Skip to content

armgit / ODS

Public Imported from GitHub
0

ODS V3 Pre-Release: Public testing and refinement ahead of the official V3 launch. Turn your PC, Mac, or Linux box into a private AI server.

5.5 KB
Raw Blame

title: Release maintainer runbook doc_type: runbook audience: [security-reviewer, maintainer] feature_status: mixed owners: [release, security] sources_of_truth: [QUALIFICATION.md, UPGRADE.md, SECURITY-ASSURANCE.md, UPSTREAM-RELEASE-CHECKLIST.md, scripts/package-release.sh, scripts/release-update.py] last_verified_at: 2026-08-27

Release maintainer runbook

This is the maintainer decision path, not authorization to sign, publish, promote, stage, activate, or change a live host. Use protected keys and private evidence only after the designated owner grants the relevant authority.

1. Freeze exact identity

  • Record the candidate head commit and tree.
  • Require a clean checkout at that exact head.
  • Confirm the candidate manifest, compatibility row, intake record when applicable, generated release files, and version source agree.
  • Confirm no unrelated release or authority change is riding with dependency intake.
  • Recheck the exact head immediately before every irreversible gate. A new commit invalidates downstream evidence unless its contract explicitly proves otherwise.

2. Generate and inspect

Run all release generators and the release-contract checks, then run them a second time to prove there is no generated drift. Build the deterministic package on the required Linux environment.

node scripts/docs/generate.mjs --check
./pixel package

Inspect the archive, checksums, SBOM, provenance, update envelope, embedded manifest, modes, and secret scan. The output remains unsigned Candidate material.

3. Complete qualification

  • Run the automated and system-service host matrices at the exact candidate identity.
  • Complete the required security passes after the last security-relevant change.
  • Complete recovery, rollback, outcome, usability, historical-secret, and licensing gates.
  • Run real configured provider/model/tool turns wherever the qualification contract requires them. Model-off, fake-adapter, direct-tool, or network-denied results stay synthetic or partial.
  • Independently review evidence provenance, hashes, timestamps, lane completeness, redaction, and failure classification.

Use ./pixel promotion-status only as a fail-closed index over those claims. It is not a promotion command.

4. Qualification-sign the exact Candidate

Use the release-qualification-sign and release-qualification-inspect commands under the protected qualification-signer procedure. The signature permits only the isolated qualification flow and grants no publication, production staging, activation, or compatibility authority.

Before any confirmation-bearing command, run its --help, resolve every absolute private path, verify ownership/modes, and compare the preview hash or receipt identity with the reviewed candidate. Never paste a private key, token, prompt, or host identity into retained repository evidence.

5. Prove the signed lifecycle

In the authorized disposable or canary lane, complete this sequence against one exact signed candidate:

  1. Inspect and prepare the signed candidate without execution.
  2. Rehearse extraction and validation without execution.
  3. Activate through the trusted controller and retain the exact activation result.
  4. Complete a real configured model turn whose requested tool result returns through the gateway to the model.
  5. Preview and execute the update-bound rollback; verify the exact prior Supported runtime.
  6. Re-prepare/rehearse as required, reactivate the same candidate, and repeat verification plus the real tool turn.
  7. Exercise interruption recovery and cleanup contracts required for the lane.

Use operator update and rollback and UPGRADE.md for exact commands. A successful activation without verified rollback and reactivation is incomplete lifecycle evidence.

6. Release-sign and independently verify

After every required gate is green for the unchanged exact head, sign the release envelope with the protected release identity. A different maintainer or isolated verification step must inspect the signature namespace, trust anchor, archive, SBOM, provenance, manifest, checksums, qualification identity, and exact evidence set.

Do not reinterpret a qualification signature as a publisher signature. Do not retry a signature failure with a different key until the source, envelope, permissions, and trust inputs are understood.

7. Promote, publish, or deploy only under separate authority

Compatibility promotion mutates repository release truth. Publication changes external distribution state. Staging and activation change a host. They are separate approvals and may be performed by different people or systems.

Immediately before an authorized action, recheck exact head/tree, clean state, signatures, evidence hashes, current Supported/Candidate rows, policy, and rollback availability. Immediately afterward, verify generated contracts, published hashes as applicable, installed status as applicable, and preservation of the prior rollback artifact.

Handoff record

Record: exact head/tree; artifact and envelope hashes; qualification and release signature identities; gate outcomes; real-backend/tool evidence classification; activation, rollback, and reactivation receipts; compatibility result; publication result; installed-host result; unresolved exceptions; and who retains final integration authority. Keep the record content-free and distinguish not-run, blocked, partial, synthetic, passed, published, and owner-accepted.

See failure guide before responding to any failed gate.