Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
Pulse v6 Release Promotion Policy
This document defines how Pulse v6 and later releases move from development to customer-facing availability. It is the release-trust contract for Pulse Pro, Cloud, and self-hosted production users.
Goals
- Stable customers must not become the first test cohort for new changes.
- Development speed must stay decoupled from customer exposure.
- Every broad rollout must have explicit validation and rollback rules.
Channel Contract
stable- Default for new installs.
- The only recommended channel for paid and production environments.
- Publishes only non-prerelease tags.
- The only channel eligible for unattended broad rollout.
preview(stored asrcin the existing update-channel API and persisted settings for backward compatibility)- Opt-in channel for internal use, staging-like environments, and explicitly willing preview users.
- Publishes governed prerelease tags such as
6.5.0-alpha.1,6.5.0-beta.1, and6.5.0-rc.1. - Must never be the default channel.
- In v6, the legacy
rcwire value affects manual and in-app preview update selection; unattended systemd auto-updates remainstable-only.
- Source builds
- Are not a customer-facing release channel.
- Remain reserved for development, debugging, and branch validation.
Reporter Test Image Contract
A reporter test image is an issue-scoped diagnostic source build for one or a few explicitly participating Docker users. It exists to validate a reviewed fix quickly without publishing a prerelease or exposing the broader preview cohort to an unqualified candidate.
It is not a fourth release channel. It does not count as alpha, beta, RC, stable, a published prerelease, release qualification, or stable-promotion lineage.
Eligibility
Use a reporter test image only when all of these conditions hold:
- the reported behavior has a concrete diagnosis or reproduction, an exact reviewed fix commit, and targeted automated regression proof
- the reporter runs Docker or an equivalent OCI deployment and the affected behavior can be validated without an installer, updater, Helm, mobile, private paid-runtime, or other release-only surface
- the validation cohort is one or a few named issue participants rather than a broad preview audience
- the reporter can pin an exact image and return to a known release image
- the test does not require destructive data migration, production secret handling, or a widened authentication, authorization, tenant, billing, licensing, relay, or other trust boundary
If any condition is false or uncertain, use the governed prerelease path. Use beta while user validation or planned product changes remain. Use RC only when the build is believed capable of becoming stable without product changes.
Build And Publication
- Build from one exact reviewed commit in the canonical Pulse repository. Never build arbitrary contributor code on a machine or builder that can access registry credentials, signing material, production data, workspace secrets, or unrelated Docker workloads.
- Use an isolated builder and clean source state. Do not pass host secrets,
production mounts, privileged runtime access, or unrelated Docker sockets
into the build. The workstation's current default builder for reporter
test images, with fallback and traps, is documented in the workspace
LOCAL_CAPABILITIES.md("Remote amd64 Builder on longonk442"). The server-only diagnostic image (no embedded installer or agent-download artifacts) is thehosted_runtimeDockerfile target. SettingBUILD_AGENT=0does NOT achieve this: the defaultruntimetarget always builds the full agent artifact set regardless of that arg. - Publish a new immutable tag shaped as
test-<issue>-<short-sha>, for examplercourtman/pulse:test-1437-44a3f194. Never overwrite or reuse the tag. - Stamp OCI source and revision labels. The running Pulse version must identify
the released base plus test issue and commit metadata, for example
v6.2.1+test.1437.44a3f194. It must not impersonate a stable or RC version. - Build only the reporter's required platform unless more than one platform is part of the named validation cohort. Record every published platform.
- Run the targeted regression proof plus a clean-container start, health check, and version check before sharing the image. Pull the published image by digest for the final smoke so registry publication itself is exercised.
- Record the source commit, image tag, registry digest, platform, proof commands, smoke result, exact pull or Compose override, and exact rollback image in the task handoff. Preserve the tag, digest, test steps, and rollback image in the approved issue reply so later triage can recover the artifact identity without relying on chat history.
Reporter Guidance And Claims
- Do not offer the image until it is published, pullable by digest, and has passed the required smoke.
- The approved reporter reply must include the exact tag and digest, describe it as a temporary diagnostic build, name the focused checks, recommend a backup and non-production use where practical, provide the prior stable rollback image, and request fresh diagnostics from the same reproduction window if validation fails.
- Keep the issue open until the named user-visible behavior is confirmed or conservatively superseded by another active issue.
- Reporter confirmation is narrow live evidence for the named issue, environment, commit, image digest, and exercised behavior. It does not qualify installers, updater behavior, Helm, other architectures, private paid runtime, cross-repo compatibility, migrations, security boundaries, or the wider release.
- A successful test does not force a release. The fix ships in the next
candidate the release train cuts from
main, or sooner through an early cut when it should not wait. Any later prerelease, stable, or patch must rebuild and qualify through the canonical release workflow rather than promote the reporter image.
Forbidden Release Mutations And Lifecycle
- A reporter test image must never create a GitHub release or git tag, update release notes or update feeds, publish Helm, move Docker aliases, update the demo, stage or promote private paid artifacts, or satisfy a prerelease or stable release gate.
- Never attach
latest, a stable version, an alpha, beta, or RC version, or another mutable alias to the image. - Failed validation is fixed forward from a new reviewed commit and published under a new commit-derived tag. Shared tags and digests are immutable.
- After a stable release containing the fix ships and the issue is resolved, the test image becomes eligible for removal only with explicit maintainer approval. The old tag remains retired and must never be reused.
Development Model
- Use short-lived feature branches and feature flags for incomplete or risky work.
- Do not move directly from "issue fixed" to "all customers updated".
- Channel promotion is the primary customer-safety boundary.
- Branch topology may change over time; the
stableversuspreviewcustomer contract must not. - The active release profile in
docs/release-control/control_plane.jsonowns the governed prerelease and stable release branches for the current line; release automation must resolve branch requirements from that file instead of assumingmain.
Runtime Verification Claim Levels
Release status language is an evidence contract. Use these three levels and do not promote a claim beyond the evidence that exists:
implemented- The source change and targeted regression proof exist.
- This does not mean a release artifact contains the change or that a live installation is running it.
release-validated- The immutable release artifact containing the change passed its governed build, artifact, install, and release-pipeline checks.
- Publication, a successful installer, and a displayed version number do not by themselves prove the affected behavior on real hardware.
live-verified- The exact release is running on the named target and a fresh, machine-readable assertion against the affected live API passed.
- A saved receipt must be independently verified for the expected target, exact version, assertion, and allowed age before anyone describes the issue as fixed on hardware, fixed in production, or live verified.
For the Proxmox protection-posture persistence regression, the canonical
collector and verifier are scripts/release_control/live_runtime_proof.py.
The collector must query /api/version and every page of
/api/recovery/postures, require a non-empty successful-posture cohort, and
fail while any workload with lastSuccessfulPointAt remains unknown. It must
record the target origin, TLS-verification state, exact expected and observed
versions, packaged-versus-development runtime state, UTC collection time,
posture counts, failing resource IDs, and raw response SHA-256 values in a
sealed JSON receipt. Authentication values must be read from named environment
variables rather than command-line values or receipt content.
Example post-install proof:
export PULSE_LIVE_PROOF_AUTHORIZATION='Bearer <monitoring-read-token>'
python3 scripts/release_control/live_runtime_proof.py collect \
--base-url https://pulse.example.net \
--expected-version 6.2.0-rc.8 \
--authorization-env PULSE_LIVE_PROOF_AUTHORIZATION \
--minimum-postures 1 \
--minimum-successful-postures 1 \
--output /secure/release-evidence/pulse-6.2.0-rc.8-live.json
python3 scripts/release_control/live_runtime_proof.py verify \
--receipt /secure/release-evidence/pulse-6.2.0-rc.8-live.json \
--expected-origin https://pulse.example.net \
--expected-version 6.2.0-rc.8 \
--max-age-seconds 3600
The receipt contains operational target identity and may contain resource IDs,
so retain it in the restricted release-evidence location rather than a public
release body. Missing, stale, failed, edited, wrong-target, wrong-version, or
TLS-unverified receipts leave the claim at implemented or
release-validated; an operator statement cannot substitute for the receipt.
Prerelease Rules
- Published prereleases use one of three maturity stages:
alpha.Nis incomplete or experimental and intended for internal or tightly controlled evaluation.beta.Nis the normal user-testing stage. It may contain known gaps and planned product changes and is not represented as a possible stable build.rc.Nis the release train's candidate for stable: it is promoted unchanged unless an openrelease-blockerissue stops it. RC publication runs the stable-depth integration gate in addition to the common release checks.
- Stable promotion lineage must come from a published
rc.N. Alpha and beta evidence inform the release, but neither can be promoted directly to stable. - Each published prerelease must have:
- Targeted automated checks for touched release surfaces.
- A smoke install on a fresh or staging-like environment.
- Release notes plus the rollback target and exact reinstall command recorded before publish.
- At least one live run of the release pipeline for the prerelease tag itself, not only structural workflow validation.
- A governed prerelease publication record; an accidental git tag by itself does not count as a shipped prerelease.
- A published alpha, beta, or RC is a cohort checkpoint, not a delivery vehicle for each individual fix. After the first checkpoint at a maturity stage on a version line, at least 24 hours of public observation must elapse before another checkpoint at that same stage may be published. Moving from alpha to beta or beta to RC is a maturity decision and starts a new stage. Accumulate compatible fixes and release-note outcomes during the window. Candidate preparation, draft creation, and Release Dry Run remain available throughout it because they do not replace the public cohort.
- Use an immutable issue-and-commit reporter test image for narrow confirmation that cannot justify a new public cohort. Broad release qualification remains on the governed prerelease path, but successful narrow validation does not bypass the 24-hour publication boundary.
- Failed prereleases are fixed forward and replaced with a new prerelease. They are never
promoted as-is to
stable.
Release Train
Releases are mechanical (founder direction, 4 October 2026). No model judges,
holds or schedules a release. The release train (pulse-maintainer-ship on
pulse-dev, documented in pulse-dev-infra/docs/release-train.md) replaced the
release steward, its publisher, the nightly rehearsal and the release-line
lane. Every other document that describes releases defers to this section and
to that direction.
- Betas. From the last stable release until the candidate is due, the
train cuts a beta for the next minor from the head of
mainevery 24 hours when there are new changes. This follows the founder's direction on 13 October 2026 to publish almost daily betas. Published betas remain at least 24 hours apart, and no beta is cut within a day of the candidate being due. Already recorded publication and retry deadlines are honoured when the cadence changes. Betas use the normal prerelease qualification and publication path, do not soak or promote, and a failed beta does not hold the candidate or stable release. - Cut. Fourteen days after the last stable release, or earlier on
pulse-maintainer-ship request, the train cuts a release candidate for the next minor version from the head ofmain. A release carries everything onmainat its cut. Nothing is selected for a release or copied onto it afterwards. An important fix that should not wait for the cycle ships by requesting an early cut. The train does not cut whenmainhas nothing new since the last stable release. A request takes effect at the next train run when no candidate is in progress andmainhas changed. A request made while a candidate is soaking replaces that candidate with a fresh one cut frommain, which restarts the soak. While arelease-blockerissue holds the soaking candidate the request waits. A request made while a candidate is being prepared or published waits for that attempt to finish: once the candidate publishes the request replaces it, and if the attempt fails the request starts the retry at once, even while the failure's issue is open. - Versions. Version numbers are consecutive: the release after stable
vX.Y.ZisvX.(Y+1).0. Patch releases are not scheduled. Each candidate for a version takes the next unusedrc.Nnumber, one above every existing candidate tag of that version. - Soak. A published candidate soaks for 24 hours on the preview channel. Successive candidates for one version are published at least 24 hours apart, and beta time never counts toward a candidate's soak.
- Promote. After a clean soak the train promotes the exact candidate to
stable. The resolver refuses a stable promotion whose tree differs from the
promoted candidate in anything but release metadata (version, chart,
compose, release notes, upgrade guide, release records) unless
hotfix_exceptionnames active customer harm. The v6.4.0 promotion, which shipped 64 changed files thatv6.4.0-rc.12had not soaked, is the case this rule prevents. - Stop. Only an open issue labelled
release-blockerstops a promotion. Product intelligence adds that label when a report shows that something which worked in the previous stable release is broken in the current candidate. When every such issue is closed, the train cuts a fresh candidate frommainand that candidate starts its own soak. The train does not check that the fix landed, so arelease-blockerissue is closed only once its fix is onmain. If a promotion stays held for more than 72 hours, the train notifies the operator once. A defect the current stable release already has is fixed onmainand ships in the next release. - Failures. A failed build, test or publication is repaired on
main. The train reruns a failed release workflow once, then opens arelease-blockerissue naming the failure and cuts a fresh candidate frommain12 hours later, or at once on request. A failed private Pro source-pair pull request fails the attempt without a rerun. - Workflow checks. The GitHub release workflow's own checks are unchanged: exact source, signing, the private Pro build and the promotion rules in this document.
History
These records describe releases before the train and stay as written.
The release train was first adopted on 2026-09-01 under the delivery contract, with a release steward that cut
release/v6.Nlines, judged holds against listed stop reasons, and backported fixes to the line. The founder direction of 4 October 2026 replaced that with the mechanical train above.Version-bound owner exceptions waived the soak for v6.0.0, v6.1.0, v6.2.0, v6.3.0, and v6.4.0. They remain recorded and bounded; the train does not continue the practice. An exception requires active customer harm and is recorded in the release notes.
The
v6.4.3patch line predates the first train and is the first line released under the train's branch rule.release/v6.4was created frommainat the exact-SHA-qualified commit56e51e622eon 2026-09-02 and is declared incontrol_plane.jsonwith the version prefix6.4.3, so the release workflow refuses av6.4.3dispatch from any other branch and a movingmaincan no longer invalidate the compiler's exact-SHA binding between dispatch and compilation, which is what failed run 33579042375. Earlier6.4.xversions keep their historicalmainmapping.The forward regression checkpoint
v6.4.4-beta.1uses the samerelease/v6.4line, with an explicit6.4.4mapping for beta, RC and eventual stable. This is a maturity reset, not new feature scope: a6.4.3-beta.Nwould sort below the publishedv6.4.3-rc.1.v6.4.4-beta.1advances both that preview and stablev6.4.1;v6.4.1remains the rollback target. Later qualification proceeds throughv6.4.4-rc.Nand exact same-version stable promotion, including a fresh 72-hour clean RC soak. Beta time does not count. Mapping is preparation, not readiness or publication authority: failed candidate checks still require repair or an evidence-based disposition under the existing gates. Land the mapping and resolver contract on canonical main and backport it to the release line before taking a fresh bound packet. Unlisted patches and new product work retain their existing mapping and scope.The following reliability patch
v6.4.5also usesrelease/v6.4, explicitly mapped for beta, RC and stable. It remains separate from the selectedv6.4.4candidates: this mapping does not change their source, version or qualification. Land the mapping and resolver tests on main, then adapt them to the release line at the following patch checkpoint before selecting av6.4.5candidate. Unlisted patches still use their existing branch policy. Normal qualification, checkpoint spacing and exact-RC soak requirements remain unchanged.
Paid Pro Artifact Lineage
- Customer-facing private Pulse Pro archives and private Pulse Pro Docker images must track the same immutable release checkpoint as the public Pulse release they support.
- During a v6 prerelease phase, private Pro artifacts must be built from the
exact public alpha, beta, or RC tag, use that same version, and publish under
matching artifact names, R2 prefixes, and Docker tags such as
6.5.0-beta.1. - Do not build or advertise
license.pulserelay.pro/pulse-pro:6.0.0, apulse-pro-v6.0.0-...private archive, or a GA-shaped private R2 prefix until the intentional v6 GA publish. - A private Pro build from a moving branch is valid only as an internal proof artifact. It is not valid customer guidance and must not update the live paid-download manifest or private Docker customer tag.
- Customer-facing private Pro archive and exact-version Docker staging is part
of the public v6 release pipeline. After preparation and publication trust
preflight,
create-release.ymldispatchesrcourtman/pulse-enterpriseBuild Pro Releasewith the exact public source SHA and anticipated governed tag,upload_to_r2=true,publish_docker_image=true, and an R2 prefix derived by the release run. This inert staging may run before public draft creation. The immutable readiness gate must wait for that workflow to succeed. Every cross-repository dispatch must request GitHub's returned workflow-run details and poll that exact run ID. Selecting the newest run by workflow, branch, or dispatch timestamp is forbidden because different release versions and manual dispatches may run concurrently. - The public v6 release pipeline must durably dispatch a dedicated convergence
run before it publishes GitHub, then publish and publicly verify the GitHub
release before that run may dispatch
rcourtman/pulse-proPromote Paid Runtime Releasewith the same version and R2 prefix. The live paid-download broker is a mutable customer pointer and must never advance before the verifiedrelease-activation.jsoncommit marker exists. A failed private build prevents that commit. A failed live promotion is post-commit convergence debt: it fails and retries the separate convergence run without claiming that the already-public release rolled back. The activation marker must bind the exact staged R2 prefix. The dispatch must pass that prefix with the exact Pulse lease SHA and convergence run ID.pulse-promust reject an unleased dispatch, verify the public Pulse lock ref, lease commit owner, active convergence run, and activation marker without relying on its repository-scopedGITHUB_TOKEN, then repeat that check immediately before live mutation.pulse-promay serialize only the same validated lease correlation, never all releases or arbitrary R2 prefixes. Exact duplicates are therefore sequential and target-identical, while invalid lease values cannot replace a legitimate pending child. - Customer-facing private Pro archive or Docker promotion must use the generated
paid-runtime proof packet from the Pro release workflow. The canonical command
is
scripts/promote_paid_runtime_release_packet.sh --release-dir <proof-packet-dir> --admin-token-file <explicit-token-file> --execute-livefromrepos/pulse-pro; GA promotions also require--allow-ga-prefix. - The promotion command is the release gate for the live paid-download broker:
it validates the proof packet signatures, installs the exact manifest on
pulse-license, runs the live customer-path proof, and restores the previous remote manifest if the gate fails. Do not send customer instructions from a customer-facing private Pro prerelease or stable release until that command passes.
v5 Maintenance Policy
- When Pulse v6 reaches
stable, Pulse v5 immediately enters maintenance-only support. - The maintenance-only window lasts 90 calendar days from the v6 GA or stable release date.
- During that window, v5 fixes are limited to:
- critical security issues
- critical correctness or data-loss issues
- migration blockers that prevent customers from reaching a safe v6 path
- v5 will not receive:
- new features
- normal bug-fix backports
- pricing-model exceptions
- entitlement-model parity work introduced for v6
- After the 90-day window ends, v5 may continue running for users who choose to stay on it, but it is unsupported.
- The v6 GA announcement must publish the exact v5 end-of-support date calculated from the GA publication date.
- Before GA promotion is actually cleared, release notes may keep placeholder dates for the GA notice; those placeholders do not satisfy the promotion gate by themselves.
V5_MAINTENANCE_SUPPORT_POLICY.mdis the canonical source for this policy and the required GA release notice.
Stable Promotion Rules
- A first stable release, a stable minor release, and every patch that crosses one of the RC-required risk boundaries below must be promoted from a commit that has already been exercised as a published RC.
- An RC git tag counts as stable-promotion lineage only if that RC was actually published through the governed prerelease path. Alpha tags, beta tags, and accidental or abandoned RC tags do not satisfy the stable-promotion requirement.
- For v6 GA, do not promote to
stableuntil the active control-plane target is the GA-promotion target and satisfies itsrelease_readycompletion rule. - Every stable promotion requires:
- Applicable items in
PRE_RELEASE_CHECKLIST.mdcomplete. - Applicable entries in
HIGH_RISK_RELEASE_VERIFICATION_MATRIX.mdcleared. - The previous stable rollback target and exact reinstall command recorded.
- Applicable items in
- A first stable release or RC-required stable promotion additionally requires:
- No known unresolved RC-era user-visible issues intended for the v6 GA scope remain open. Each one must be fixed in the candidate, proven invalid with evidence, or conservatively superseded with the original failure resolved or explicitly narrowed.
- A live release-pipeline exercise already completed for the promoted prerelease tag, not only YAML lint or static workflow validation.
- The first v6 GA promotion additionally requires:
- The locked 90-day v5 maintenance-only policy in
V5_MAINTENANCE_SUPPORT_POLICY.mdand the exact end-of-support notice ready to publish with the promotion.
- The locked 90-day v5 maintenance-only policy in
- RC-derived stable promotions require a minimum 24-hour prerelease soak after the candidate is available to internal or staging-like users.
- Hotfix exception:
- Bypassing an RC requirement or shortening an RC soak is allowed only for narrowly scoped fixes to active customer harm.
- The exception plus the rollback target and exact reinstall command must be recorded in the release notes or release ticket before promotion.
- v6.0.0 owner-risk exception:
- On 2026-07-02, after seven v6 release candidates, the release owner
explicitly approved promoting the current
pulse/v6-releasebranch with accumulated post-RC7 changes without RC8, another soak, or additional current-branch validation before GA. - This is a bounded v6.0.0 release-owner risk acceptance, not validation evidence for the post-RC7 changes and not a standing policy for later stable releases.
- The release packet must describe the GA candidate honestly as the current branch after the RC line, keep rollback and v5 maintenance dates explicit, and retain the prior governed release-pipeline rehearsal evidence as automation lineage rather than claiming the post-RC7 changes were RC-tested.
- On 2026-07-02, after seven v6 release candidates, the release owner
explicitly approved promoting the current
- v6.1.0 release-cutoff exception:
- On 2026-07-22, the release owner ended the moving RC feedback loop and
declared current
mainthe v6.1.0 feature cutoff. The dated decision record isdocs/release-control/v6/internal/records/v6.1.0-stable-cutoff-owner-approval-2026-07-22.md. - v6.1.0 may publish stable without another RC publication or the normal 72-hour soak. This is an explicit owner-risk acceptance for this version, not reusable evidence and not a standing exception for later releases.
- The exact stable SHA must still pass the no-public-release
Release Dry Runand the normal single-build publication workflow. Only a security, data-loss, upgrade-breaking, startup-blocking, or release-pipeline defect may reopen the cutoff; ordinary findings move to v6.1.1. - After exact-SHA rehearsal
29927692302exposed unavailable external SignPath configuration, the release owner approved av6.1.0-only Windows Authenticode exception. The Windows artifacts must remain bound by the exact-SHA candidate manifest, checksums, detached.sig/.sshsigsignatures, and published digests, and the public notes must disclose the Unknown Publisher state. - On 2026-07-23, the release owner separately approved a
v6.1.1-only Windows Authenticode exception for the emergency patch addressing active customer update harm. This is a new, version-bound decision rather than a reuse of thev6.1.0exception. The same exact-SHA candidate, checksum, detached-signature, manifest, published-digest, owner-reason, and public Unknown Publisher disclosure controls remain mandatory. Stablev6.1.2and later restore the Authenticode requirement unless another explicit version-bound owner decision is recorded in policy. - Unproved self-service commercial transitions remain unavailable and unadvertised under the exposure-safety gate. This exception does not authorize enabling that feature or running a production billing proof.
- v6.2.0 release-cutoff exception:
- On 2026-08-09, the release owner declared current
mainatb9811cdf538224e7f2870718744300ef8f80afa0the v6.2.0 content cutoff and explicitly directed promotion fromv6.2.0-rc.11without completing the normal 72-hour soak. The dated decision record isdocs/release-control/v6/internal/records/v6.2.0-stable-cutoff-owner-approval-2026-08-09.md. - This is a bounded v6.2.0 owner-risk acceptance, not soak evidence and not
a standing exception for later releases. The workflow input
hotfix_exception=truetransports the approved waiver through the shared resolver; it does not reclassify v6.2.0 as a patch hotfix. - The final release-preparation commit may change only governed version,
release-note, qualification, test-guardrail, and release-control metadata.
The exact pushed SHA must pass the no-publication
Release Dry Runbefore the same SHA is dispatched through the single-build publication workflow. - Exact-SHA dry run
31306697834failed closed before candidate assembly or public mutation because the SignPathrelease-signingpolicy was invalid: itsRelease certificate 2026CSR remained pending. After that failure, the release owner separately approved av6.2.0-only unsigned-Windows exception. This signing exception is independent of the soak waiver and is not a standing decision for later releases. - The unsigned Windows artifacts remain bound by the exact-SHA candidate
manifest, checksums, detached
.sig/.sshsigsignatures, and published digests. Public notes must disclose that they are not Authenticode-signed and may display an Unknown Publisher warning. Stablev6.2.1and later restore mandatory Windows Authenticode unless another explicit, version-bound owner decision is recorded.
- v6.2.1 unsigned-Windows exception:
- On 2026-08-10, release run
31343128024failed closed before candidate assembly or public mutation because the SignPathrelease-signingpolicy remained invalid while itsRelease certificate 2026CSR was pending. The release owner then explicitly authorized unsigned Windows artifacts forv6.2.1. The dated decision record isdocs/release-control/v6/internal/records/v6.2.1-unsigned-windows-owner-approval-2026-08-10.md. - This is a bounded
v6.2.1decision, not a standing exception. Stablev6.2.2and later restore mandatory Authenticode unless another explicit, version-bound owner decision is recorded. - Windows artifacts remain bound by the exact-SHA candidate manifest,
checksums, detached
.sig/.sshsigsignatures, and published digests. Public notes must disclose that the binaries are not Authenticode-signed and may display an Unknown Publisher warning.
- v6.3.0 release-cutoff exception:
- On 2026-08-22, the release owner reviewed the privacy-safe production
telemetry posture for
v6.3.0-rc.5andv6.3.0-rc.6, declared currentmainat53ba9786c5522a6839f9cbd3d01c02402556f9ebthe v6.3.0 content cutoff, and explicitly directed stable promotion fromv6.3.0-rc.6without completing its normal 72-hour soak. The dated decision record isdocs/release-control/v6/internal/records/v6.3.0-stable-cutoff-owner-approval-2026-08-22.md. - This is a bounded v6.3.0 owner-risk acceptance, not soak evidence and not
a standing exception for later releases. It explicitly accepts the modest
telemetry cohort, the young
rc.6follow-up window, and the bounded runtime and release-path changes between the promoted tag and the cutoff. The workflow inputhotfix_exception=truetransports the approved waiver through the shared resolver; it does not reclassify v6.3.0 as a patch hotfix. - The final release-preparation commit may change only governed version,
release-note, qualification, test-guardrail, and release-control metadata.
The exact pushed SHA must pass the no-publication
Release Dry Runbefore the same SHA is dispatched through the single-build publication workflow. - This cutoff decision did not itself waive Windows signing. The release owner subsequently recorded a separate version-bound v6.3.0 unsigned-Windows decision; neither exception broadens the other.
- v6.3.0 unsigned-Windows exception:
- On 2026-08-22, the release owner explicitly authorized unsigned Windows
Unified Agent artifacts for stable
v6.3.0because Authenticode signing is not yet available for this release. The dated decision record isdocs/release-control/v6/internal/records/v6.3.0-unsigned-windows-owner-approval-2026-08-22.md. - This is a bounded
v6.3.0decision, not evidence that Authenticode succeeded and not a standing exception. Stablev6.3.1and later restore mandatory Authenticode unless another explicit, version-bound owner decision is recorded. - Windows artifacts remain bound by the exact release SHA, immutable
candidate manifest, SHA-256 checksums, detached
.sigand.sshsigsignatures, and published-digest verification. Public notes must disclose that the binaries are not Authenticode-signed and may display an Unknown Publisher warning.
- v6.3.1 unsigned-Windows exception:
- On 2026-08-23, the release owner explicitly authorized unsigned Windows
Unified Agent artifacts for stable
v6.3.1after exact-SHA rehearsal32634435531proved that the SignPath production certificate remainsCSR PENDINGand therelease-signingpolicy is invalid. The dated decision record isdocs/release-control/v6/internal/records/v6.3.1-unsigned-windows-owner-approval-2026-08-23.md. - This is a bounded
v6.3.1decision, not evidence that Authenticode succeeded and not a standing exception. Stablev6.3.2and later restore mandatory Authenticode unless another explicit, version-bound owner decision is recorded. - Windows artifacts remain bound by the exact release SHA, immutable
candidate manifest, SHA-256 checksums, detached
.sigand.sshsigsignatures, and published-digest verification. Public notes must disclose that the binaries are not Authenticode-signed and may display an Unknown Publisher warning.
- Windows Authenticode unavailable policy from v6.3.2:
- On 2026-08-25, release run
32896554952failed closed when the SignPath production submission returnedInvalid request to SignPath APIbefore a signing-request record was created. The release owner explicitly directed stable releases fromv6.3.2onward to skip Windows Authenticode while production credentials and certificate authorization remain unavailable. The dated decision record isdocs/release-control/v6/internal/records/windows-authenticode-unavailable-owner-policy-2026-08-25.md. - This standing unavailable state remains active until the release owner explicitly confirms that SignPath production credentials and certificate authorization are ready. New stable versions must not require per-version unsigned allowlist updates while this state is active. Restoring signing requires an explicit policy/code change; credential arrival alone must not silently change release behavior.
- Windows artifacts remain bound by the exact release SHA, immutable
candidate manifest, SHA-256 checksums, detached
.sigand.sshsigsignatures, and published-digest verification. Public notes must disclose that the binaries are not Authenticode-signed and may display an Unknown Publisher warning.
- v6.4.0 expedited stable-cutoff exception:
- On 2026-08-28, the release owner explicitly directed stable
v6.4.0publication from runtime cutoff18b22d1ebbfe542484652e419320fc7643a792f0, promoted from publishedv6.4.0-rc.12, without another public candidate or the remainder of the normal 72-hour soak. The dated decision record isdocs/release-control/v6/internal/records/v6.4.0-stable-cutoff-owner-approval-2026-08-28.md. - The accepted reason is active customer harm from incorrect same-name
Proxmox agent links, repeated inspection load on stopped-container-heavy
Docker hosts, incomplete Proxmox backup and TrueNAS SMART detail, and
unstable rolling metric history. The decision explicitly includes the
bounded product fixes after
v6.4.0-rc.12. - This is a version-bound owner-risk acceptance, not soak evidence and not
a standing exception for later releases. The workflow input
hotfix_exception=truetransports the approved waiver through the shared resolver and does not reclassify v6.4.0 as a patch hotfix. - The final release-preparation commit may change only governed version, release-note, qualification, test-guardrail, and release-control metadata. The integrated single-build workflow must pass its exact-SHA preflight and immutable readiness gates before any publication boundary. Under the current single-build policy, a separate Release Dry Run is optional.
- The standing Windows Authenticode-unavailable policy from v6.3.2 applies independently. It retains checksum, detached-signature, immutable-manifest, published-digest, and public Unknown Publisher disclosure controls.
Single-Build Release Path
- Every normal alpha, beta, RC, stable, and patch release is initiated once through
create-release.yml. The workflow builds one exact-SHA candidate with the native signing lanes required by that version's governed policy while frontend, backend, Docker, Helm, and integration checks run in parallel. The candidate build and required release-note visuals must pass before restricted draft assembly. The draft binds its intended version to the exact source SHA without creating a public Git tag. Candidate checks must finish before any public versioned artifact is written. - The release candidate is uploaded as a one-day Actions artifact with a machine-readable manifest that pins source SHA, version, filename, size, and SHA-256 for every release asset. Publication downloads and verifies that exact candidate; it must not rebuild release binaries or installers.
- Standard staged asset verification compares the candidate manifest with GitHub's server-side release-asset SHA-256 digests. It must not re-download the multi-gigabyte release packet merely to recompute hashes already proven before upload. Manual and release-edit repair validation may retain the full-download fallback when no same-run candidate manifest exists.
- Restricted draft asset verification and staged install smoke join container,
frontend, backend, integration and private Pro qualification in one
candidate predicate that every public writer (
publish_release_tag,publish_docker,publish_helm_chartandactivate_release) carries in its ownneedsandif. There is no echo-only join job. A failed, cancelled, or missing required check prevents public Git tags, versioned Docker images and Helm charts from being created. A draft-only run never crosses this boundary. Public versioned artifacts are publication, even before the GitHub release is announced. After candidate qualification, publish the exact Git tag without rewriting any existing identity, then publish and verify Docker and Helm artifacts.activate_releasejoins the tag and those verified public digests directly before activation, and the commit verdict restates every candidate result. A draft with no exposed tag or versioned artifacts may be repaired under its intended version. An already exposed version must retain its source identity, even if its GitHub release remains a draft. Publication failures after first exposure require exact-source recovery or an explicitly explained successor, not silent replacement. Cross-registry publication is not atomic. The pipeline must durably dispatch a viable release convergence run before publication. After readiness,activate_releasestagesrelease-activation.jsonin the draft, verifies its server-side SHA-256 digest, and rechecks repository release immutability. It then publishes the complete release, including the marker, immutably. Immutable publication is the irreversible release commit point. A marker in an unpublished draft is not a committed release and cannot authorise customer promotion. Public read-back of checksums, installer, provider-MSP bundle, canonical Linux archives and the activation marker follows the commit. A failed read-back or final verdict remains visible debt and must never return an immutable release to draft or claim rollback. Recovery verifies the exact existing release and marker before resuming delivery. - Mutable Docker aliases, the live paid-runtime broker, the additive public
Helm Pages index, and stable demo deployment belong to the separately visible Release
Convergence run after the commit point. A global repository-ref lease must
serialize those surfaces across every release version while exact-version
staging remains version-parallel. Under the lease, every committed release
must merge its chart into Helm Pages. If a newer committed activation marker
exists, the superseded run must skip only Docker aliases, the paid-runtime
broker, and the stable demo rather than move those targets backward.
Any surface failure leaves the GitHub release committed, fails the convergence
verdict, releases or stale-recovers the lease, and re-runs the complete
idempotent convergence workflow. It must not fail a so-called definitive
release verdict or return the committed release to draft.
The three reusable mutation workflows expose
workflow_callonly; direct dispatch of aliases, Pages, or demo deployment would bypass the lease and is prohibited. Non-mutating demo verification remains part of Release Dry Run. The activation marker keeps the original convergence owner immutable. After that owner completes, a fresh workflow dispatch from repairedmainmay adopt the same exact release, source run, target commit, release ID, and R2 lineage. The owner record lives inside the exact lease commit, retained by a unique evidence tag named with the convergence run ID and attempt. The lease and evidence refs are created atomically. Every child receives that exact lease SHA, record name and digest. Recovery must not append assets to the immutable public release or clobber a constant owner record that could authorize the prior owner. Release Dry Runremains the no-public-release rehearsal surface. It calls the same candidate builder and no-mutation demo verification, but a separate dry run is not required before a normal release because the single publish workflow performs the exact-SHA preflight before crossing the publication boundary.
Stable Patch Path
The release train schedules no patch releases, and an important fix ships
through an early cut from main (see Release Train). The release workflow
still supports a stable patch; when one is published, these rules apply.
- A stable patch may omit a same-version RC only when all of these are
true:
- the rollback target is the latest preceding stable tag and the candidate descends from it;
- no same-version RC tag already exists;
- the diff does not touch authentication/authorization/tenant isolation, licensing/entitlement/billing authority, persisted data/schema/migration, relay/mobile trust protocol, or installer/updater/rollback execution;
- the canonical stable release-notes packet exists;
- the mobile-impact gate either proves no mobile-facing change or records current candidate evidence; and
- the integrated exact-SHA candidate build and release checks pass before the workflow creates or publishes the release.
scripts/trigger-stable-patch.shis the operator entrypoint. Run it once without--dry-run; it derives rollback and release notes, refuses local-only or dirty state, and supplies workflow metadata without interactive prompts.--dry-runis optional and exists only for an explicit no-public-release rehearsal.- Creating a same-version RC or touching an RC-required path moves the patch onto the RC promotion path. The resolver enforces that boundary. Do not use the patch helper to relabel a risky patch as low-risk.
--emergency-hotfix-reasonis the narrow escape hatch for active customer harm. It does not remove the integrated exact-SHA candidate and release checks, and the reason is recorded in the release metadata. A version-bound unsigned Windows decision must additionally be supplied through--unsigned-windows-exception-reason; it never follows implicitly from emergency patch status.- The release workflow must await every immutable readiness gate, durably
enqueue the exact convergence run, and verify the public activation marker.
Release Activation Commit Verdictis the release result. Docker aliases, stable demo deployment and browser proof, Helm Pages, and private Pro live promotion are post-commit convergence outcomes in the linked workflow run. They remain blocking convergence debt until green, but their failure must not misreport the committed GitHub release as an atomic rollback.
Rollout Rules
- Default installs stay on
stable. - Broad customer announcements and unattended updates target
stableonly. - Preview enrollment must be explicit and reversible. The persisted and API
wire value remains
rcuntil a separately governed compatibility migration. - Paid production tenants should remain on
stableunless they are knowingly participating in preview validation.
Rollback Rules
- Never delete or rewrite shipped tags to hide a bad release; supersede them with a newer release and explicit guidance.
- If a prerelease is bad, hold it in the Preview channel, fix forward, and cut the next prerelease. Do not promote it.
- If a stable release is bad:
- Pause further promotion or auto-update exposure.
- Direct affected users to the prior stable pin.
- Cut and validate a hotfix or rollback release.
- The previous stable version must remain installable by exact version pin until the replacement stable release is trusted.
Required Release Artifacts
- Release notes.
- Rollback target version and exact pin command.
- Checklist evidence and gate status.
- Staging or internal validation note.
- v5 maintenance-only support policy and end-of-support note for the GA cutover.
- Exact v6 GA and v5 end-of-support dates locked before GA publish and then published in the GA release notes.
- Prerelease-to-GA rehearsal record plus the machine-generated
rc-to-ga-rehearsal-summaryartifact, including the GitHub Actions run URL for the non-publish dry run and the canonical promotion metadata envelope: candidate stable tag, promotion channel, promoted prerelease tag, rollback target, exact rollback command, planned GA date, and planned v5 end-of-support date. Materialize that dated record withpython3 scripts/release_control/record_rc_to_ga_rehearsal.py --run-id <run-id>unless an explicitly different output path is needed. - The pushed governed release-branch copy of
.github/workflows/release-dry-run.ymlmust already accept that stable rehearsal metadata envelope throughworkflow_dispatch, and the local release branch must matchoriginbefore dispatch, because GitHub executes the selected remote ref and does not see local-only governance state. - For v6 GA, the exact self-hosted public forward and rollback packet must be
locked in the launch ticket before promotion: preview deploy/audit commands,
production deploy/audit commands, and the explicit rollback deploy/audit
commands that return
pulserelay.proto the approved v5 posture. Preview proof, readiness records, and internal target completion do not authorize the production public checkout flip by themselves; until the owner-approved GA packet is actively executed, production public checkout remainsPULSE_PUBLIC_RELEASE_TRACK=v5withPULSE_V6_RELEASE_APPROVED=0. - For v6 GA, attach the dated RC issue-closure record for the candidate so the final issue set and its dispositions are explicit in the promotion packet rather than implied.
- Attach the sanitized historical-credential containment closure packet. Every declared Pulse and Pulse Pro redacted subject must have typed provider/control-plane closure plus replacement-deployment or verified-retirement evidence at the governed minimum tier. A raw gate status, narrative approval, current-value difference, or optional history rewrite cannot substitute for those records.
Authority
If conflicts appear:
SOURCE_OF_TRUTH.mdowns the locked decision that this policy is mandatory.status.jsonowns whether the decision is open or resolved and whether the active target is release-ready.PRE_RELEASE_CHECKLIST.mdandHIGH_RISK_RELEASE_VERIFICATION_MATRIX.mdown execution proof for a specific promotion.