Skip to content

Self-hosted, Self-Improving, Federated Everything App — dev management, agent orchestration, persistent mind, digital twin, second brain, and creative pipeline from a single dashboard over Tailscale to port the user into the OS

fix: converge every claim-issue Phase-3 release with a label the drain skips (#4106)

[._.]/ Adam Eivye7139644adfc
diff --git a/.changelog/next/fixed-issue-4106.md b/.changelog/next/fixed-issue-4106.md
new file mode 100644
index 0000000000..c3949ca97c
--- /dev/null
+++ b/.changelog/next/fixed-issue-4106.md
@@ -0,0 +1 @@
+- CoS claim-issue agents now converge every "verify still valid" release — an already-fixed or superseded issue is closed with a summarizing comment and a stale-reference issue is tagged needs-input, so the perpetual drain stops re-spawning a no-op agent on it every tick (GitHub, GitLab, and JIRA claim prompts)
diff --git a/server/services/taskPromptDefaults.test.js b/server/services/taskPromptDefaults.test.js
index bf8e762292..9d77d4b5a2 100644
--- a/server/services/taskPromptDefaults.test.js
+++ b/server/services/taskPromptDefaults.test.js
@@ -219,9 +219,9 @@ describe('taskPromptDefaults integrity snapshot', () => {
// claim/plan prompt that enumerates the CLI reviewers must name the binary.
it.each([
['plan-task', 13],
- ['claim-issue', 10],
- ['claim-issue-gitlab', 9],
- ['claim-issue-jira', 7],
+ ['claim-issue', 11],
+ ['claim-issue-gitlab', 10],
+ ['claim-issue-jira', 8],
])('%s v%d names the antigravity reviewer\'s `agy` binary, preserving the pre-`agy` default', (key, version) => {
const current = DEFAULT_TASK_PROMPTS[key];
expect(PROMPT_VERSIONS[key]).toBe(version);
@@ -270,9 +270,87 @@ describe('taskPromptDefaults integrity snapshot', () => {
// The append is now the documented-convention FALLBACK, never the instruction.
expect(current).not.toMatch(/append (?:a one-line entry )?to `\.changelog\/NEXT\.md`/);
+ // Located by CONTENT rather than a fixed array position: later revisions
+ // (the claim flows' converging Phase 3, below) append their own outgoing
+ // bodies after it. `findLast`, NOT `find` — several older revisions also
+ // predate the fragment convention, and matching the OLDEST of them would
+ // keep passing if the actual pre-fragment body were dropped or edited.
+ const preFragment = PREVIOUS_DEFAULT_PROMPTS[key].findLast(
+ (p) => !p.includes('per-branch fragment') && p.includes('.changelog/NEXT.md'),
+ );
+ expect(preFragment).toBeDefined();
+ expect(preFragment).not.toBe(current);
+ });
+
+ // Phase 3 ("Verify still valid") releases an issue for reasons the work
+ // detector cannot see — `isActionableIssue` (perpetualWork.js) reads only
+ // labels/assignees/epic/in-flight, never the body or comments. So a Phase-3
+ // exit that leaves the issue OPEN and unlabeled reads as actionable forever
+ // and the perpetual drain re-spawns a no-op agent on it every tick. Every
+ // release path must therefore land a converging outcome: closed, or
+ // `needs-input` (both skipped by Phase 1 step 4). Issue #4106.
+ // Assertions are scoped to the Phase 3 SECTION, not the whole body: `gh issue
+ // close` / `glab issue close` already appear in Phase 7's post-merge
+ // reconcile, so a whole-body `toContain` would pass even with Phase 3 left
+ // exactly as broken as it was.
+ const phaseSection = (body, n) => {
+ const start = body.indexOf(`## Phase ${n} —`);
+ const end = body.indexOf(`## Phase ${n + 1} —`, start);
+ expect(start, `Phase ${n} heading`).toBeGreaterThan(-1);
+ expect(end, `Phase ${n + 1} heading`).toBeGreaterThan(start);
+ return body.slice(start, end);
+ };
+
+ it.each([
+ ['claim-issue', 'gh issue close', 'gh issue edit "${NUM}" --add-label needs-input'],
+ ['claim-issue-gitlab', 'glab issue close', 'glab issue update "${NUM}" --label needs-input'],
+ ])('%s converges every Phase-3 release, preserving the outgoing default', (key, closeCommand, parkCommand) => {
+ const current = DEFAULT_TASK_PROMPTS[key];
+ const phase3 = phaseSection(current, 3);
+ // The already-fixed/superseded branch CLOSES rather than releasing open…
+ expect(phase3).toContain('**Already fixed, superseded, or closed-then-reopened-for-tracking**');
+ expect(phase3).toContain(closeCommand);
+ // …and the stale-reference branch tags the label the detector skips.
+ expect(phase3).toContain('**Stale reference**');
+ expect(phase3).toContain(parkCommand);
+ expect(phase3).toContain('CONVERGING outcome');
+ // Closing is destructive, so the close branch is gated on nameable
+ // evidence — an agent that merely suspects the work landed must implement.
+ expect(phase3).toContain('**Evidence gate:');
+ // The old blanket "release the claim and re-pick" instruction is what left
+ // the issue open and unlabeled — it must be gone, not merely qualified.
+ expect(phase3).not.toContain('If ANY of these are true, release the claim and re-pick');
+
+ // The outgoing default is preserved verbatim so installs holding it are
+ // recognized and auto-upgraded rather than read as user customizations.
const outgoing = PREVIOUS_DEFAULT_PROMPTS[key][PREVIOUS_DEFAULT_PROMPTS[key].length - 1];
- expect(outgoing).not.toContain('per-branch fragment');
- expect(outgoing).toContain('.changelog/NEXT.md');
+ const outgoingPhase3 = phaseSection(outgoing, 3);
+ expect(outgoingPhase3).toContain('If ANY of these are true, release the claim and re-pick');
+ expect(outgoingPhase3).not.toContain(closeCommand);
+ expect(outgoing).not.toBe(current);
+ });
+
+ // JIRA has no labels, so its converging vocabulary is status: an already-fixed
+ // ticket goes to Done/Closed, and a stale-reference ticket parks on a held
+ // status behind a Review Hub todo. Transitioning back to a not-started status
+ // is the JIRA shape of the same bug — Phase 1's not-started-only filter
+ // re-picks it immediately.
+ it('claim-issue-jira converges every Phase-3 release, preserving the outgoing default', () => {
+ const current = DEFAULT_TASK_PROMPTS['claim-issue-jira'];
+ const phase3 = phaseSection(current, 3);
+ expect(phase3).toContain('CONVERGING status');
+ expect(phase3).toContain('**Already fixed, superseded, or duplicated by another ticket**');
+ expect(phase3).toContain('Done/Closed');
+ expect(phase3).toContain('**Evidence gate:');
+ expect(phase3).toContain('**Stale reference**');
+ // The stale-reference park uses JIRA's held status + a Review Hub todo —
+ // never a not-started status, which Phase 1 re-picks on the very next pass.
+ expect(phase3).toContain('NOT back to a not-started status');
+ expect(phase3).not.toContain('If ANY of these are true, release the claim and re-pick');
+
+ const previous = PREVIOUS_DEFAULT_PROMPTS['claim-issue-jira'];
+ const outgoing = previous[previous.length - 1];
+ expect(phaseSection(outgoing, 3)).toContain('transition the ticket back to its not-started status');
expect(outgoing).not.toBe(current);
});
diff --git a/server/services/taskPromptDefaults/integrity.snapshot.json b/server/services/taskPromptDefaults/integrity.snapshot.json
index 16be04bb71..87c957b487 100644
--- a/server/services/taskPromptDefaults/integrity.snapshot.json
+++ b/server/services/taskPromptDefaults/integrity.snapshot.json
@@ -13,9 +13,9 @@
"ux": "e03d03fc7c16faa5b5db93be2896b9ad",
"feature-ideas": "d3282f16da29efe2d53595b3b34778bc",
"plan-task": "bbc5495a02102fd470d2a429eedfbe76",
- "claim-issue": "9b90d29048e85c9db640b1db643a08c8",
- "claim-issue-gitlab": "12d78a91126213f7c10e9a6725cdb464",
- "claim-issue-jira": "367c22d2587212c9c391f50d146948e8",
+ "claim-issue": "d5465bd5d6fa1cd979746b99a881dba9",
+ "claim-issue-gitlab": "8e8f795bb75e996b80992883983a3c08",
+ "claim-issue-jira": "927766326e492e4c9c2566534f465512",
"code-reviewer-review": "1cd13ee5142d130f95cc390098d0f278",
"code-reviewer-implement": "ab2c3e16d54e195bdf856574b7702042",
"error-handling": "9afba2e99b90a8d5771c75e7f0615d96",
@@ -37,9 +37,9 @@
"PROMPT_VERSIONS": {
"feature-ideas": 10,
"plan-task": 13,
- "claim-issue": 10,
- "claim-issue-gitlab": 9,
- "claim-issue-jira": 7,
+ "claim-issue": 11,
+ "claim-issue-gitlab": 10,
+ "claim-issue-jira": 8,
"pr-reviewer": 3,
"code-reviewer-a": 1,
"code-reviewer-b": 1,
@@ -99,7 +99,8 @@
"18de42dd948a14866df8acbc9668e368",
"3f5cc58943bc08cbbc00f836660ecdfc",
"97a3994ce4da2d2743bdffec110a7482",
- "e3d1a2e884a2a49c306a586089f4f376"
+ "e3d1a2e884a2a49c306a586089f4f376",
+ "367c22d2587212c9c391f50d146948e8"
],
"claim-issue-gitlab": [
"271ad9c6efa9dce424103711292fd055",
@@ -109,7 +110,8 @@
"e01f8d7e6dd078ae94516e903ce864d1",
"c9888390df157b72741aafb9f2f9d8e4",
"d7b44882f4d47ae44d39989e29e5fe2b",
- "4f323dddadb5c7f0047e35914ba80529"
+ "4f323dddadb5c7f0047e35914ba80529",
+ "12d78a91126213f7c10e9a6725cdb464"
],
"claim-issue": [
"89308f712f99ad8134224639cd99f135",
@@ -120,7 +122,8 @@
"bd7b5f6a1912d990c2c0f88eb186f40f",
"e9039e0ee911636db2927fe239280f35",
"dc985be3422c9fdee07d92a059666f0a",
- "ed113d11f477bf1b50cd5a48364b9da9"
+ "ed113d11f477bf1b50cd5a48364b9da9",
+ "9b90d29048e85c9db640b1db643a08c8"
],
"security": [
"d0f54c1fbe62d067b1a23ee0a9f3528c"
diff --git a/server/services/taskPromptDefaults/previousDefaults.js b/server/services/taskPromptDefaults/previousDefaults.js
index d9e60b8069..01349a3917 100644
--- a/server/services/taskPromptDefaults/previousDefaults.js
+++ b/server/services/taskPromptDefaults/previousDefaults.js
@@ -3055,6 +3055,118 @@ The configured reviewers for this task, in order, are \`{reviewers}\`. \`claude\
## Phase 7 — Report
+Generate a short summary: the ticket KEY + summary worked, the MR/PR URL, the ticket's FINAL JIRA status (confirm it is "In Review"), reviewers run, and any status transition that failed and why.`,
+
+ // v7 default prompt — pre-converging-Phase-3-release (issue #4106)
+ `[Claim Issue: {appName}] Claim and ship the next ready JIRA ticket
+
+Pick the next ready JIRA ticket assigned to me in the current sprint, move it to **In Progress**, **create your own worktree at \`claim/<KEY>\`**, implement it, open a merge/pull request that references the ticket, move the ticket to **In Review**, and clean up. This is the \`/claim --issues\` flow for JIRA: same self-managed worktree and no-local-merge cleanup, but the work source is the app's **JIRA** project (via the PortOS JIRA API) and the ticket *status* — not an assignee/label — is the claim. **YOU pick the ticket in Phase 1.** Do NOT modify files in the source repo directly; ALL editing happens inside the worktree you create.
+
+All PortOS API calls below are relative to this base URL: ${PORTOS_API_URL}
+
+**How claiming works.** A ticket is "in flight" when (a) a \`claim/<KEY>\` or \`cos/<task>/<KEY>/<agent>\` ref exists across local branches, remote branches, or open MR/PR source refs, OR (b) its JIRA status is anything other than a not-started status (so "In Progress", "In Review", "Done", etc. are already taken). Moving the ticket to **In Progress** + the \`claim/<KEY>\` branch ARE the claim, visible to every other agent and to the human looking at the sprint board.
+
+## Phase 1 — Pick the target ticket
+
+Run steps 1–5 in order.
+
+1. Resolve the app's JIRA config: GET ${PORTOS_API_URL}/api/apps and find the app whose \`id\` is \`{appId}\`. Read \`jira.enabled\`, \`jira.instanceId\`, and \`jira.projectKey\`. If \`jira.enabled\` is not true or either id is missing, exit cleanly — this task only works against JIRA-configured apps.
+2. Fetch my current-sprint tickets: GET ${PORTOS_API_URL}/api/jira/instances/<instanceId>/my-sprint-tickets/<projectKey>. This returns the tickets assigned to me in the active sprint.
+3. Build the in-flight set from git refs:
+ \`\`\`bash
+ cd {repoPath}
+ git fetch --prune 2>/dev/null
+ git branch -a --no-color --format='%(refname:short)'
+ \`\`\`
+ For each ref (after stripping any leading \`origin/\` / \`upstream/\` prefix), extract the ticket KEY **only when the ref matches** \`claim/<KEY>\` (the segment after \`claim/\`) or \`cos/<task>/<KEY>/<agent>\` (the \`<KEY>\` third segment). A KEY looks like \`PROJ-1234\`.
+4. **Pick the target ticket:** walk the sprint tickets and pick the FIRST where ALL of the following are true (prefer higher priority — Blocker/Highest/High — then oldest):
+ - Its status is a not-started status (e.g. "To Do", "Open", "Backlog", "Selected for Development", "Ready"). Skip tickets already "In Progress", "In Review", "Done", or any closed/resolved status — those are claimed or finished.
+ - Its KEY is NOT in the in-flight set from step 3.
+ - It has enough of a summary/description to act on. A ticket that merely leaves a design choice unstated is still eligible — you'll decide the reading in Phase 3, not skip it here. Skip only a ticket with essentially no actionable content (bare title, no description or acceptance criteria).
+ - It is NOT an Epic (issue type "Epic", or a title ending in "(epic)"). Leave epics for a human to split.
+5. **If no eligible ticket exists**, exit cleanly — an empty actionable queue is a healthy state, not a failure. If a ticket is in the sprint but too vague or blocked to start, create a Review Hub todo (POST ${PORTOS_API_URL}/api/review/todo with title "[<KEY>] Needs clarification" or "[<KEY>] Blocked" and a description of what's missing) instead of claiming it.
+
+Capture the ticket KEY as \`KEY\`, its summary, and its full description — you'll reuse them in the branch, the MR/PR, and the commit trailer.
+
+## Phase 2 — Claim (In Progress + worktree)
+
+First move the ticket to **In Progress** (this is the claim, and it must happen BEFORE you start coding), then create the worktree. Transition names vary per project workflow, so resolve the id dynamically:
+
+1. GET ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/transitions to list available transitions.
+2. Pick the transition whose target status best matches "In Progress" (e.g. "In Progress", "Start Progress", "Start Work"); match case-insensitively. If none clearly matches, pick the transition that moves the ticket out of the To Do / Backlog column.
+3. POST ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/transition with body {"transitionId": "<id>"}. If this fails (the status is unreachable), the ticket may have been claimed concurrently — return to Phase 1 and pick the next eligible ticket.
+
+Then create the worktree on a branch named \`claim/<KEY>\`. Do all editing inside the worktree, NEVER in the source repo's working tree:
+
+\`\`\`bash
+KEY=<picked-key>
+DEFAULT_BRANCH="$(git -C {repoPath} symbolic-ref --short refs/remotes/origin/HEAD 2>/dev/null | sed 's@^origin/@@')"
+DEFAULT_BRANCH="\${DEFAULT_BRANCH:-main}"
+WORKTREE="{worktreesRoot}/claim-\${KEY}"
+mkdir -p "{worktreesRoot}"
+git -C {repoPath} fetch origin "\${DEFAULT_BRANCH}"
+git -C {repoPath} worktree add -b "claim/\${KEY}" "\${WORKTREE}" "origin/\${DEFAULT_BRANCH}"
+cd "\${WORKTREE}"
+\`\`\`
+
+**If \`git worktree add\` fails because the \`claim/<KEY>\` branch already exists** (a concurrent run won the race), do NOT force or reuse it — that branch IS another run's claim. Move the ticket back to its prior status if you transitioned it, treat the ticket as in-flight, return to Phase 1, and pick the next eligible ticket. Stash \`WORKTREE\` — you'll need it for Phase 6 cleanup.
+
+## Phase 3 — Verify still valid
+
+Re-read the ticket (GET ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>) before writing any code. **If ANY of these are true, release the claim and re-pick** (transition the ticket back to its not-started status, remove the worktree, return to Phase 1):
+
+- The ticket references a function, file, or component that no longer exists (\`grep -rn\` the named identifiers — if they're gone, it's stale).
+(A too-large scope is NOT in this release-and-re-pick list — releasing it just lets the next pass re-pick the same oversized ticket. It has its own park path below.)
+
+**A genuinely too-large ticket needs parking so the queue converges.** If the work is bigger than one coherent claim — it would touch files far outside the ticket's scope (>5 unrelated files) — and you can't carve a valuable standalone slice to ship first, splitting the omnibus is a human call: create a Review Hub todo (POST ${PORTOS_API_URL}/api/review/todo with title "[<KEY>] Needs clarification" and the split you'd suggest), transition the ticket to a **Blocked/On Hold status if the workflow has one — NOT back to a not-started status**, which would re-queue it under Phase 1 (ticket selection never consults Review Hub todos, so a not-started ticket is immediately re-eligible and the run would re-park it every pass); if the workflow has no held status, leave it **In Progress**. Phase 1's not-started-only filter keeps a non-not-started ticket out of the ready queue, and the Review Hub todo is the durable human signal — together they let the claim run converge. Then remove the worktree and exit.
+
+**Ambiguity is NOT a release trigger — decide, don't defer.** If the ticket is merely open to more than one reasonable reading, or leaves a design choice unstated, do NOT bail to a "Needs clarification" todo. Pick the most reasonable interpretation, record the approach you chose in a ticket comment (POST ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/comments) so the decision is on the record, and implement it. The user would rather iterate on top of a shipped best-guess than have the ticket parked waiting on a decision they didn't ask to make. Reserve the "Needs clarification" todo for cases where proceeding would be **destructive or irreversible**, or genuinely requires the human: specific hardware/credentials you don't have, or a judgment only they can make. In those cases only, create the todo (POST ${PORTOS_API_URL}/api/review/todo with title "[<KEY>] Needs clarification" and what a human must resolve), transition the ticket to a **Blocked/On Hold status if the workflow has one — NOT back to a not-started status** (which would re-queue it under Phase 1, since ticket selection never consults Review Hub todos); if the workflow has no held status, leave it **In Progress** so Phase 1's not-started-only filter excludes it. Then remove the worktree and **exit — do NOT proceed to Phase 4**.
+
+Do NOT leave an *unexplained* ticket in "In Progress" with no branch — that is the zombie to avoid. A deliberate park above is different: it always carries a Review Hub todo saying why (and a Blocked/On Hold status where the workflow supports one), so it reads as intentionally held, not abandoned.
+
+## Phase 4 — Implement
+
+Write the code, tests, and any docs the ticket requires. Follow the repo conventions in CLAUDE.md (no try/catch in route handlers, functional programming, Zod validation, Tailwind tokens, reactive UI updates). Run the relevant test suite as you go.
+
+**Roll discovered backbone work INTO this MR/PR** — small supporting helpers, refactors, and tests the fix depends on belong here, not a follow-up. Only defer genuinely-large adjacent work.
+
+Commit with a conventional message referencing the ticket so the trail is grep-able:
+
+\`\`\`
+<type>: <one-line description> (<KEY>)
+\`\`\`
+
+## Phase 5 — Open the MR/PR and move to In Review
+
+The audit trail is the merged MR/PR + \`git log\`. Detect the forge from the git origin and use the matching CLI (\`gh\` for GitHub, \`glab\` for GitLab).
+
+1. If the repo maintains a changelog, record a one-line entry **following the convention that repo documents** — read its \`CLAUDE.md\` and changelog README (e.g. \`.changelog/README.md\`) first. Some repos collect per-branch fragments in a directory (e.g. \`.changelog/next/\`) via a helper script rather than appending to one shared file, precisely so parallel agents don't conflict on every merge; use that flow when it's documented. Fall back to appending to the unreleased section (\`.changelog/NEXT.md\`, or \`## Unreleased\` in \`CHANGELOG.md\`) in the repo's existing prose style only when no convention is documented. Otherwise skip it.
+2. Push the branch: \`git push -u origin "claim/\${KEY}"\`
+3. Open the MR/PR. Reference the JIRA \`KEY\` in the title and description (there is NO \`Closes\` auto-close for JIRA). Summarize what shipped + a short test plan.
+ - GitHub: \`gh pr create --fill --head "claim/\${KEY}"\` (then edit the body to mention \`KEY\` if \`--fill\` didn't).
+ - GitLab: \`glab mr create --fill --source-branch "claim/\${KEY}" --target-branch "\${DEFAULT_BRANCH}" --yes\`.
+ Capture the MR/PR URL as \`PR_URL\`.
+4. **Move the ticket to "In Review" — REQUIRED, not optional. Do not finish while it is still "In Progress":**
+ - GET ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/transitions again (transitions change once In Progress).
+ - Pick the transition whose target status best matches "In Review" (e.g. "In Review", "Code Review", "Review", "Ready for Review"); match case-insensitively.
+ - POST ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/transition with body {"transitionId": "<id>"}.
+5. Add the MR/PR link to the ticket: POST ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/comments with body {"comment": "Implementation complete. MR/PR: \${PR_URL}\\n\\nReady for code review."}. **If you shipped only PART of the ticket's scope** (a valuable slice with real work remaining), make the comment a \`Done ✓ / Remaining ▢\` summary so the remaining scope is not lost when a human lands the MR/PR; when that remainder is a clean, separable chunk, ALSO file a new follow-up ticket for it (POST ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets with a summary + a description referencing \`KEY\`) so it re-enters the sprint queue. If a transition in step 4 failed (status unreachable), say so in this comment AND in the Phase 6 summary — do not silently drop it.
+
+## Phase 6 — Review and clean up
+
+The configured reviewers for this task, in order, are \`{reviewers}\`. \`claude\` / \`codex\` / \`antigravity\` (CLI binary: \`agy\`) / \`grok\` invoke a local-CLI critique. (\`copilot\` is GitHub-only — skip it on GitLab.) When more than one is configured, run each in the listed order.
+
+1. **Self-review your diff for reuse, quality, and efficiency** (DRY, dead code, naming, simpler equivalents, missed edge cases) and fix findings in the same diff. Claude Code runs this as the three-agent \`/simplify\` pass; on other CLIs, do the equivalent by hand.
+2. **Run each configured CLI reviewer** headless against the MR/PR diff, apply fixes, run tests, re-push — capped at 3 rounds — then advance to the next reviewer. A configured CLI reviewer whose binary is not on PATH is UNSATISFIED, not clean — that is a broken setup, not a passing review. Do NOT substitute your own self-review; comment on the MR/PR naming the missing command and stop.
+3. **Leave the MR/PR open for a human to land.** Unlike the GitHub/GitLab issue flows, this flow does NOT auto-merge — the ticket is "In Review" and a human reviews + merges. After the reviewers finish, run the worktree-only cleanup so the source checkout is left clean:
+ \`\`\`bash
+ cd {repoPath}
+ git worktree remove "\${WORKTREE}"
+ \`\`\`
+ Leave the local \`claim/<KEY>\` branch and the open MR/PR in place. **Do NOT \`git merge\`, \`gh pr merge\`, \`glab mr merge\`, or \`git pull\`** — landing the change and moving the ticket to Done is the human's call.
+
+## Phase 7 — Report
+
Generate a short summary: the ticket KEY + summary worked, the MR/PR URL, the ticket's FINAL JIRA status (confirm it is "In Review"), reviewers run, and any status transition that failed and why.`,
],
@@ -4035,6 +4147,132 @@ If \`git branch -d\` refuses, use \`-D\` — the MR is confirmed merged, so the
- **No — the remainder is a clean, separable chunk** — close THIS issue with a summarizing note (shipped ✓ / moved to #NEW), remove \`in-progress\`, and file ONE tightly-scoped follow-up for the remainder: \`glab issue create --title "…" --label plan --description "…\\n\\nRefs #\${NUM}"\` (carry over any \`area:*\` labels the issue had).
- **No — the remainder is a continuation of the same scope** — keep the issue OPEN, post a \`Done ✓ / Remaining ▢\` note, and release the claim so the queue re-picks it: \`glab issue update "\${NUM}" --unassign --unlabel in-progress\`.
+NEVER leave the issue OPEN with \`in-progress\` still on it — that strands it as a zombie (the claim queue skips \`in-progress\`, so the remaining scope is never re-picked). **Do NOT \`git pull\`** from inside this phase — the work is already integrated on GitLab via \`glab mr merge\`; leave the user's working tree alone.`,
+
+ // v9 default prompt — pre-converging-Phase-3-release (issue #4106)
+ `[Claim Issue: {appName}] Claim and ship the next open GitLab issue
+
+Pick the next available unclaimed open GitLab issue, **create your own worktree at \`claim/issue-<num>\`**, implement the fix, ship a merge request (MR) that closes the issue, and clean up. This is the \`/claim --issues\` flow for GitLab — same in-flight scan, same branch naming, same no-local-merge cleanup, but the work source is the repo's **GitLab** issue tracker and the forge CLI is \`glab\` (not \`gh\`). **YOU pick the issue in Phase 1 — the scheduler does not reserve one for you.** Picking at execution time and immediately claiming (worktree + assignee + label) **narrows** the window for two concurrent runs to collide on the same issue — it does NOT eliminate it. Do NOT modify files in the source repo directly; ALL editing happens inside the worktree you create.
+
+{issueAuthorFilter}
+
+**How claiming works.** An issue is "in flight" when its number appears as the issue-position segment in either a \`claim/issue-<num>\` ref (the human/TUI pattern) or a \`cos/<task>/issue-<num>/<agent>\` ref (the CoS sub-agent pattern) across local branches, remote branches, or open MR source-branch refs — OR the issue is already assigned to someone OR carries an \`in-progress\` label. The \`claim/issue-<num>\` branch + the assignee/\`in-progress\` markers you set ARE the claim, visible to every other agent (including parallel machines).
+
+## Phase 1 — Pick the target issue
+
+Run steps 1–5 in order.
+
+1. cd into the repo root ({repoPath}) and confirm GitLab is the forge and \`glab\` is authenticated: \`glab auth status\` and \`glab repo view\`. If \`glab\` is not authenticated or the remote is not GitLab, exit cleanly — this task only works against GitLab issue trackers.
+2. List candidate open issues, honoring the author filter described above. Fetch a JSON page and order **oldest-first** (GitLab returns newest-first by default; sort client-side by \`created_at\` since the page is bounded):
+ \`\`\`bash
+ git fetch --prune 2>/dev/null
+ # Owner-only mode (default): add --author <owner> (resolve <owner> from the project namespace).
+ glab issue list --per-page 100 -F json
+ # Any-author mode: run the SAME command WITHOUT --author.
+ \`\`\`
+3. Build the in-flight set. Collect every branch/MR source ref:
+ \`\`\`bash
+ git branch -a --no-color --format='%(refname:short)'
+ glab mr list --per-page 100 -F json # read each MR's source_branch
+ \`\`\`
+ For each ref (after stripping any leading \`origin/\` prefix), extract the issue number **only when the ref matches** \`claim/issue-<num>\` (number after \`claim/issue-\`) or \`cos/<task>/issue-<num>/<agent>\` (the \`issue-<num>\` third segment). Do NOT flag an issue just because its bare number appears elsewhere in a ref.
+4. **Pick the target issue:** walk the candidate list oldest-first and pick the FIRST issue where ALL of the following are true:
+ - Its number (\`iid\`) is NOT in the in-flight set.
+ - It has NO assignees (an assignee means another machine/human already claimed it).
+ - It does NOT carry any of these blocking labels: \`in-progress\`, \`blocked\`, \`needs-input\`, \`future\`, \`wontfix\`, \`question\`, \`discussion\`.
+ - It is NOT a tracking/umbrella **epic** — recognized by an \`epic\` label, a title ending in "(epic)", OR a title beginning with an \`[epic]\` bracket or \`Epic:\` tag (e.g. "[Epic] …" / "Epic: …", case-insensitive). Leave epics for a human to split. **The bare \`plan\` label is NOT a skip signal** — it marks the claimable queue, not a blocker.
+5. **If no eligible issue exists**, exit cleanly — an empty actionable queue is a healthy state, not a failure.
+
+Capture the issue number (GitLab \`iid\`) as \`NUM\`, its title, and its full description — you'll reuse them in the MR and the \`Closes #<num>\` line.
+
+## Phase 2 — Claim (worktree + markers)
+
+Detect the default branch first (forge-agnostic), then create the worktree on \`claim/issue-<num>\` and set the cross-machine claim markers. Do all editing inside the worktree, NEVER in the source repo's working tree.
+
+\`\`\`bash
+NUM=<picked-number>
+DEFAULT_BRANCH="$(git symbolic-ref --short refs/remotes/origin/HEAD 2>/dev/null | sed 's@^origin/@@')"
+DEFAULT_BRANCH="\${DEFAULT_BRANCH:-main}"
+WORKTREE="{worktreesRoot}/claim-issue-\${NUM}"
+mkdir -p {worktreesRoot}
+git fetch origin "\${DEFAULT_BRANCH}"
+git worktree add -b "claim/issue-\${NUM}" "\${WORKTREE}" "origin/\${DEFAULT_BRANCH}"
+# Cross-machine claim markers (best-effort — do not abort the run if these fail).
+# Resolve your own username first — glab's --assignee wants a username (the
+# \`@me\` gh-ism isn't universally supported), falling back to @me if the lookup fails:
+ME="$(glab api user 2>/dev/null | sed -n 's/.*"username":"\\([^"]*\\)".*/\\1/p')"
+glab issue update "\${NUM}" --assignee "\${ME:-@me}" 2>/dev/null
+glab issue update "\${NUM}" --label in-progress 2>/dev/null
+cd "\${WORKTREE}"
+\`\`\`
+
+**If \`git worktree add\` fails because the \`claim/issue-<num>\` branch already exists** (a concurrent run won the race), do NOT force or reuse it — that branch IS another run's claim. Treat the issue as in-flight, return to Phase 1, and pick the next eligible issue; if nothing else is eligible, exit cleanly. Stash \`WORKTREE\` — you'll need it for Phase 7 cleanup.
+
+## Phase 3 — Verify still valid
+
+Read the full issue (\`glab issue view "\${NUM}"\`) before writing any code. **If ANY of these are true, release the claim and re-pick** (remove the assignee with \`glab issue update "\${NUM}" --unassign\` + the \`in-progress\` label with \`--unlabel in-progress\`, remove the worktree, return to Phase 1):
+
+- A note indicates the issue was already fixed, superseded, or closed-then-reopened-for-tracking.
+- The request references a function, file, or component that no longer exists (\`grep -rn\` the named identifiers — if they're gone, the issue is stale).
+
+(A too-large scope is NOT in this release-and-re-pick list — releasing it just lets the next pass re-pick the same oversized issue. It has its own park path below.)
+
+**A genuinely too-large issue needs parking so the drain converges.** If the work is bigger than one coherent claim — it would touch files far outside the issue's scope (>5 unrelated files) — and you can't carve a valuable standalone slice to partial-ship via Phase 5's \`Refs\` path, post a brief note naming the split you'd suggest, **tag it \`needs-input\`** (\`glab issue update "\${NUM}" --label needs-input\`), release the claim markers (\`glab issue update "\${NUM}" --unassign --unlabel in-progress\`), remove the worktree, and exit — splitting an omnibus issue is a human call, and parking it stops a perpetual drain from re-picking the same un-shippable issue every pass (Phase 1 step 4 skips \`needs-input\`).
+
+**Ambiguity is NOT a release trigger — decide, don't defer.** If the issue is merely open to more than one reasonable reading, or leaves a design choice unstated, do NOT bail to \`needs-input\`. Pick the most reasonable interpretation, record the approach you chose in a brief issue note (\`glab issue note "\${NUM}" -m "..."\`) so the decision is on the record, and implement it. The user would rather iterate on top of a shipped best-guess than have the issue parked waiting on a decision they didn't ask to make. Reserve \`needs-input\` — which pulls the issue out of the autonomous queue — for the narrow cases where proceeding would be **destructive or irreversible**, or genuinely requires the human: specific hardware/credentials you don't have, or a judgment only they can make. In those cases only, post the explaining note, **tag it \`needs-input\`** (\`glab issue update "\${NUM}" --label needs-input\`), release the claim markers (\`glab issue update "\${NUM}" --unassign --unlabel in-progress\`), remove the worktree, and exit cleanly. **That label is what lets an autonomous drain converge** — Phase 1 step 4 skips \`needs-input\` issues. Never leave a half-claimed issue.
+
+## Phase 4 — Implement
+
+Write the code, tests, and any docs the issue requires. Follow the repo conventions in CLAUDE.md. Run the relevant test suite as you go.
+
+**Roll discovered backbone work INTO this MR** — small supporting helpers, refactors, and tests that the fix depends on belong here, not a follow-up. Only defer genuinely-large adjacent work; when you do, file a NEW issue (\`glab issue create\`) tagged \`plan\` that references this one (\`Related to #<num>\`).
+
+Commit with a conventional message referencing the issue:
+
+\`\`\`
+<type>: <one-line description> (#<num>)
+\`\`\`
+
+## Phase 5 — Open the merge request
+
+This flow ships GitLab issues — it does NOT touch PLAN.md. The audit trail is the merged MR + \`git log\`.
+
+1. If the repo maintains a changelog, record a one-line entry **following the convention that repo documents** — read its \`CLAUDE.md\` and changelog README (e.g. \`.changelog/README.md\`) first. Some repos collect per-branch fragments in a directory (e.g. \`.changelog/next/\`) via a helper script rather than appending to one shared file, precisely so parallel agents don't conflict on every merge; use that flow when it's documented. Fall back to appending to the unreleased section (\`.changelog/NEXT.md\`, or \`## Unreleased\` in \`CHANGELOG.md\`) in the repo's existing prose style only when no convention is documented. If the repo has no changelog, skip this.
+2. Push the branch: \`git push -u origin "claim/issue-\${NUM}"\`
+3. Open the MR with \`glab mr create --fill --source-branch "claim/issue-\${NUM}" --target-branch "\${DEFAULT_BRANCH}" --yes\`. **Choose the issue trailer deliberately:** if this MR FULLY satisfies the issue's scope, the description MUST contain \`Closes #\${NUM}\` so the merge auto-closes it; if you deliberately shipped only PART of the issue (a valuable slice with real scope remaining), use \`Refs #\${NUM}\` instead (NOT \`Closes\`) and add a \`## Remaining\` section listing what's left — Phase 7 reconciles the issue so it is never stranded. Summarize what shipped + a short test plan (pass \`--description\` if \`--fill\` didn't capture it).
+
+## Phase 6 — Review and ship
+
+The configured reviewers for this task, in order, are \`{reviewers}\`. \`claude\` / \`codex\` / \`antigravity\` (CLI binary: \`agy\`) / \`grok\` invoke a local-CLI critique. (\`copilot\` is GitHub-only — skip it on GitLab.) When more than one is configured, run each in the listed order before merging.
+
+1. **Self-review your diff for reuse, quality, and efficiency** (DRY, dead code, naming, simpler equivalents, missed edge cases) and fix findings in the same diff BEFORE the reviewers run. Claude Code runs this as the three-agent \`/simplify\` pass; on other CLIs, do the equivalent review by hand.
+2. **Wait for each configured CLI reviewer's findings BEFORE merging.** For \`claude\` / \`codex\` / \`antigravity\` (CLI binary: \`agy\`) / \`grok\`, invoke that CLI headless against the MR diff, apply fixes, run tests, re-push — capped at 3 rounds — then advance to the next reviewer. A configured CLI reviewer whose binary is not on PATH is UNSATISFIED, not clean — that is a broken setup, not a passing review. Do NOT substitute your own self-review and do NOT merge; comment on the MR naming the missing command and stop.
+
+ **Review-stuck cleanup** (after 3 unresolved rounds): post one summarizing MR note (\`glab mr note\`), then run the worktree-only cleanup (\`cd {repoPath} && git worktree remove "\${WORKTREE}"\`). Leave the local branch, the open MR, the assignee, and the \`in-progress\` label in place so the human picks up cold. Do NOT run Phase 7.
+3. **Merge via \`glab mr merge\`** — NEVER a local \`git merge\`. \`glab mr merge\` takes the **MR IID**, which is NOT the issue number — resolve it from the source branch first, then merge by that IID:
+ \`\`\`bash
+ MR_IID="$(glab mr list --source-branch "claim/issue-\${NUM}" -F json | sed -n 's/.*"iid":\\([0-9]\\{1,\\}\\).*/\\1/p' | head -1)"
+ glab mr merge "\${MR_IID}" --yes --remove-source-branch \\
+ || glab mr merge "\${MR_IID}" --yes --squash --remove-source-branch
+ \`\`\`
+
+## Phase 7 — Clean up (post-merge ONLY)
+
+This phase runs only after the MR merged via Phase 6. From the **source repo** (cd back to {repoPath} first):
+
+\`\`\`bash
+cd {repoPath}
+git worktree remove "\${WORKTREE}"
+git branch -d "claim/issue-\${NUM}"
+\`\`\`
+
+If \`git branch -d\` refuses, use \`-D\` — the MR is confirmed merged, so the local branch is redundant.
+
+**Reconcile the issue — did this MR FULLY satisfy its scope?**
+- **Yes (full)** — the \`Closes #\${NUM}\` line already auto-closed it on merge to the default branch; if it's somehow still open, close it (\`glab issue close "\${NUM}"\`) and remove the label (\`glab issue update "\${NUM}" --unlabel in-progress\`).
+- **No — the remainder is a clean, separable chunk** — close THIS issue with a summarizing note (shipped ✓ / moved to #NEW), remove \`in-progress\`, and file ONE tightly-scoped follow-up for the remainder: \`glab issue create --title "…" --label plan --description "…\\n\\nRefs #\${NUM}"\` (carry over any \`area:*\` labels the issue had).
+- **No — the remainder is a continuation of the same scope** — keep the issue OPEN, post a \`Done ✓ / Remaining ▢\` note, and release the claim so the queue re-picks it: \`glab issue update "\${NUM}" --unassign --unlabel in-progress\`.
+
NEVER leave the issue OPEN with \`in-progress\` still on it — that strands it as a zombie (the claim queue skips \`in-progress\`, so the remaining scope is never re-picked). **Do NOT \`git pull\`** from inside this phase — the work is already integrated on GitLab via \`glab mr merge\`; leave the user's working tree alone.`,
],
// claim-issue v1 default — excluded every `plan`-labelled issue (the entire
@@ -5154,6 +5392,134 @@ If \`git branch -d\` refuses (the PR squash-merged on GitHub but local doesn't k
- **No — the remainder is a clean, separable chunk** — close THIS issue with a summarizing comment (shipped ✓ / moved to #NEW), remove \`in-progress\`, and file ONE tightly-scoped follow-up for the remainder: \`gh issue create --title "…" --label plan --body "…\\n\\nRefs #\${NUM}"\` (carry over any \`area:*\` labels the issue had).
- **No — the remainder is a continuation of the same scope** — keep the issue OPEN, post a \`Done ✓ / Remaining ▢\` comment, and release the claim so the queue re-picks it: \`gh issue edit "\${NUM}" --remove-label in-progress --remove-assignee @me\`.
+NEVER leave the issue OPEN with \`in-progress\` still on it — that strands it as a zombie (the claim queue skips \`in-progress\`, so the remaining scope is never re-picked). **Do NOT \`git pull\`** from inside this phase — the work is already integrated on GitHub via \`gh pr merge\`; leave the user's working tree alone.`,
+
+ // v10 default prompt — pre-converging-Phase-3-release (issue #4106)
+ `[Claim Issue: {appName}] Claim and ship the next open GitHub issue
+
+Pick the next available unclaimed open GitHub issue, **create your own worktree at \`claim/issue-<num>\`**, implement the fix, ship a PR that closes the issue, and clean up. This is the \`/claim --issues\` flow — same in-flight scan, same branch naming, same no-local-merge cleanup, but the work source is the repo's GitHub issue tracker instead of PLAN.md. **YOU pick the issue in Phase 1 — the scheduler does not reserve one for you.** Picking at execution time and immediately claiming (worktree + assignee + label) **narrows** the window for two concurrent runs to collide on the same issue — it does NOT eliminate it. Do NOT modify files in the source repo directly; ALL editing happens inside the worktree you create.
+
+{issueAuthorFilter}
+
+**How claiming works.** An issue is "in flight" when its number appears as the issue-position segment in either a \`claim/issue-<num>\` ref (the human/TUI pattern) or a \`cos/<task>/issue-<num>/<agent>\` ref (the CoS sub-agent pattern) across local branches, remote branches, or open PR head refs — OR the issue is already assigned to someone OR carries an \`in-progress\` label. The \`claim/issue-<num>\` branch + the assignee/\`in-progress\` markers you set ARE the claim, visible to every other agent (including parallel machines) and to the human running \`/claim --issues\` in a TUI.
+
+## Phase 1 — Pick the target issue
+
+Run steps 1–5 in order.
+
+1. cd into the repo root ({repoPath}) and confirm GitHub is the forge: \`gh repo view --json nameWithOwner -q .nameWithOwner\`. If \`gh\` is not authenticated or the remote is not GitHub, exit cleanly — this task only works against GitHub issue trackers.
+2. List candidate open issues **oldest-first**, honoring the author filter described above. \`gh issue list\` defaults to newest-first, so order on the SERVER with \`--search "sort:created-asc"\` — a client-side \`jq\` sort would only reorder the already-truncated newest page, dropping the true oldest issues on repos with more than \`--limit\` open issues:
+ \`\`\`bash
+ git fetch --prune 2>/dev/null
+ # Author filter (see the block above). Pass --author as a QUOTED single token —
+ # do NOT pack flag+value into one variable: a bare \`$VAR\` holding "--author x"
+ # is a single argv token in zsh (no word-splitting) and gh rejects it.
+ # Owner-only mode (default): resolve the owner, then add --author "$OWNER"
+ OWNER="$(gh repo view --json owner -q .owner.login)"
+ gh issue list --state open --author "$OWNER" --search "sort:created-asc" --json number,title,author,assignees,labels,createdAt --limit 100
+ # Any-author mode: run the SAME command WITHOUT the --author "$OWNER" flag.
+ \`\`\`
+3. Build the in-flight set. Collect every branch/PR ref:
+ \`\`\`bash
+ git branch -a --no-color --format='%(refname:short)'
+ gh pr list --state open --json headRefName -q '.[].headRefName' 2>/dev/null
+ \`\`\`
+ For each ref (after stripping any leading \`origin/\` / \`upstream/\` prefix), extract the issue number **only when the ref matches** \`claim/issue-<num>\` (number after \`claim/issue-\`) or \`cos/<task>/issue-<num>/<agent>\` (the \`issue-<num>\` third segment). Do NOT flag an issue just because its bare number appears elsewhere in a ref.
+4. **Pick the target issue:** walk the candidate list oldest-first and pick the FIRST issue where ALL of the following are true:
+ - Its number is NOT in the in-flight set.
+ - It has NO assignees (an assignee means another machine/human already claimed it).
+ - It does NOT carry any of these blocking labels: \`in-progress\`, \`blocked\`, \`needs-input\`, \`future\`, \`wontfix\`, \`question\`, \`discussion\`.
+ - It is NOT a tracking/umbrella **epic** — recognized by an \`epic\` label, a title ending in "(epic)", OR a title beginning with an \`[epic]\` bracket or \`Epic:\` tag (e.g. "[Epic] …" / "Epic: …", case-insensitive). An epic needs per-slice partial-ship (each slice its own PR, \`Refs\` not \`Closes\`), so leave it for a human or \`/claim --issues\` to split — don't claim it wholesale here. **The bare \`plan\` label is NOT a skip signal.** \`do-replan --issues\` (and \`/do:replan --issues\`) labels EVERY migrated backlog item \`plan\` — atomic bug-fixes included — so \`plan\` marks the *claimable* queue exactly as \`/do:next --issues\` treats it (it is that flow's required candidate label). Skipping all \`plan\` issues would discard the entire actionable backlog and falsely report an empty queue.
+5. **If no eligible issue exists**, exit cleanly — an empty actionable queue is a healthy state, not a failure.
+
+Capture the issue number as \`NUM\`, its title, and its full body — you'll reuse them in the PR and the \`Closes #<num>\` trailer.
+
+## Phase 2 — Claim (worktree + markers)
+
+Create the worktree on a branch named \`claim/issue-<num>\`, then set the cross-machine claim markers. Do all editing inside the worktree, NEVER in the source repo's working tree.
+
+\`\`\`bash
+NUM=<picked-number>
+WORKTREE="{worktreesRoot}/claim-issue-\${NUM}"
+mkdir -p {worktreesRoot}
+git fetch origin main
+git worktree add -b "claim/issue-\${NUM}" "\${WORKTREE}" origin/main
+# Cross-machine claim markers (best-effort — do not abort the run if these fail):
+gh issue edit "\${NUM}" --add-assignee @me 2>/dev/null
+gh issue edit "\${NUM}" --add-label in-progress 2>/dev/null
+cd "\${WORKTREE}"
+\`\`\`
+
+(If the repo's default branch is not \`main\`, detect it with \`gh repo view --json defaultBranchRef -q .defaultBranchRef.name\` and substitute it for \`main\` above.)
+
+**If \`git worktree add\` fails because the \`claim/issue-<num>\` branch already exists** (a concurrent run won the race, or a remote claim branch is now visible), do NOT force or reuse it — that branch IS another run's claim. Treat the issue as in-flight, return to Phase 1, and pick the next eligible issue; if nothing else is eligible, exit cleanly. Stash \`WORKTREE\` — you'll need it for Phase 7 cleanup.
+
+## Phase 3 — Verify still valid
+
+Read the full issue (\`gh issue view "\${NUM}" --comments\`) before writing any code. **If ANY of these are true, release the claim and re-pick** (remove the assignee + \`in-progress\` label you set, remove the worktree, return to Phase 1):
+
+- A comment indicates the issue was already fixed, superseded, or closed-then-reopened-for-tracking.
+- The request references a function, file, or component that no longer exists (\`grep -rn\` the named identifiers — if they're gone, the issue is stale).
+
+(A too-large scope is NOT in this release-and-re-pick list — releasing it just lets the next pass re-pick the same oversized issue. It has its own park path below.)
+
+**A genuinely too-large issue needs parking so the drain converges.** If the work is bigger than one coherent claim — it would touch files far outside the issue's scope (>5 unrelated files) — and you can't carve a valuable standalone slice to partial-ship via Phase 5's \`Refs\` path, post a brief comment naming the split you'd suggest, **tag it \`needs-input\`** (\`gh issue edit "\${NUM}" --add-label needs-input\`), release the claim markers (\`gh issue edit "\${NUM}" --remove-assignee @me --remove-label in-progress\`), remove the worktree, and exit — splitting an omnibus issue is a human call, and parking it is what stops a perpetual drain from re-picking the same un-shippable issue every pass (Phase 1 step 4 skips \`needs-input\`).
+
+**Ambiguity is NOT a release trigger — decide, don't defer.** If the issue is merely open to more than one reasonable reading, or leaves a design choice unstated, do NOT bail to \`needs-input\`. Pick the most reasonable interpretation, record the approach you chose in a brief issue comment (\`gh issue comment "\${NUM}" --body "..."\`) so the decision is on the record, and implement it. The user would rather iterate on top of a shipped best-guess than have the issue parked waiting on a decision they didn't ask to make. Reserve \`needs-input\` — which pulls the issue out of the autonomous queue — for the narrow cases where proceeding would be **destructive or irreversible**, or genuinely requires the human: specific hardware/credentials you don't have, or a judgment only they can make. In those cases only, post the explaining comment, **tag it \`needs-input\`** (\`gh issue edit "\${NUM}" --add-label needs-input\`), release the claim markers (\`gh issue edit "\${NUM}" --remove-assignee @me --remove-label in-progress\`), remove the worktree, and exit cleanly. **That label is what lets an autonomous drain converge** — Phase 1 step 4 skips \`needs-input\` issues. Never leave a half-claimed issue.
+
+## Phase 4 — Implement
+
+Write the code, tests, and any docs the issue requires. Follow the repo conventions in CLAUDE.md (no try/catch in route handlers, functional programming, Zod validation, Tailwind tokens, reactive UI updates). Run the relevant test suite as you go.
+
+**Roll discovered backbone work INTO this PR** — small supporting helpers, refactors, and tests that the fix depends on belong here, not a follow-up. Only defer genuinely-large adjacent work; when you do, file a NEW issue (\`gh issue create\`) tagged \`plan\` that references this one (\`Related to #<num>\`) rather than appending to PLAN.md.
+
+Commit with a conventional message referencing the issue so the trail is grep-able:
+
+\`\`\`
+<type>: <one-line description> (#<num>)
+\`\`\`
+
+## Phase 5 — Open the PR
+
+This flow ships GitHub issues — it does NOT touch PLAN.md. The audit trail is the merged PR + \`git log\`.
+
+1. If the repo maintains a changelog, record a one-line entry **following the convention that repo documents** — read its \`CLAUDE.md\` and changelog README (e.g. \`.changelog/README.md\`) first. Some repos collect per-branch fragments in a directory (e.g. \`.changelog/next/\`) via a helper script rather than appending to one shared file, precisely so parallel agents don't conflict on every merge; use that flow when it's documented. Fall back to appending to the unreleased section (\`.changelog/NEXT.md\`, or \`## Unreleased\` in \`CHANGELOG.md\`) in the repo's existing prose style only when no convention is documented. If the repo has no changelog, skip this — the PR + commit history is the record.
+2. Push the branch: \`git push -u origin "claim/issue-\${NUM}"\`
+3. Open the PR with \`gh pr create\`. Summarize what shipped + a short test plan. **Choose the issue trailer deliberately:** if this PR FULLY satisfies the issue's scope, the body MUST contain \`Closes #\${NUM}\` so the merge auto-closes it. If you deliberately shipped only PART of the issue (a valuable slice, with real scope still remaining), use \`Refs #\${NUM}\` instead (NOT \`Closes\`) and add a \`## Remaining\` section listing what's left — Phase 7 reconciles the issue so it is never stranded.
+
+## Phase 6 — Review and ship
+
+The configured reviewers for this task, in order, are \`{reviewers}\`. \`copilot\` waits for GitHub's auto-review; \`claude\` / \`codex\` / \`antigravity\` (CLI binary: \`agy\`) / \`grok\` invoke a local-CLI critique. When more than one is configured, run each in the listed order before merging — this mirrors slashdo's \`/do:pr --review-with <list>\`.
+
+1. **Self-review your diff for reuse, quality, and efficiency** (DRY, dead code, naming, simpler equivalents, missed edge cases) and fix findings in the same diff BEFORE the reviewers run. Claude Code runs this as the three-agent \`/simplify\` pass; on other CLIs, do the equivalent review by hand.
+2. **Wait for each configured reviewer's findings BEFORE merging.** \`gh pr merge --auto\` only waits for required status checks; it does NOT wait for code-review feedback. Run the reviewers in the listed order (\`{reviewers}\`); for \`copilot\`, poll up to 10 minutes for its review and address \`COMMENTED\` / \`CHANGES_REQUESTED\` findings (commit + push inside the worktree, re-poll), capped at 3 rounds. For \`claude\` / \`codex\` / \`antigravity\` (CLI binary: \`agy\`) / \`grok\`, invoke that CLI headless against the PR diff, apply fixes, run tests, re-push — capped at 3 rounds — then advance to the next reviewer. A configured CLI reviewer whose binary is not on PATH is UNSATISFIED, not clean — that is a broken setup, not a passing review. Do NOT substitute your own self-review and do NOT merge; comment on the PR naming the missing command and stop.
+
+ **Review-stuck cleanup** (after 3 unresolved rounds): post one summarizing PR comment (\`gh pr comment\`), then run the worktree-only cleanup (\`cd {repoPath} && git worktree remove "\${WORKTREE}"\`). Leave the local branch, the open PR, the assignee, and the \`in-progress\` label in place so the human picks up cold. Do NOT run Phase 7.
+3. **Merge via \`gh pr merge\`** — NEVER a local \`git merge\`. The repo may allow only one method, so try in order and use the first that succeeds:
+ \`\`\`bash
+ gh pr merge <pr-num> --auto --delete-branch \\
+ || gh pr merge <pr-num> --merge --delete-branch \\
+ || gh pr merge <pr-num> --squash --delete-branch \\
+ || gh pr merge <pr-num> --rebase --delete-branch
+ \`\`\`
+
+## Phase 7 — Clean up (post-merge ONLY)
+
+This phase runs only after the PR merged via Phase 6. From the **source repo** (cd back to {repoPath} first):
+
+\`\`\`bash
+cd {repoPath}
+git worktree remove "\${WORKTREE}"
+git branch -d "claim/issue-\${NUM}"
+\`\`\`
+
+If \`git branch -d\` refuses (the PR squash-merged on GitHub but local doesn't know yet), use \`-D\` — the PR is confirmed merged, so the local branch is redundant.
+
+**Reconcile the issue — did this PR FULLY satisfy its scope?**
+- **Yes (full)** — the \`Closes #\${NUM}\` trailer already auto-closed it; if it's somehow still open, close it (\`gh issue close "\${NUM}"\`) and remove the label (\`gh issue edit "\${NUM}" --remove-label in-progress\`).
+- **No — the remainder is a clean, separable chunk** — close THIS issue with a summarizing comment (shipped ✓ / moved to #NEW), remove \`in-progress\`, and file ONE tightly-scoped follow-up for the remainder: \`gh issue create --title "…" --label plan --body "…\\n\\nRefs #\${NUM}"\` (carry over any \`area:*\` labels the issue had).
+- **No — the remainder is a continuation of the same scope** — keep the issue OPEN, post a \`Done ✓ / Remaining ▢\` comment, and release the claim so the queue re-picks it: \`gh issue edit "\${NUM}" --remove-label in-progress --remove-assignee @me\`.
+
NEVER leave the issue OPEN with \`in-progress\` still on it — that strands it as a zombie (the claim queue skips \`in-progress\`, so the remaining scope is never re-picked). **Do NOT \`git pull\`** from inside this phase — the work is already integrated on GitHub via \`gh pr merge\`; leave the user's working tree alone.`,
],
// Basic self-improvement tasks: prior defaults that hardcoded the target app as
diff --git a/server/services/taskPromptDefaults/prompts.js b/server/services/taskPromptDefaults/prompts.js
index d6f2c2dd81..b7776c63a2 100644
--- a/server/services/taskPromptDefaults/prompts.js
+++ b/server/services/taskPromptDefaults/prompts.js
@@ -745,12 +745,12 @@ cd "\${WORKTREE}"
## Phase 3 — Verify still valid
-Read the full issue (\`gh issue view "\${NUM}" --comments\`) before writing any code. **If ANY of these are true, release the claim and re-pick** (remove the assignee + \`in-progress\` label you set, remove the worktree, return to Phase 1):
+Read the full issue (\`gh issue view "\${NUM}" --comments\`) before writing any code. **Every exit from this phase must leave a CONVERGING outcome on the issue — closed, or labeled \`needs-input\`.** Phase 1 step 4 skips both, so an autonomous drain stops re-picking the item. Releasing an issue OPEN and unlabeled is NOT an exit: the work detector still reports it actionable, so the next pass re-picks it and burns another no-op agent — every pass, forever.
-- A comment indicates the issue was already fixed, superseded, or closed-then-reopened-for-tracking.
-- The request references a function, file, or component that no longer exists (\`grep -rn\` the named identifiers — if they're gone, the issue is stale).
+- **Already fixed, superseded, or closed-then-reopened-for-tracking** — a comment says so, or the change it asks for is already on the default branch. **Close it:** post a comment naming the PR/commit (or issue) that already delivered it (\`gh issue comment "\${NUM}" --body "..."\`), then \`gh issue close "\${NUM}" --reason completed\` (use \`--reason "not planned"\` when it was superseded rather than delivered) and clear the markers (\`gh issue edit "\${NUM}" --remove-assignee @me --remove-label in-progress\`). Remove the worktree and return to Phase 1. **Evidence gate: if you cannot name the PR, commit, or issue that delivered it, this branch does NOT apply** — closing on a hunch destroys live work, which is far worse than one wasted pass. Treat the issue as real work and continue to Phase 4.
+- **Stale reference** — the request names a function, file, or component that no longer exists (\`grep -rn\` the named identifiers; if they're gone, the issue is stale). Post a comment naming what you searched for and what you found instead, **tag it \`needs-input\`** (\`gh issue edit "\${NUM}" --add-label needs-input\`), release the claim markers (\`gh issue edit "\${NUM}" --remove-assignee @me --remove-label in-progress\`), remove the worktree, and return to Phase 1. Re-scoping a stale issue against today's code is a human call — and the label is what keeps the drain off it in the meantime.
-(A too-large scope is NOT in this release-and-re-pick list — releasing it just lets the next pass re-pick the same oversized issue. It has its own park path below.)
+(A too-large scope is NOT in this list — it has its own park path below.)
**A genuinely too-large issue needs parking so the drain converges.** If the work is bigger than one coherent claim — it would touch files far outside the issue's scope (>5 unrelated files) — and you can't carve a valuable standalone slice to partial-ship via Phase 5's \`Refs\` path, post a brief comment naming the split you'd suggest, **tag it \`needs-input\`** (\`gh issue edit "\${NUM}" --add-label needs-input\`), release the claim markers (\`gh issue edit "\${NUM}" --remove-assignee @me --remove-label in-progress\`), remove the worktree, and exit — splitting an omnibus issue is a human call, and parking it is what stops a perpetual drain from re-picking the same un-shippable issue every pass (Phase 1 step 4 skips \`needs-input\`).
@@ -878,12 +878,12 @@ cd "\${WORKTREE}"
## Phase 3 — Verify still valid
-Read the full issue (\`glab issue view "\${NUM}"\`) before writing any code. **If ANY of these are true, release the claim and re-pick** (remove the assignee with \`glab issue update "\${NUM}" --unassign\` + the \`in-progress\` label with \`--unlabel in-progress\`, remove the worktree, return to Phase 1):
+Read the full issue (\`glab issue view "\${NUM}"\`) before writing any code. **Every exit from this phase must leave a CONVERGING outcome on the issue — closed, or labeled \`needs-input\`.** Phase 1 step 4 skips both, so an autonomous drain stops re-picking the item. Releasing an issue OPEN and unlabeled is NOT an exit: the work detector still reports it actionable, so the next pass re-picks it and burns another no-op agent — every pass, forever.
-- A note indicates the issue was already fixed, superseded, or closed-then-reopened-for-tracking.
-- The request references a function, file, or component that no longer exists (\`grep -rn\` the named identifiers — if they're gone, the issue is stale).
+- **Already fixed, superseded, or closed-then-reopened-for-tracking** — a note says so, or the change it asks for is already on the default branch. **Close it:** post a note naming the MR/commit (or issue) that already delivered it (\`glab issue note "\${NUM}" -m "..."\`), then \`glab issue close "\${NUM}"\` and clear the markers (\`glab issue update "\${NUM}" --unassign --unlabel in-progress\`). Remove the worktree and return to Phase 1. **Evidence gate: if you cannot name the MR, commit, or issue that delivered it, this branch does NOT apply** — closing on a hunch destroys live work, which is far worse than one wasted pass. Treat the issue as real work and continue to Phase 4.
+- **Stale reference** — the request names a function, file, or component that no longer exists (\`grep -rn\` the named identifiers; if they're gone, the issue is stale). Post a note naming what you searched for and what you found instead, **tag it \`needs-input\`** (\`glab issue update "\${NUM}" --label needs-input\`), release the claim markers (\`glab issue update "\${NUM}" --unassign --unlabel in-progress\`), remove the worktree, and return to Phase 1. Re-scoping a stale issue against today's code is a human call — and the label is what keeps the drain off it in the meantime.
-(A too-large scope is NOT in this release-and-re-pick list — releasing it just lets the next pass re-pick the same oversized issue. It has its own park path below.)
+(A too-large scope is NOT in this list — it has its own park path below.)
**A genuinely too-large issue needs parking so the drain converges.** If the work is bigger than one coherent claim — it would touch files far outside the issue's scope (>5 unrelated files) — and you can't carve a valuable standalone slice to partial-ship via Phase 5's \`Refs\` path, post a brief note naming the split you'd suggest, **tag it \`needs-input\`** (\`glab issue update "\${NUM}" --label needs-input\`), release the claim markers (\`glab issue update "\${NUM}" --unassign --unlabel in-progress\`), remove the worktree, and exit — splitting an omnibus issue is a human call, and parking it stops a perpetual drain from re-picking the same un-shippable issue every pass (Phase 1 step 4 skips \`needs-input\`).
@@ -1009,10 +1009,12 @@ cd "\${WORKTREE}"
## Phase 3 — Verify still valid
-Re-read the ticket (GET ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>) before writing any code. **If ANY of these are true, release the claim and re-pick** (transition the ticket back to its not-started status, remove the worktree, return to Phase 1):
+Re-read the ticket (GET ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>) before writing any code. **Every exit from this phase must leave a CONVERGING status on the ticket — Done/Closed, or a held status backed by a Review Hub todo.** Transitioning back to a not-started status is NOT an exit: Phase 1's not-started-only filter makes the ticket immediately re-eligible again, so the next pass re-picks it and burns another no-op run — every pass, forever.
-- The ticket references a function, file, or component that no longer exists (\`grep -rn\` the named identifiers — if they're gone, it's stale).
-(A too-large scope is NOT in this release-and-re-pick list — releasing it just lets the next pass re-pick the same oversized ticket. It has its own park path below.)
+- **Already fixed, superseded, or duplicated by another ticket** — a comment says so, or the change it asks for is already on the default branch. Post a ticket comment naming the PR/MR, commit, or ticket that already delivered it (POST ${PORTOS_API_URL}/api/jira/instances/<instanceId>/tickets/<KEY>/comments), transition the ticket to **Done/Closed**, remove the worktree, and return to Phase 1. **Evidence gate: if you cannot name the PR/MR, commit, or ticket that delivered it, this branch does NOT apply** — closing on a hunch destroys live work, which is far worse than one wasted pass. Treat the ticket as real work and continue to Phase 4.
+- **Stale reference** — the ticket names a function, file, or component that no longer exists (\`grep -rn\` the named identifiers; if they're gone, it's stale). Post a ticket comment naming what you searched for and what you found instead, create a Review Hub todo (POST ${PORTOS_API_URL}/api/review/todo with title "[<KEY>] Stale reference" and what a human must re-scope), and transition the ticket to a **Blocked/On Hold status if the workflow has one — NOT back to a not-started status**; if the workflow has no held status, leave it **In Progress** so Phase 1's filter excludes it. Then remove the worktree and return to Phase 1.
+
+(A too-large scope is NOT in this list — it has its own park path below.)
**A genuinely too-large ticket needs parking so the queue converges.** If the work is bigger than one coherent claim — it would touch files far outside the ticket's scope (>5 unrelated files) — and you can't carve a valuable standalone slice to ship first, splitting the omnibus is a human call: create a Review Hub todo (POST ${PORTOS_API_URL}/api/review/todo with title "[<KEY>] Needs clarification" and the split you'd suggest), transition the ticket to a **Blocked/On Hold status if the workflow has one — NOT back to a not-started status**, which would re-queue it under Phase 1 (ticket selection never consults Review Hub todos, so a not-started ticket is immediately re-eligible and the run would re-park it every pass); if the workflow has no held status, leave it **In Progress**. Phase 1's not-started-only filter keeps a non-not-started ticket out of the ready queue, and the Review Hub todo is the durable human signal — together they let the claim run converge. Then remove the worktree and exit.
diff --git a/server/services/taskPromptDefaults/versions.js b/server/services/taskPromptDefaults/versions.js
index 34761f81df..2b4b4db8dc 100644
--- a/server/services/taskPromptDefaults/versions.js
+++ b/server/services/taskPromptDefaults/versions.js
@@ -9,9 +9,9 @@
export const PROMPT_VERSIONS = {
'feature-ideas': 10, // v10: Phase 4 (Brainstorm) consults the repo's REJECTED.md and recently closed-unmerged PRs before proposing, so ideas the user already declined aren't re-proposed (mirrors idle-review's REJECTED.md contract). v9: drop DONE.md reads — use `.changelog/` + `git log` (last 50) as the completed-work signal
'plan-task': 13, // v13: Phase 5's changelog step reads the repo's documented convention FIRST (per-branch fragment directory + helper script, as PortOS now uses) and only falls back to detect-and-append when none is documented; the Phase 6 review-stuck note no longer names `.changelog/NEXT.md` as the file it wrote. v12: the reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — the bare `antigravity` slug is a command that exists nowhere, and a review-loop agent that probed for it concluded no reviewer was available and merged on its own self-review. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v11: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of a repo-relative `data/cos/worktrees/` path, so the agent's checkout no longer lands inside the managed app's working tree. v10: Phase 3 "decide, don't defer" — an *ambiguous* PLAN.md item no longer jumps to the Phase 3b clarification PR; the agent picks the most reasonable reading, notes it, and implements. Phase 3b is reserved for destructive/irreversible or genuinely-human-gated items. Mirrors claim-issue v7 + CLAUDE.md. v9: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v8: Phase-6 merge fallback prefers --merge over --squash (after --auto), matching the /do:pr + review-loop default and PortOS's merge-only policy
- 'claim-issue': 10, // v10: Phase 5's changelog step defers to the convention the repo documents (per-branch fragment directory + helper script when present) instead of prescribing an append to `.changelog/NEXT.md`. v9: reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — mirrors plan-task v12. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v8: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of a repo-relative `data/cos/worktrees/` path, so the agent's checkout no longer lands inside the managed app's working tree. v7: Phase 3 no longer releases/parks an *ambiguous* issue to `needs-input` — the agent decides (picks the most reasonable reading, records it in an issue comment, ships) rather than punting the choice back to a human; `needs-input` is reserved for destructive/irreversible or genuinely-human-gated (hardware/credentials) cases. Mirrors the "Decide, don't defer" policy in CLAUDE.md. v6: Phase 1 epic skip also recognizes a leading `[epic]` bracket or `Epic:` colon title tag (e.g. "[Epic] …" / "Epic: …"), not just an `epic` label or a "(epic)" suffix — mirrors the perpetualWork detector so a `[Epic]`-titled issue with no `epic` label stops re-spawning a claim agent that always skips it (perpetual drain now converges/parks). v5: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v4: Phase 5 chooses the issue trailer deliberately (Closes for a full ship, Refs + a `## Remaining` section for a partial one) and Phase 7 reconciles the issue with the partial-ship hybrid — close + file a scoped follow-up when the remainder is separable, else comment "done/remaining" + release the `in-progress` claim — so a partial ship is never left OPEN + `in-progress` (a zombie the claim queue skips forever). v3: Phase 3 tags an ambiguous/too-large issue `needs-input` (not just a comment) so it's excluded from future autonomous claims — required for `perpetual` (drain-until-done) mode to converge instead of re-picking the same un-actionable issue. v2: stop treating the bare `plan` label as a skip — `plan` is the claimable-queue label (do-replan --issues labels every migrated backlog item `plan`), so v1's exclusion emptied the whole actionable queue; now skip only true epics (`epic` label or "(epic)" title)
- 'claim-issue-gitlab': 9, // v9: mirrors claim-issue v10 — Phase 5's changelog step defers to the repo's documented convention (per-branch fragments) rather than prescribing a `.changelog/NEXT.md` append. v8: reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — mirrors plan-task v12. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v7: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of a repo-relative `data/cos/worktrees/` path, so the agent's checkout no longer lands inside the managed app's working tree (mirrors claim-issue v8). v6: mirrors claim-issue v7 — Phase 3 decides an *ambiguous* issue (record the chosen reading in an issue note, ship) instead of parking it to `needs-input`, which is reserved for destructive/irreversible or genuinely-human-gated (hardware/credentials) cases. v5: mirrors claim-issue v6 — Phase 1 epic skip also recognizes a leading `[epic]` bracket or `Epic:` colon title tag (e.g. "[Epic] …" / "Epic: …"), not just an `epic` label or a "(epic)" suffix, so the GitLab detector/agent converge on epic-titled issues too. v4: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v3: mirrors claim-issue v4 — Phase 5 chooses Closes-vs-Refs deliberately and Phase 7 reconciles the issue with the partial-ship hybrid (close + scoped follow-up when separable, else "done/remaining" note + release the `in-progress` claim) so a partial ship is never stranded. v2: Phase 3 tags an ambiguous/too-large issue `needs-input` (mirrors claim-issue v3) so it's excluded from future autonomous claims — required for `perpetual` (drain-until-done) mode to converge. v1: GitLab sibling of claim-issue — same 7-phase /claim --issues flow over `glab` issues + merge requests. Reached via the claim-work router when an app's resolved workTracker is 'gitlab'.
- 'claim-issue-jira': 7, // v7: mirrors claim-issue v10 — Phase 5's changelog step defers to the repo's documented convention (per-branch fragments) rather than prescribing a `.changelog/NEXT.md` append. v6: reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — mirrors plan-task v12. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v5: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of `{repoPath}/data/cos/worktrees/`, so the agent's checkout no longer lands inside the managed app's working tree (mirrors claim-issue v8). v4: mirrors claim-issue v7 — Phase 3 decides an *ambiguous* ticket (record the chosen reading in a ticket comment, ship) instead of parking it to a "Needs clarification" Review Hub todo, and Phase 1 no longer skips a merely-underspecified ticket; the todo is reserved for destructive/irreversible or genuinely-human-gated cases. v3: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v2: Phase 5 records remaining scope in the ticket (Done/Remaining comment) and files a follow-up ticket when a partial ship's remainder is separable, so remaining work isn't lost when a human lands the MR/PR. v1: JIRA sibling of claim-issue — claim ONE ready sprint ticket, move it To Do→In Progress→In Review around a self-managed worktree + MR/PR. Reached via the claim-work router when an app's resolved workTracker is 'jira' (replaces the prior jira→jira-sprint-manager route).
+ 'claim-issue': 11, // v11: EVERY Phase-3 release now converges — the "already fixed / superseded" case CLOSES the issue (with a comment naming what delivered it) and the "stale reference" case tags `needs-input`, instead of both releasing the issue open and unlabeled. `isActionableIssue` (perpetualWork.js) can only see labels/assignees/epic/in-flight, so a body-or-comment-driven release left the issue looking actionable and the perpetual drain re-spawned a no-op agent on it every tick. v10: Phase 5's changelog step defers to the convention the repo documents (per-branch fragment directory + helper script when present) instead of prescribing an append to `.changelog/NEXT.md`. v9: reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — mirrors plan-task v12. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v8: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of a repo-relative `data/cos/worktrees/` path, so the agent's checkout no longer lands inside the managed app's working tree. v7: Phase 3 no longer releases/parks an *ambiguous* issue to `needs-input` — the agent decides (picks the most reasonable reading, records it in an issue comment, ships) rather than punting the choice back to a human; `needs-input` is reserved for destructive/irreversible or genuinely-human-gated (hardware/credentials) cases. Mirrors the "Decide, don't defer" policy in CLAUDE.md. v6: Phase 1 epic skip also recognizes a leading `[epic]` bracket or `Epic:` colon title tag (e.g. "[Epic] …" / "Epic: …"), not just an `epic` label or a "(epic)" suffix — mirrors the perpetualWork detector so a `[Epic]`-titled issue with no `epic` label stops re-spawning a claim agent that always skips it (perpetual drain now converges/parks). v5: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v4: Phase 5 chooses the issue trailer deliberately (Closes for a full ship, Refs + a `## Remaining` section for a partial one) and Phase 7 reconciles the issue with the partial-ship hybrid — close + file a scoped follow-up when the remainder is separable, else comment "done/remaining" + release the `in-progress` claim — so a partial ship is never left OPEN + `in-progress` (a zombie the claim queue skips forever). v3: Phase 3 tags an ambiguous/too-large issue `needs-input` (not just a comment) so it's excluded from future autonomous claims — required for `perpetual` (drain-until-done) mode to converge instead of re-picking the same un-actionable issue. v2: stop treating the bare `plan` label as a skip — `plan` is the claimable-queue label (do-replan --issues labels every migrated backlog item `plan`), so v1's exclusion emptied the whole actionable queue; now skip only true epics (`epic` label or "(epic)" title)
+ 'claim-issue-gitlab': 10, // v10: mirrors claim-issue v11 — every Phase-3 release converges (close the already-fixed/superseded issue, tag the stale-reference one `needs-input`) so the perpetual drain stops re-picking it. v9: mirrors claim-issue v10 — Phase 5's changelog step defers to the repo's documented convention (per-branch fragments) rather than prescribing a `.changelog/NEXT.md` append. v8: reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — mirrors plan-task v12. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v7: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of a repo-relative `data/cos/worktrees/` path, so the agent's checkout no longer lands inside the managed app's working tree (mirrors claim-issue v8). v6: mirrors claim-issue v7 — Phase 3 decides an *ambiguous* issue (record the chosen reading in an issue note, ship) instead of parking it to `needs-input`, which is reserved for destructive/irreversible or genuinely-human-gated (hardware/credentials) cases. v5: mirrors claim-issue v6 — Phase 1 epic skip also recognizes a leading `[epic]` bracket or `Epic:` colon title tag (e.g. "[Epic] …" / "Epic: …"), not just an `epic` label or a "(epic)" suffix, so the GitLab detector/agent converge on epic-titled issues too. v4: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v3: mirrors claim-issue v4 — Phase 5 chooses Closes-vs-Refs deliberately and Phase 7 reconciles the issue with the partial-ship hybrid (close + scoped follow-up when separable, else "done/remaining" note + release the `in-progress` claim) so a partial ship is never stranded. v2: Phase 3 tags an ambiguous/too-large issue `needs-input` (mirrors claim-issue v3) so it's excluded from future autonomous claims — required for `perpetual` (drain-until-done) mode to converge. v1: GitLab sibling of claim-issue — same 7-phase /claim --issues flow over `glab` issues + merge requests. Reached via the claim-work router when an app's resolved workTracker is 'gitlab'.
+ 'claim-issue-jira': 8, // v8: mirrors claim-issue v11 in JIRA's status vocabulary — an already-fixed/superseded ticket transitions to Done/Closed and a stale-reference ticket parks on a Blocked/On Hold status behind a Review Hub todo, instead of transitioning back to a not-started status that Phase 1 immediately re-picks. v7: mirrors claim-issue v10 — Phase 5's changelog step defers to the repo's documented convention (per-branch fragments) rather than prescribing a `.changelog/NEXT.md` append. v6: reviewer bullets name the antigravity reviewer's actual PATH binary (`agy`) — mirrors plan-task v12. The same bump adds the missing-binary guard: a reviewer whose CLI is not on PATH is UNSATISFIED, never a clean review the agent substitutes its own self-review for. v5: worktree is created under PortOS's shared worktrees dir (`{worktreesRoot}` → data/cos/worktrees) instead of `{repoPath}/data/cos/worktrees/`, so the agent's checkout no longer lands inside the managed app's working tree (mirrors claim-issue v8). v4: mirrors claim-issue v7 — Phase 3 decides an *ambiguous* ticket (record the chosen reading in a ticket comment, ship) instead of parking it to a "Needs clarification" Review Hub todo, and Phase 1 no longer skips a merely-underspecified ticket; the todo is reserved for destructive/irreversible or genuinely-human-gated cases. v3: per-kind reviewer bullets name `grok` alongside `claude`/`codex`/`antigravity` as a local-CLI reviewer (grok is now a selectable Review Loop reviewer). v2: Phase 5 records remaining scope in the ticket (Done/Remaining comment) and files a follow-up ticket when a partial ship's remainder is separable, so remaining work isn't lost when a human lands the MR/PR. v1: JIRA sibling of claim-issue — claim ONE ready sprint ticket, move it To Do→In Progress→In Review around a self-managed worktree + MR/PR. Reached via the claim-work router when an app's resolved workTracker is 'jira' (replaces the prior jira→jira-sprint-manager route).
'pr-reviewer': 3, // v3: multi-stage pipeline (security scan → code review + merge)
'code-reviewer-a': 1, // v1: 2-stage pipeline (codebase review → triage & implement)
'code-reviewer-b': 1, // v1: 2-stage pipeline (codebase review → triage & implement)