Skip to content

Turn Claude Code into a full game dev studio — 49 AI agents, 72 workflow skills, and a complete coordination system mirroring real studio hierarchy.

1.6 KB
Raw Blame

Phase 4: Producer review (PR-EPIC)

Read only when the review_gate line says skill-gates=run (review_mode: full). Run it once every epic in scope is defined and before any write. The agent reads its own gate file; do not read it here.

Hand the review to the producer agent with gate PR-EPIC. Brief:

  • Objective: judge whether the epic structure for this layer is realistic to deliver.
  • Give it: every epic defined in Phase 3 with its scope summary and governing ADR count, the layer being processed, the milestone timeline and the team's capacity (from production/milestones/ and project.yaml's team.size, or "none recorded").
  • Return: REALISTIC, CONCERNS, UNREALISTIC, or NOT ASSESSED naming a missing input, with reasons.
  • Boundaries: it writes no file.

Act on the verdict:

  • REALISTIC: go to Phase 5.
  • CONCERNS: ask "The producer raised concerns about the epic structure. How do you want to go on?" Options: Go on as planned — I accept the concerns / Revise the epic boundaries / Stop — I want to rethink the scope. Revise: change the epics, show them again, and run the review again. Stop: Verdict: BLOCKED — user is rethinking the epic scope.
  • UNREALISTIC: offer to split overscoped epics or merge underscoped ones, show the revised epics, and run the review again before writing.
  • NOT ASSESSED: it is not REALISTIC. Name what was missing, then supply it and run it again; or, when the user chooses to go on without it, go to Phase 5 and state PR-EPIC: NOT ASSESSED — [input] in the reply and the closing block.

Write no epic until the review resolves.