Skill Test Spec: /sprint-plan

Skill Summary

/sprint-plan (new, update or status) plans a sprint from the story backlog. It globs production/epics/**/story-*.md, greps their status lines and plans from the stories marked Ready, as many as story_granularity allows; it reads the previous sprint (identified from the injected Existing Sprints listing) for velocity and carryover, and the milestone in production/milestones/ and GDDs for context when they exist. For new it numbers the sprint one past the highest sprint-NNN.md in the listing and presents a draft with Must Have / Should Have / Nice to Have task tables and a Carryover from Previous Sprint table (every not-Complete story of the previous sprint, listed there only) before any write, and prepares production/sprint-status.yaml alongside it. The review mode comes from the injected config block, --review overriding it for one run; the skill never asks for one and never writes modes.review_mode or production/review-mode.txt. In full review mode the PR-SPRINT producer gate reviews the draft; in lean and solo modes the gate is skipped with a note. A QA plan check runs in every mode. The skill asks "May I write the sprint plan to production/sprints/sprint-NNN.md and production/sprint-status.yaml?" before persisting. Verdicts: COMPLETE (both files written) or BLOCKED (no stories found, or write declined).


Static Assertions (Structural)

Checked against the SKILL.md by /skill-test spec — no fixture needed.

  • Has required frontmatter fields: name, description, argument-hint, user-invocable, allowed-tools
  • Has ≥2 phase headings
  • Contains verdict keywords: COMPLETE, BLOCKED
  • Contains "May I write" language (skill writes sprint file)
  • Has a next-step handoff (/qa-plan sprint, /story-readiness, /dev-story)

Director Gate Checks

Gate ID Trigger condition Mode guard
PR-SPRINT After the draft is presented, before write approval full only (not lean/solo)

PR-SPRINT verdicts: REALISTIC / CONCERNS / UNREALISTIC — or NOT ASSESSED [missing input] (.claude/docs/director-gates.md), which is never treated as REALISTIC.


Fixture Defaults

Every case's project.yaml sets modes.rigor: minimal and modes.automation: collaborative, with no project.local.yaml, unless its own Fixture says otherwise. Rules: studio-tests/CLAUDE.md § Fixture defaults.


Test Cases

Case 1: Happy Path — Ready backlog generates sprint

Fixture:

  • The injected Existing Sprints listing shows sprint-001.md and sprint-002.md
  • production/milestones/milestone-02.md exists
  • 5 stories under production/epics/ across 2 epics have Status: Ready
  • project.yaml sets modes.review_mode: full and modes.story_granularity: balanced (6–10 stories per sprint)
  • production/qa/qa-plan-sprint-003.md exists
  • The producer returns REALISTIC

Input: /sprint-plan new

Expected behavior:

  1. Skill reads the milestone and the previous sprint (sprint-002)
  2. Skill globs production/epics/**/story-*.md, greps the status lines, and plans all 5 Ready stories — fewer than balanced allows, so the backlog is the limit
  3. Skill numbers the new sprint 003 (sprint-002 is the highest in the listing) and presents the draft without asking to write
  4. Skill spawns PR-SPRINT with the story list, capacity, carryover and milestone constraints; presents the REALISTIC assessment
  5. QA plan check finds production/qa/qa-plan-sprint-003.md and notes it
  6. Skill asks "May I write the sprint plan to production/sprints/sprint-003.md and production/sprint-status.yaml?"
  7. User approves; both files are written; verdict COMPLETE

Assertions:

  • Stories come from production/epics/**/story-*.md via the status grep, and only Ready stories are planned
  • All 5 Ready stories are planned — balanced allows 6–10, so none is held back
  • Sprint draft is shown before any write prompt or gate invocation
  • PR-SPRINT gate is invoked in full mode after the draft is presented
  • "May I write" prompt names both production/sprints/sprint-003.md (next after sprint-002) and production/sprint-status.yaml
  • Verdict is COMPLETE after both files are written

Case 2: Blocked Path — No stories in the backlog

Fixture:

  • production/epics/ contains no story files (production/epics/**/story-*.md matches nothing)
  • No --review flag, no modes.review_mode in project.yaml, no production/review-mode.txt

Input: /sprint-plan new

Expected behavior:

  1. Phase 0 takes the review mode from the injected config block — with nothing configured, the modes.rigor value — and asks no review-depth question
  2. Phase 1's glob returns nothing; skill outputs "No stories found under production/epics/. Run /create-stories first (at standard/full, /create-epics before it)."
  3. Skill stops without inventing work items; verdict BLOCKED
  4. No gate is invoked and nothing is written

Assertions:

  • Verdict is BLOCKED
  • Output contains "No stories found under production/epics/" and recommends /create-stories
  • No sprint draft is produced from invented work items
  • PR-SPRINT gate is NOT invoked
  • No review-depth question is asked, and no write happens — project.yaml gains no modes.review_mode and no production/review-mode.txt is created

Case 3: Gate returns CONCERNS — Sprint overloaded, revised before write

Fixture:

  • 8 Ready stories estimated at 16 days in total; available capacity is 10 days
  • project.yaml sets modes.review_mode: full and modes.story_granularity: balanced
  • A QA plan for the sprint exists in production/qa/
  • The producer returns CONCERNS: the sprint is overloaded

Input: /sprint-plan new

Expected behavior:

  1. Skill drafts the sprint with all 8 stories and presents it
  2. PR-SPRINT runs; producer returns CONCERNS
  3. Skill asks via AskUserQuestion: "Producer flagged concerns with this sprint plan. How do you want to proceed?" with [A] Proceed as planned, [B] Adjust scope, [C] Extend the sprint timeline
  4. User selects [B]; skill revises the story list and re-presents the plan
  5. Skill asks "May I write" for the revised plan; writes on approval

Assertions:

  • CONCERNS from PR-SPRINT surfaces through AskUserQuestion ([A] Proceed / [B] Adjust scope / [C] Extend timeline) before any write
  • On [B], the revised plan is re-presented before write approval
  • The revised sprint (not the original) is written, and production/sprint-status.yaml lists the revised stories
  • Verdict is COMPLETE after revision and write

Case 4: Lean Mode — PR-SPRINT skipped, QA plan check still runs

Fixture:

  • 4 Ready stories under production/epics/
  • project.yaml sets modes.rigor: standard and pins no review mode (no modes.review_mode, no production/review-mode.txt, no --review), so the injected block reads review_mode: lean (rigor:standard)
  • No QA plan for this sprint exists in production/qa/

Input: /sprint-plan new

Expected behavior:

  1. Skill reads review_mode from the injected config block — lean — and asks no review-depth question
  2. Skill drafts the sprint and presents it
  3. PR-SPRINT is skipped; output notes "PR-SPRINT skipped — Lean mode."
  4. The QA plan check still runs: skill states "This sprint has no QA plan …" and asks via AskUserQuestion with [A] Run /qa-plan sprint now and [B] Skip for now
  5. User selects [A]; skill asks for direct approval of the write
  6. User approves; both files are written; verdict COMPLETE

Assertions:

  • PR-SPRINT gate is NOT invoked in lean mode
  • Output contains "PR-SPRINT skipped — Lean mode."
  • The QA plan check still runs in lean mode — the missing QA plan is surfaced explicitly with the [A]/[B] choice, not passed silently
  • User approval is still required before the write (gate skip ≠ approval skip)
  • The resolved lean is used without a review-depth question, and the write names only the sprint plan and production/sprint-status.yaml — project.yaml gains no modes.review_mode and no production/review-mode.txt is created
  • Verdict is COMPLETE after the write

Case 5: Edge Case — Previous sprint still has open stories

Fixture:

  • The injected Existing Sprints listing shows sprint-002.md as the latest sprint
  • production/sprint-status.yaml still holds sprint 2; 2 of its stories are not done: one in-progress, and one ready-for-dev that was never started (its story file says Status: Ready)
  • 5 other stories have Status: Ready
  • project.yaml sets modes.review_mode: full and modes.story_granularity: balanced
  • A QA plan for the sprint exists in production/qa/

Input: /sprint-plan new

Expected behavior:

  1. Skill reads sprint-002 for velocity and carryover, and numbers the new sprint 003
  2. Skill plans the 5 other Ready stories in the Must Have / Should Have / Nice to Have tables
  3. The 2 unfinished sprint-002 stories appear in the "Carryover from Previous Sprint" table with a reason and a new estimate — the unstarted one there only, although its story file says Ready
  4. The carryover is passed to PR-SPRINT with the proposed story list
  5. Skill asks "May I write the sprint plan to production/sprints/sprint-003.md and production/sprint-status.yaml?" and writes on approval; the new yaml lists the 2 carryover stories alongside the 5 new ones

Assertions:

  • Skill reads the previous sprint (sprint-002, identified from the injected listing)
  • The 2 unfinished stories appear in the "Carryover from Previous Sprint" table with Reason and New Estimate — not silently dropped
  • The unstarted sprint-002 story appears only under Carryover — not again in Must Have / Should Have / Nice to Have, although its status is Ready
  • The carryover is passed to the PR-SPRINT gate
  • The written production/sprint-status.yaml lists the 2 carryover stories with their previous priority and current status (in-progress, ready-for-dev)

Case 6: Gate returns UNREALISTIC — Stories deferred before the write

Fixture:

  • The injected Existing Sprints listing shows sprint-002.md as the latest sprint
  • 9 Ready stories estimated at 20 days in total; available capacity is 10 days
  • project.yaml sets modes.review_mode: full and modes.story_granularity: balanced
  • A QA plan for the sprint exists in production/qa/
  • The producer returns UNREALISTIC and names 4 stories to defer

Input: /sprint-plan new

Expected behavior:

  1. Skill drafts sprint 003 with the 9 stories and presents it
  2. PR-SPRINT runs; producer returns UNREALISTIC
  3. Skill revises the selection — the 4 named stories move down to Should Have or Nice to Have — and re-presents the revised plan
  4. The QA plan check runs, then skill asks "May I write" for the revised plan
  5. User approves; both files are written; verdict COMPLETE

Assertions:

  • UNREALISTIC does not end the run, and the original plan is never written — the selection is revised first
  • The 4 named stories are deferred to Should Have or Nice to Have, not dropped from the plan
  • The revised plan is re-presented before the "May I write" prompt
  • The written production/sprint-status.yaml carries the deferred stories as should-have or nice-to-have with status: backlog
  • Verdict is COMPLETE after the write

Case 7: Gate returns NOT ASSESSED — No story estimates

Fixture:

  • 5 Ready stories, none with its Estimate filled in
  • project.yaml sets modes.review_mode: full and modes.story_granularity: balanced
  • A QA plan for the sprint exists in production/qa/
  • The producer returns NOT ASSESSED — the stories carry no estimates
  • Asked for estimates, the user has none yet and goes ahead

Input: /sprint-plan new

Expected behavior:

  1. Skill drafts the sprint and presents it; PR-SPRINT returns NOT ASSESSED
  2. Skill names the missing input (story estimates) and does not treat the result as REALISTIC; with no estimates to supply, it records PR-SPRINT as NOT ASSESSED — [missing input] in the plan's header
  3. The QA plan check runs; the "May I write" prompt repeats that PR-SPRINT was not assessed
  4. User approves; both files are written; verdict COMPLETE

Assertions:

  • The missing input (story estimates) is named in the output
  • NOT ASSESSED is not presented as REALISTIC — nothing says the plan's feasibility was reviewed
  • The CONCERNS options ([A] Proceed / [B] Adjust scope / [C] Extend timeline) are not raised for NOT ASSESSED
  • The written plan's header records PR-SPRINT as NOT ASSESSED with the missing input, and the "May I write" prompt says so before the write

Protocol Compliance

  • Shows the draft sprint before invoking PR-SPRINT or asking to write
  • Always asks "May I write" before writing, naming both the sprint file and production/sprint-status.yaml
  • Never asks for a review depth and never writes modes.review_mode or production/review-mode.txt — the resolved value (or --review) is used
  • PR-SPRINT gate only runs in full mode
  • Skip message appears in lean and solo mode output
  • The QA plan check runs in every review mode
  • Verdict (COMPLETE or BLOCKED) is clearly stated at the end of the skill output

Coverage Notes

  • update and status modes are not tested.
  • No milestone file is not tested; the skill notes "no milestone defined — planning against the story backlog alone" and continues rather than blocking.
  • Story files that exist with none marked Ready are not tested.
  • Solo mode behavior is equivalent to lean (gate skipped, user approval required) and is not separately tested.
  • The cases pin story_granularity to balanced (6–10 stories per sprint); the coarse (2–4) and fine (15–25) allocations are not tested.