Skip to content

Turn Claude Code into a full game dev studio — 49 AI agents, 72 workflow skills, and a complete coordination system mirroring real studio hierarchy.

2.2 KB
Raw Blame

Adoption Plan

Generated: [date] Project phase: [phase] Engine: [name + version, or "Not configured"] Template version: v1.0+

Work through these steps in order. Check off each item as you complete it. Re-run /adopt anytime to check remaining gaps.


Step 1: Fix Blocking Gaps

[One sub-section per blocking gap with problem, fix command, time estimate, checkbox]


Step 2: Fix High-Priority Gaps

[One sub-section per high gap]


Step 3: Bootstrap Infrastructure

[At workflow: minimal, replace 3a–3d with one line: "Not on the minimal path — the brief's build order is the plan. Next: /create-stories (or /dev-story once stories exist)."]

3a. Register existing requirements (creates tr-registry.yaml)

Run /architecture-review — even if ADRs already exist, this run bootstraps the TR registry from your existing GDDs and ADRs. Time: 1 session (review can be long for large codebases)

  • tr-registry.yaml created

3b. Create control manifest

Run /create-control-manifest Time: 30 min

  • docs/architecture/control-manifest.md created

3c. Create sprint tracking file

Run /sprint-plan update Time: 5 min (if sprint plan already exists as markdown)

  • production/sprint-status.yaml created

3d. Set authoritative project stage

Run /gate-check [current-phase] (the gate into the phase the project is in; at Concept there is none — Concept is the default stage, nothing to run) Time: 5 min

  • project.stage in project.yaml written (legacy production/stage.txt also updated)

Step 4: Medium-Priority Gaps

[One sub-section per medium gap]


Step 5: Optional Improvements

[One sub-section per low gap]


What to Expect from Existing Stories

Existing stories continue to work with all template skills. New format checks (TR-ID validation, manifest version staleness) auto-pass when the fields are absent — so nothing breaks. They won't benefit from staleness tracking until regenerated. Do not regenerate stories that are in progress or done.


Re-run

Run /adopt again after completing Step 3 to verify all blocking and high gaps are resolved. The new run will reflect the current state of the project.