Halcyon Motors — Operations & Supply Chain

Owner: Chris Donovan (Head of Operations)

The ramp

The defining operational goal this year is lifting C1 production from ~2,600 to 4,000 units/month to clear a ~31,000-unit backlog — without shipping quality or safety debt. The ramp is gated primarily on battery cell supply and on quality holds.

Battery cell supply

  • The C1 uses LFP cells. Today they are single-sourced from CATL.
  • Single-sourcing is both a supply risk (one disruption stalls the line) and a policy risk (tariffs and IRA sourcing rules can penalize Chinese-supplied cells).
  • Active initiative: qualify a second LFP source — evaluating Panasonic and LG Energy Solution. This is the top supply-chain risk to retire before the ramp.

Supplier and logistics watch

Operations continuously monitors the inputs that can stall the line:

  • Battery suppliers — CATL, Panasonic, LG Energy Solution: capacity, pricing, plant disruptions, and any quality recalls on shared cell lines.
  • Lithium and raw-material prices — they flow directly into cell cost and our per-vehicle margin.
  • Tariff and trade actions on imported cells and components.
  • Logistics disruptions — shipping, port, and inbound-parts risk.

Quality and recalls

Quality signals and any recall-adjacent issue (ours or on a shared supplier component) are treated as high-severity. A relevant NHTSA action on a shared part, or a supplier quality escape, escalates immediately — operationally to Operations and, when safety-related, to the principal same-day.

Signals Operations watches

  • Battery-supplier capacity, pricing, and disruption news.
  • Lithium / raw-material price moves.
  • Tariff actions affecting imported cells or components.
  • NHTSA recalls touching shared suppliers or components.