Skill Test Spec: /day-one-patch

Skill Summary

/day-one-patch runs a fix-only mini-sprint for known issues found after the gold master: scope → rollback plan → fixes → lightweight QA gate → patch record. It runs only when the user types it (disable-model-invocation: true).

Phase 1 reads project.stage (project.yaml, fallback production/stage.txt) and requires Release or Polish; reads the most recent record in production/gate-checks/ and verifies the release gate passed rather than inferring it from the stage; and loads bugs from production/qa/bugs/*.md with Status Open or Fixed — Pending Verification, plus the latest sprint and security audit. Phase 2 classifies each bug for inclusion (S1/S2, P1, fix under 4 hours, data/config-only and cert requirements go in; architecture changes and new code paths are deferred to 1.1; S3/S4 only if a trivial config fix) and asks the user to approve the scope, with [C] No day-one patch needed as an exit.

Before any fix, release-manager drafts a rollback plan written to production/releases/rollback-plan-[version].md. Code fixes go through lead-programmer, which first returns each fix and the files it would change while writing nothing; the skill then asks once for the set — "May I apply these fixes? [BUG-ID → files]" — before any code changes, and qa-tester verifies each fix. Targeted and broader tests run with commands.test from project.yaml (unset → Tests: NOT RUN per fix, and the broader regression NOT ASSESSED). Config/data fixes are made directly, after a "May I edit" ask naming the file and the value change. qa-lead decides the QA scope (/smoke-check, or the affected systems' tests in the engine's test root); the patch QA verdict must be PASS or PASS WITH WARNINGS to proceed — FAIL defers the fix to 1.1 and NOT ASSESSED is never a pass. The patch record is written to production/releases/day-one-patch-[version].md after a "May I write" ask. No director gates are spawned.


Static Assertions (Structural)

Checked against the SKILL.md by /skill-test spec — no fixture needed.

  • Has required frontmatter fields: name, description, argument-hint, user-invocable, allowed-tools
  • Frontmatter sets disable-model-invocation: true
  • Has ≥2 phase headings
  • Contains verdict keywords: PASS, PASS WITH WARNINGS, NOT ASSESSED, FAIL
  • Contains "May I write" language for both the rollback plan and the patch record, and "May I edit" for a direct config/data fix
  • Has a next-step handoff (/patch-notes, /bug-report verify, /retrospective [milestone-name] for the launch milestone)

Director Gate Checks

None of the director-tier agents (creative-director, technical-director, producer, art-director) is spawned. The skill spawns working agents — release-manager (rollback plan), lead-programmer and qa-tester (fixes), qa-lead (patch QA scope) — and checks the existing release-gate record in production/gate-checks/; it does not run /gate-check itself.


Fixture Defaults

Every case's project.yaml sets modes.rigor: minimal and modes.automation: collaborative, with no project.local.yaml, unless its own Fixture says otherwise. Rules: studio-tests/CLAUDE.md § Fixture defaults.


Test Cases

Case 1: Happy Path — Scope, rollback plan first, fixes, patch record

Fixture:

  • project.yaml has project.stage: Release
  • The most recent file in production/gate-checks/ records a release-gate PASS
  • production/qa/bugs/ holds three Open bugs:
    • BUG-0010 — S2, P1, code fix estimated at 2 hours
    • BUG-0011 — S3, a one-value config/data fix
    • BUG-0012 — S2, fix requires an architecture change

Input: /day-one-patch

Expected behavior:

  1. Phase 1 confirms Release stage and a passing release gate
  2. Phase 2 proposes including BUG-0010 and BUG-0011 and deferring BUG-0012 ("Fix requires architecture change — defer to 1.1"); AskUserQuestion offers Approve / Adjust / No day-one patch needed
  3. After approval, release-manager drafts the rollback plan and the skill asks "May I write this rollback plan to production/releases/rollback-plan-[version].md?" — no fix work starts before it is written
  4. lead-programmer returns BUG-0010's minimal fix and the files it would change, writing nothing; the skill asks "May I apply these fixes? [BUG-0010 → files]", and only on yes does lead-programmer implement it and run targeted tests with commands.test; qa-tester verifies it. BUG-0011's config change is made directly without a programmer agent, after the skill asks "May I edit [config file] — [key]: [old value] → [new value]?"
  5. qa-lead sets the QA scope; the QA verdict is PASS
  6. Skill asks "May I write this patch record to production/releases/day-one-patch-[version].md?"
  7. Record lists BUG-0010 and BUG-0011 under Bugs Fixed and BUG-0012 under Deferred to 1.1 with its reason
  8. Next steps offer /patch-notes

Assertions:

  • BUG-0012 is deferred to 1.1 because it needs an architecture change
  • Scope is approved via AskUserQuestion before any work
  • The rollback plan is written before any fix is attempted
  • No code file changes before the one "May I apply these fixes?" ask is approved, and lead-programmer writes nothing while proposing
  • BUG-0011 is fixed without spawning lead-programmer
  • The config file is not edited before a "May I edit" ask naming the file and the value change is approved
  • "May I write" names production/releases/day-one-patch-[version].md
  • Next steps include /patch-notes

Case 2: Critical Bug That Cannot Be Fixed Safely — Accepted risk, rollback trigger

Fixture:

  • Release stage; release-gate PASS on record
  • production/qa/bugs/ holds BUG-0020 — S1 (save-file data loss) whose fix needs an architecture change — and BUG-0021 — S2, P1, 1-hour fix

Input: /day-one-patch

Expected behavior:

  1. BUG-0020 is S1 but its fix requires an architecture change, so it is proposed for deferral to 1.1; BUG-0021 is included
  2. The user approves the scope; the patch proceeds for BUG-0021
  3. After the patch record is written, the skill warns: "S1 bugs remain open and were not patched. These are accepted risks. Document them in the rollback plan trigger conditions — if they occur at scale, rollback may be preferable to a follow-up patch."

Assertions:

  • BUG-0020 appears in the deferred table with its reason (architecture change)
  • BUG-0021 is still patched — the S1 does not block the rest of the patch
  • The "S1 bugs remain open" warning is shown after the record is written
  • The warning points to the rollback plan's trigger conditions

Case 3: No Release-Gate Record — NOT ASSESSED, not assumed

Fixture:

  • project.yaml has project.stage: Release
  • production/gate-checks/ is empty (no release-gate record)
  • Open bugs exist in production/qa/bugs/

Input: /day-one-patch

Expected behavior:

  1. Phase 1 finds no release-gate record
  2. Reports Release gate: NOT ASSESSED — no gate-check record found
  3. States that the reduced QA scope depends on a gate nobody can find
  4. Asks whether to run /gate-check first or proceed with a full QA pass instead
  5. Does not proceed silently to scoping or fixes

Assertions:

  • Release gate: NOT ASSESSED — no gate-check record found is reported
  • project.stage: Release alone is not treated as proof the gate passed
  • User is offered /gate-check first or a full QA pass
  • No rollback plan, fix or patch record is produced before the user answers

Case 4: Nothing Worth Patching — User selects "No day-one patch needed"

Fixture:

  • Release stage; release-gate PASS on record
  • production/qa/bugs/ holds only two S4 cosmetic bugs that need code changes

Input: /day-one-patch

Expected behavior:

  1. Both S4 bugs are proposed for deferral (S3/S4 only if a trivial config fix)
  2. Scope question is asked; user selects [C] No day-one patch needed
  3. Skill outputs "No day-one patch required. Proceed to /launch-checklist." and stops
  4. No rollback plan, no agents, no patch record

Assertions:

  • Both S4 bugs are listed as deferred, not included
  • On [C], "No day-one patch required. Proceed to /launch-checklist." is shown
  • Skill stops without writing any file
  • No release-manager, lead-programmer or qa-lead is spawned

Case 5: Director Gate Check — Patch QA NOT ASSESSED is not a pass

Fixture:

  • project.yaml: modes.rigor: standard (so a project with no game tests gets NOT ASSESSED, not WAIVED)
  • Release stage; release-gate PASS on record; one included S2/P1 fix implemented
  • qa-lead chooses a targeted smoke check; /smoke-check returns NOT ASSESSED — no game tests found

Input: /day-one-patch

Expected behavior:

  1. The skill does not treat NOT ASSESSED as PASS or PASS WITH WARNINGS
  2. It either obtains a real result (following what the verdict says would make it runnable) or defers the fix to 1.1
  3. No director-tier agent is spawned at any point and /gate-check is not run
  4. The patch record, if written, shows the QA verdict and fills "Not assessed" with what could not be checked and why

Assertions:

  • NOT ASSESSED does not let the patch proceed as if it passed
  • The fix is either re-verified with a real result or deferred to 1.1
  • No creative-director, technical-director, producer or art-director is spawned
  • Any written record states the QA verdict and what was not assessed

Case 6: Deferred Bugs With No Sprint Plan — Scheduled into the brief's build order

Fixture:

  • project.yaml: project.stage: Release; modes.rigor: minimal (workflow minimal, no sprints)
  • The most recent file in production/gate-checks/ records a release-gate PASS
  • No production/sprints/ folder; design/game-brief.md exists with a build order
  • production/qa/bugs/ holds BUG-0030 — S2, P1, 1-hour fix — and BUG-0031 — S2, fix requires an architecture change

Input: /day-one-patch

Expected behavior:

  1. BUG-0030 is included and BUG-0031 is deferred to 1.1; the user approves the scope and the patch runs to the record
  2. The patch record lists BUG-0031 in its "Deferred to 1.1" table
  3. The skill tells the user to run /bug-triage to schedule the deferred bugs and, because the project has no sprint plan, to put them in the brief's build order rather than a 1.1 sprint

Assertions:

  • Every deferred bug is in the record's "Deferred to 1.1" table
  • The skill points to /bug-triage for scheduling the deferred bugs
  • With no sprint plan, the destination named is the brief's build order, not a 1.1 sprint
  • No sprint file is created or required

Protocol Compliance

  • Confirms Release/Polish stage and verifies the release-gate record before scoping
  • Loads bugs from production/qa/bugs/*.md
  • Gets user approval of the scope before any work
  • Writes the rollback plan before any fix
  • Asks once — "May I apply these fixes?" — before lead-programmer changes any code
  • Runs tests with commands.test, never a runner line from memory; with the key unset, says so (the broader regression is NOT ASSESSED)
  • Requires PASS or PASS WITH WARNINGS to proceed; FAIL defers the fix; NOT ASSESSED is never a pass
  • Asks "May I write" before the rollback plan and before the patch record, and "May I edit" before a direct config/data change

Coverage Notes

  • A stage other than Release/Polish ("Day-one patch prep is for Release-stage projects") is not separately tested.
  • A most-recent gate record of FAIL, CONCERNS or NOT ASSESSED (name it and stop) is not separately tested.
  • The >1 day scope warning and the cert-feedback scope argument are not separately tested.