
Run /adopt again after completing Step 3 to verify all blocking and high gaps
are resolved. The new run will reflect the current state of the project.