SDK Data Plane Migration v1
Updated: 2026-10-24 (vector reattach, readback).
This contract moves released MemHub installations from the historical
Evidence/Governance authority to the Hy Memory SDK data plane defined by
../ARCHITECTURE.md.
It is an offline migration executed inside the App's visible startup loading phase, before Core accepts product traffic. It is not a dual-read or dual-write design and not a separate manual upgrade flow for ordinary users.
1. Why no memory is copied
Every released build (v1.0.0 through build 19) wrote memory through SDK
add() / add_extracted() first. The SDK stored the raw turn (L1 raw) and the
extracted Chat / Coding Experience / Working Fact memories in its own stores.
The Governance and Evidence tables were a mirror that MemHub read back from the
SDK afterwards.
The SDK stores are therefore already complete. The migration copies no memory and no raw turn, and does not compare the mirror with the SDK:
- the mirror's layer labels did not record which Coding store held a row, and the SDK physically deletes experiences its reconciler retires, so the mirror cannot be trusted to decide what the SDK should contain;
- the product has no user editing of memories in practice, so the mirror holds no user intent the SDK lacks;
- SDK L1 raw is kept: neither the migration nor the Runtime deletes raw.
"Already complete" holds only if the new Runtime opens the same stores. Builds
before #145 named a profile's vector collections one_memory_<12 hex>…; #145
renamed them memhub_<16 hex>… without carrying the old ones over, so later
Runtimes read an empty collection (build 20 cut over showing 37 of 3317
memories). The migration therefore reattaches those collections (§3, step 3)
and proves the new Runtime reads the memories back before it cuts over
(step 4).
2. Authority before and after cutover
Before the cutover marker is committed, legacy tables remain the product read
authority; a Runtime that was never upgraded through Desktop or memhub install/upgrade still serves them. Desktop does not start Runtime while
migration is incomplete.
After the cutover marker is committed:
- SDK stores are the only memory data authority;
- MemHub stores management state and
memory_id/ raw references only; - legacy Evidence/Governance/retrieval/session-shadow and Matter tables are dropped before the normal App window is revealed;
- startup never falls back to legacy authority.
The surviving memory_authority_state singleton, not table existence, selects
the authority.
A fresh home bootstraps the latest management schema with SDK authority directly and never creates legacy tables.
3. Who runs it, and how
One Core command does the whole migration:
one-memory sdk-migration-status --json # read-only: is there work?
one-memory sdk-migrate --runtime-build <build> --yes --json
An unfinished embedding switch or merge (embedding-switch-v1.md) never makes
a migration required and never blocks one: sdk-migration-status reports it as
an extra embedding_switch: {job_id, kind, state} field, sdk-migrate leaves
the embedding_spaces and embedding_switch_jobs tables alone, its readback
opens the registry's live space (which a switch changes only at its commit),
and the next serving Core resumes the job.
sdk-migrate requires a stopped Runtime. It takes the host capture fence
(hooks return silently instead of writing Evidence while its PID is alive),
then:
- bundle: copies
one-memory.sqlite3, the SDK data plane and non-secret configuration into a versioned bundle and verifies it by an isolated restore; an existing verified bundle of the same run is reused; - prepare: applies the management schema migrations, discards SDK staging left by builds through 19 (§5) and makes legacy queue work self-contained (§4);
- vectors: for the active embedding profile (the built-in model when no
profile is active), renames every
one_memory_<old hash>…collection to the currentmemhub_<hash>…name through Chroma's public client. A current collection that already holds writes is merged in first (newer record wins on a shared id); counts are checked after each step; - verify: opens the public SDK client exactly as the Runtime will and reads
the legacy confirmed memory ids back (
list_memories, thenget). Every confirmed chat memory that was in the vector store before this run (any collection, read before step 3) must read back. A confirmed chat the SDK had already merged or deleted before the upgrade cannot, and is only counted (chat_missing_before_migration); if none of them is in the store, none is excused. Coding/Working may be fewer, because the SDK's Coding reconciler deletes experiences it retires, but not zero when the legacy mirror has some. Otherwise the run stops withsdk_migration_memory_unreadableand the counts, before anything irreversible; legacy authority and tables stay intact; - cutover: re-verifies the bundle, repeats §4, commits SDK authority;
- cleanup: drops the legacy tables (including the
evidence_searchindex) and runsVACUUM(skipped if the disk is too full).
A home with no active model profile has no generation model, but its vectors
are the built-in embedding model's, the same space the Runtime reads with; it
migrates through that space and no key is resolved. Only when its legacy
memories have vectors solely under another embedding space (a profile since
deleted) is it not migrated (sdk_migration_vector_profile_missing, in the
preflight, before anything changes).
A home already on SDK authority still reports required while legacy-named
vector collections exist for its profile (build 20 homes). sdk-migrate then
reattaches them and reads back against the memory ids in the pre-cutover
bundle; that report is recorded but does not block, as nothing irreversible is
left. Runtime code never renames or reads Chroma directly.
With --json each step prints {"state":"running","step":…} and the last line
is the result: cutover, complete (only cleanup was left), not_required, or
failed with a stable code. Every step is safe to repeat; a retry resumes the
newest unfinished sdk-authority-v2-* run and its bundle, including a run that
build 19 left in review_required/blocked.
Callers only keep the Runtime stopped, and its service from restarting, around
that command (runSdkMigration in packages/runtime-control):
- Desktop runs it in the startup loading phase before attaching the UI; a failure keeps the App closed with the code's sentence.
- CLI
memhub install/memhub upgrade(macOS and Linux) run it with the new Runtime's Core after switchingcurrentand before starting the service. A failure before cutover rolls back to the previous version. After cutover an older Runtime refuses the home, so a later readiness failure keeps the new version and reportsruntime_not_ready_after_sdk_migration.
After cutover, History catch-up scans forward from each source checkpoint and recovers turns skipped while capture was fenced.
4. Queue work
Queue rows remain MemHub management state. Before the legacy tables disappear:
- each
memory_write_jobsrow that only names Evidence IDs gets those records frozen intopayload_json; - unstarted legacy
memory_tasksbecomememory_write_jobs(idempotency_key="legacy-task:<task_id>"); - Evidence waiting in
evidence_pending_memory_dispatch(its source cursor has already passed it) becomes one write job per conversation.
Legacy work that cannot continue does not block cutover; its counts are
reported in the sdk-migrate / cutover receipt as abandoned:
- a legacy task that may already have reached the SDK (
unknown, orrunningwith an SDK invocation) is not replayed: the SDK already holds whatever it committed; - pending legacy user deletions are not carried over.
Surviving memory_write_jobs with hy_invoked=1 keep their normal
post-cutover handling through SDK get_write_outcome(request_id).
5. Staging left by earlier builds
Builds through 19 copied the SDK root to <home>/.sdk-migration/ and swapped
directories at cutover. Before SDK authority, a leftover
hy-memory/.<namespace>.pre-migration-* directory is the original store and is
restored; after SDK authority it is stale and removed. More than one such
directory before authority is ambiguous and fails closed
(sdk_migration_swap_state_ambiguous).
6. Failure and rollback
Any failure leaves the marker absent and reports a stable code to the startup
dialog (for example sdk_migration_disk_space_insufficient,
sdk_migration_bundle_copy_failed, sdk_migration_preflight_failed,
sdk_migration_cutover_failed). The next startup retries.
After cutover but before any SDK-only write, rollback restores the bundle
together with the matching old Runtime. After an SDK-only write, automatic
binary-only rollback is forbidden; restoring the pre-cutover bundle loses the
post-cutover writes and must be explicit. An old Runtime must fail closed on a
post-cutover home. Changing only the Runtime current symlink is not data
rollback.
7. Acceptance
The release gate covers:
- a fresh install with no legacy table names;
- a legacy home reaching cutover with its SDK stores byte-for-byte unchanged;
- a home left blocked by build 19 (quarantined ledger and staging copy) completing on the next startup;
- CLI upgrade migrating before restart, rolling back on a failed migration, and keeping the new version when a migrated home is slow to come up;
- host capture fenced for the whole command;
- legacy-named vector collections reattached (with merge) before verifying, and on a home that already cut over;
- readback refusing a cutover the new Runtime cannot read, and tolerating retired Coding experiences;
/api/v2/memory-authorityagreeing with the API gates on fresh, migrated and legacy homes;- pending job freezing, legacy task and pending dispatch conversion;
- invoked/unknown legacy tasks and pending deletions not blocking cutover;
- interrupted directory swap recovery before and after authority;
- bundle creation, reuse and restore;
- physical absence of every legacy table after cutover.