Turn Claude Code into a full game dev studio — 49 AI agents, 72 workflow skills, and a complete coordination system mirroring real studio hierarchy.
Shell ai-agentsai-assisted-developmentanthropicclaudeclaude-codegame-designgame-developmentgamedevgodotindie-game-devunityunreal-engine
Risk: [Short Title]
Identification
- ID: RISK-[NNNN]
- Identified By: [Agent or person]
- Date Identified: [Date]
- Category: [Technical | Design | Schedule | Resource | External | Quality]
Assessment
- Probability: [Very Low | Low | Medium | High | Very High]
- Impact: [Minimal | Minor | Moderate | Major | Critical]
- Risk Score: [Probability x Impact = Low / Medium / High / Critical]
Description
[Detailed description of the risk. What could go wrong? Under what conditions?]
Trigger Conditions
[What observable conditions would indicate this risk is materializing?]
- [Condition 1]
- [Condition 2]
Impact Analysis
If This Risk Materializes
- Schedule Impact: [How many days/weeks of delay]
- Quality Impact: [What quality degradation]
- Scope Impact: [What features affected]
- Cost Impact: [Resource cost of dealing with it]
Affected Systems/Features
- [System 1]
- [System 2]
Mitigation Strategy
Prevention (reduce probability)
- [Action to prevent this risk from occurring]
- [Owner and deadline for prevention action]
Contingency (reduce impact if it occurs)
- [Action to take if this risk materializes]
- [Owner responsible for contingency execution]
Current Status
- Status: [Open | Mitigating | Occurred | Closed]
- Last Reviewed: [Date]
- Trend: [Increasing | Stable | Decreasing]
- Notes: [Any updates]