Free, open-source file converter. Convert 263 formats offline by drag & drop — images, PDF, Word, Excel, PowerPoint, HWP/HWPX, video, audio, e-books and archives. No upload, no Office needed.
C# audio-converteravaloniabatch-conversionconvertercsharpdocument-converterdocx-to-pdfdotnetdrag-and-dropfile-conversionfile-converterheic-converterhwphwpximage-converterlinuxmacospdf-convertervideo-converterwindows
ci: ignore not-planned requests superseded by a newer completed issue
adnan-bhaldar33255621106c
diff --git a/.github/workflows/flag-duplicate-issue.yml b/.github/workflows/flag-duplicate-issue.ymlindex 2f5dc046..83099582 100644--- a/.github/workflows/flag-duplicate-issue.yml+++ b/.github/workflows/flag-duplicate-issue.yml@@ -5,7 +5,8 @@# Earlier issue still open: "may be the same request" + the `possible duplicate` label. Earlier issue closed by a pull# request merged after the latest release: the comment also links that pull request and says it comes in the next# release (also `possible duplicate`). Earlier issue closed as "not planned" (and nothing above applies): the comment-# links it, says it was closed as not planned, and the issue gets the `not planned` label. Issues closed any other+# links it, says it was closed as not planned, and the issue gets the `not planned` label. This last case is skipped+# when a newer issue for the same request was closed as completed (the newer decision wins). Issues closed any other# way are ignored.name: Flag possible duplicate issue@@ -67,6 +68,11 @@ jobs:reason = (issue.get('stateReason') or '').upper().replace(' ', '_')return reason == 'NOT_PLANNED'+ def is_completed(issue):+ # Closed as completed (this is also the reason GitHub sets when a merged pull request closes an issue).+ reason = (issue.get('stateReason') or '').upper().replace(' ', '_')+ return reason == 'COMPLETED'+QUERY = ('query($owner:String!,$name:String!,$number:Int!){repository(owner:$owner,name:$name){''issue(number:$number){closedByPullRequestsReferences(first:10,includeClosedPrs:true){''nodes{number merged mergedAt}}}}}')@@ -105,7 +111,7 @@ jobs:['gh', 'issue', 'list', '--state', 'all', '--limit', '5000', '--json','number,title,body,state,stateReason'],check=True, capture_output=True, text=True).stdout- unreleased, duplicates, closed, not_planned = [], [], [], []+ unreleased, duplicates, closed, not_planned, completed = [], [], [], [], []for issue in json.loads(listing):if issue['number'] >= me:continue@@ -121,6 +127,8 @@ jobs:not_planned.append(issue['number'])else:closed.append(issue['number'])+ if is_completed(issue):+ completed.append(issue['number'])# Closed issues count only when a merged pull request closed them, after the latest release. The newest# ten are checked: those are the ones a pull request since the release can have closed.@@ -130,13 +138,14 @@ jobs:unreleased.append((number, pr['number']))# Priority: an unreleased fix, then a still-open request, then an earlier "not planned" decision- # (the most recent one, since it is the latest word from the maintainers).+ # (the most recent one, since it is the latest word from the maintainers). The "not planned" case is+ # skipped when a newer issue for the same request was closed as completed: the newer decision wins.if unreleased:kind = 'release'original, pull = min(unreleased)elif duplicates:kind, original, pull = 'duplicate', min(duplicates), ''- elif not_planned:+ elif not_planned and not (completed and max(completed) > max(not_planned)):kind, original, pull = 'notplanned', max(not_planned), ''else:print('No duplicate found')