The agent harness performance optimization system. Skills, instincts, memory, security, and research-first development for Claude Code, Codex, Opencode, Cursor and beyond.
docs: sync roadmap after ECC-Tools AI cost job (#1878)
Affaan Mustafa20f00c1410bc
diff --git a/docs/ECC-2.0-GA-ROADMAP.md b/docs/ECC-2.0-GA-ROADMAP.mdindex 4aa980b64..eeaf198ce 100644--- a/docs/ECC-2.0-GA-ROADMAP.md+++ b/docs/ECC-2.0-GA-ROADMAP.md@@ -115,6 +115,13 @@ As of 2026-05-13:harness, security, and CI failure-mode evidence, excludes obvioussecret-bearing fixture paths from fetches, returns reference coveragefindings and next actions, and charges usage only after successful execution.+- ECC-Tools PR #61 merged as `7b01b67cae0b80774b311cb515b7eca0aa038c65`+ and added the fifth executable hosted analysis job:+ `/api/analysis/jobs/ai-routing-cost-review` now gates on AI routing/cost+ readiness, evaluates model routing, token budget, usage-limit, rate-limit,+ billing/entitlement, cost-regression, and cost-policy evidence, excludes+ obvious secret-bearing paths from fetches, returns cost-control findings and+ next actions, and charges usage only after successful execution.- Handoff `ecc-supply-chain-audit-20260513-0645.md` under`~/.cluster-swarm/handoffs/`records the May 13 supply-chain sweep: no active lockfile/manifest hit for@@ -323,6 +330,11 @@ As of 2026-05-13:to analyzer corpus, RAG/evaluator, PR salvage, harness, security, and CIfailure-mode reference evidence while avoiding obvious secret-bearing fixturefetches.+- ECC-Tools PR #61 implemented the fifth job-specific hosted executor:+ `/api/analysis/jobs/ai-routing-cost-review` applies the same hosted gates to+ model-routing, token-budget, usage-limit, rate-limit, billing/entitlement,+ cost-regression, and cost-policy evidence while avoiding obvious+ secret-bearing path fetches.- ECC PR #1803 landed the contributor Quarkus handling branch after maintainercleanup, current-`main` alignment, full local validation, and preservation ofthe author's removal of incomplete ja-JP and zh-CN Quarkus translations.@@ -376,10 +388,10 @@ is not complete unless the evidence column exists and has been freshly verified.| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission || Articles, tweets, and announcements | X thread, LinkedIn copy, GitHub release copy, push checklist | Draft launch collateral exists under rc.1 release docs | Needs URL-backed refresh || AgentShield enterprise iteration | Policy gates, SARIF, packs, provenance, corpus, HTML reports, exception lifecycle audit, baseline drift Action/CLI surfaces, evidence-pack redaction, harness adapter registry, enterprise research roadmap, supply-chain hardened release path, CI-safe baseline fingerprints, corpus accuracy recommendations, remediation workflow phases, env proxy hijack corpus coverage | PRs #53, #55-#64, #67-#69, and #78-#82 landed with test evidence; native PDF export deferred in favor of self-contained HTML plus print-to-PDF until explicit enterprise demand appears; `docs/architecture/agentshield-enterprise-research-roadmap.md` now has baseline drift, evidence-pack bundle, redaction, adapter-registry, supply-chain hardening, hashed baseline fingerprints, corpus accuracy recommendation, remediation workflow, and env proxy hijack corpus slices landed | Next hosted evidence-pack workflow depth |-| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation | PRs #26-#43 plus #53-#60 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, and `/api/analysis/jobs/reference-set-evaluation` | Needs the remaining hosted worker executors for AI routing/cost and team backlog routing |+| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review | PRs #26-#43 plus #53-#61 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, and `/api/analysis/jobs/ai-routing-cost-review` | Needs the remaining hosted worker executor for team backlog routing || GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future || Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts | Local corpus complete; hosted integration remains future |-| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 13 sync adds ECC #1860, AgentShield #78-#82, JARVIS #13, ECC-Tools #53-#60, resolved queue/discussion counts, and Linear project status updates through ECC-Tools #60 | Needs recurring status updates after each merge batch |+| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 13 sync adds ECC #1860, AgentShield #78-#82, JARVIS #13, ECC-Tools #53-#61, resolved queue/discussion counts, and Linear project status updates through ECC-Tools #61 | Needs recurring status updates after each merge batch || Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active || Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked | Needs workspace capacity/config rollout || Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |@@ -400,7 +412,7 @@ repo evidence and merge commits.| Harness OS core | Audit, adapter matrix, observability docs, `ecc2/` | HUD/session-control acceptance spec | Weekly until GA || Evaluation and RAG | Reference-set validation, harness audit, traces, ECC-Tools corpus | Read-only evaluator/RAG prototype plus stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison fixtures | Hosted retrieval/check-run automation plan || AgentShield enterprise | AgentShield PR evidence and roadmap notes | Remediation workflow depth or corpus expansion follow-up | Next implementation batch |-| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy, evaluator/RAG corpus | ECC-Tools #53 published the supply-chain workflow hardening branch, #54 tracks copy-ready PR drafts in the Linear/project backlog, #55 classifies analysis-depth readiness, #56 exposes the hosted execution plan, #57 executes the first hosted CI diagnostics job, #58 executes the hosted security evidence review job, #59 executes the hosted harness compatibility audit, and #60 executes the hosted reference-set evaluation; next work is AI routing/cost and team backlog executors | Next implementation batch |+| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy, evaluator/RAG corpus | ECC-Tools #53 published the supply-chain workflow hardening branch, #54 tracks copy-ready PR drafts in the Linear/project backlog, #55 classifies analysis-depth readiness, #56 exposes the hosted execution plan, #57 executes the first hosted CI diagnostics job, #58 executes the hosted security evidence review job, #59 executes the hosted harness compatibility audit, #60 executes the hosted reference-set evaluation, and #61 executes the hosted AI routing/cost review; next work is the team backlog routing executor | Next implementation batch || Linear progress | Linear project status updates, `docs/architecture/progress-sync-contract.md`, and this mirror | Status update with queue/evidence/missing gates | Every significant merge batch |The project status update should always include:@@ -619,8 +631,8 @@ Acceptance:packs. The next slice is hosted evidence-pack workflow depth.2. Extend the ECC-Tools hosted execution lane beyond #57's CI diagnostics,#58's security evidence review, #59's harness compatibility audit, and- #60's reference-set evaluation into the remaining depth-plan jobs: AI- routing/cost review and team backlog routing.+ #60's reference-set evaluation, and #61's AI routing/cost review into the+ remaining depth-plan job: team backlog routing.3. Enable/configure the merged Linear backlog sync path after workspace issuecapacity clears or the Linear workspace is upgraded, then verify PR-draftsalvage items land in the expected project.