Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
API Runtime Decomposition Qualification Record
- Date:
2026-08-21 - Subsystem:
api-contracts - Baseline commit:
9dac68fd6 - Boundary commit:
b70a658c8992158b8d0f8a6408053afa2915a8d7 - Result: production decomposition and chart/resource PVE acceleration passed
Production Boundaries
The former single internal/api compilation and test unit now delegates to
production packages with one-way dependencies:
internal/api/alertingowns alert lifecycle, notification management, queue/DLQ behavior, monitor adapters, and their tests.internal/api/configapiowns configuration, node lifecycle, discovery, setup-script, auto-registration, export/import, and enrollment handlers with their tests.internal/api/agenttokensowns install-token scope, owner binding, metadata, issuance, rollback, and persistence policy.internal/api/agentbindingowns immutable install-token command-channel binding policy.internal/api/apicontextandinternal/api/apihttpown the shared tenant and HTTP scope/error primitives used by extracted domains.
Root retains router composition, cross-domain integration proof, and source-compatible aliases/delegates. Extracted packages do not import root. The final ownership audit removed the last duplicate install-token and Proxmox command implementations from root, leaving the extracted packages canonical.
The root package changed from 633 to 587 Go files and from 4,021 to 3,742 top-level tests. A total of 279 existing tests moved with their production domains; four focused security-boundary tests were added. No test was skipped, rerouted, or weakened.
Measurement Method
Both hosts used uncached test execution after a compile-only warm-up and asset verification:
bash scripts/ensure_test_assets.sh
go test -run '^$' ./internal/api/...
/usr/bin/time -lp sh -c 'go test -json -count=1 ./internal/api/... > api-timing.json'
# GNU time on PVE:
/usr/bin/time -v -o api-timing.time go test -json -count=1 ./internal/api/... > api-timing.json
The local host was Darwin arm64, Go 1.26.7, with 10 logical CPUs. The PVE host
was Linux amd64, Go 1.26.5, with 8 vCPUs. PVE received committed git bundles in
/tmp/pulse-api-decomposition.kZB9Hb; tests ran from a detached temporary
clone. The primary /srv/pulse/pulse checkout was not modified.
Timing Evidence
| Host and revision | Wall | User | System | Average cores | Capacity used | Maximum RSS | Result |
|---|---|---|---|---|---|---|---|
Local monolith 9dac68fd6 |
241.64s | 237.74s | 62.05s | 1.241 | 12.41% of 10 | 2,725,707,776 B | 7,301 pass events |
Local boundaries b70a658c8 |
153.96s | 177.78s | 43.18s | 1.435 | 14.35% of 10 | 3,097,395,200 B | 7,305 pass events |
PVE monolith 9dac68fd6, sample 1 |
251.14s | 259.90s | 40.71s | 1.197 | 14.96% of 8 | 4,480,836 KiB | pass |
PVE monolith 9dac68fd6, reverse-order repeat |
258.87s | 261.38s | 44.30s | 1.181 | 14.76% of 8 | 4,377,360 KiB | pass |
PVE boundaries b70a658c8 |
268.57s | 272.21s | 45.12s | 1.181 | 14.76% of 8 | 4,473,448 KiB | 7,305 pass events |
The local boundary run was 87.68 seconds (36.28%) faster than its monolithic baseline. PVE did not reproduce that gain: the final sample was 9.70 to 17.43 seconds slower than the two monolithic samples. This is a qualification miss, not an accepted variance waiver.
PVE package timing explains the result:
| Package | Concurrent full run | Isolated control |
|---|---|---|
internal/api |
267.067s | 249.38s wall (245.345s package at 25f20f6ee) |
internal/api/configapi |
36.820s | not required |
internal/api/alerting |
0.261s | not required |
internal/api/agentbinding |
0.013s | not required |
internal/api/agenttokens |
0.013s | not required |
The scheduler overlapped the complete extracted package workloads, but the root test binary slowed by about 18 seconds under concurrent filesystem and CPU pressure. That contention consumes the current architectural gain on this worker.
Qualification Evidence
go test -json -count=1 ./internal/api/...: 7,305 pass events, zero test or package failures, 153.96 seconds locally atb70a658c8.go test -race -timeout 20m -count=1 ./internal/api/...: passed every package with no race report or panic atb70a658c8; 811.93 seconds wall, 872.47 seconds user, 144.59 seconds system, and 3,382,788,096 bytes maximum RSS. Package elapsed times were 806.736 seconds for root and 107.852 seconds forconfigapi.- Release-control registry, contract, status, and control-plane audits passed with zero errors and zero warnings after this record was added.
Remaining Critical-Path Coupling
The residual root imports more than 70 internal runtime packages. Its PVE critical path is dominated by chart/mock projection and high-scale resource/router integration tests, including:
TestContract_MockChartRoutesUseCanonicalMockUnifiedReadStateForVMwareHostsTestHandleCharts_UsesCanonicalMockUnifiedReadStateForVMwareHostsTestLoad_500Node_ConcurrentResourcesTestLoad_500Node_MixedEndpoints
At that boundary revision, chart handlers and response builders still spanned
internal/api/router.go and internal/api/types.go; the resource query path
still shared one ResourceHandlers type with action lifecycle and
operator-state mutation.
Moving only the expensive tests, copying list filters into a new package, or
wrapping root behavior in callbacks would create an artificial boundary and is
not acceptable. The next decomposition must separate the production chart and
resource-query services, give each a lower-level monitor/registry interface,
move their full contract/load tests with them, and leave root with route
composition and cross-domain proof only.
Chart and Resource Query Continuation
The continuation was mapped from 418402bf9eeb4ddb5a2f437ac9b93290bc96f103,
then rebased onto the corrected release selector at
1327dddad5200f07271e16abdf4dd83fa1f2eb4f. Implementation commit
2e4bd36ec5fd0121a2a4cc3564be89eeb9d5c750 completed the two production
boundaries identified above:
internal/api/chartapiowns all six chart handlers, monitor history queries, aggregation/downsampling, response contracts, per-tenant response caches, singleflight coordination, and the chart handler/contract suite.internal/api/resourceapiowns registry construction, tenant stores, unified seed ingestion, list/detail/facet/timeline queries, discovery and metrics projections, response contracts, and the 500-node resource load proof.- Root Router and
ResourceHandlersretain source-compatible delegates and type aliases. Root continues to own route authorization, action lifecycle, operator-state mutation, and cross-domain integration proof. Neither domain package imports root or delegates behavior back through generic callbacks.
The root package changed from 587 to 581 Go files and from 3,755 to 3,645
top-level tests. Exactly 110 existing test/benchmark entry points moved with
their production domains: 35 to chartapi and 75 to resourceapi. The moved
resource set includes TestLoad_500Node_ConcurrentResources; the moved chart
set includes 17 end-to-end handler tests that previously ran serially in the
root test binary.
The exact local warm correctness run used the same command form as the earlier record:
/usr/bin/time -lp sh -c 'go test -count=1 ./internal/api/...'
It passed in 118.77s wall, 177.00s user, and 30.73s system with
3,455,729,664 bytes maximum RSS. Average CPU occupancy was 1.749 cores
(17.49% of the 10-logical-CPU local host). Concurrent package elapsed times
were 114.725s root, 96.313s config, 22.665s chart, and 8.971s
resource. The prior recorded local boundary run was 153.96s; because the
continuation baseline also includes later mainline release fixes, that
35.19s difference is supporting evidence rather than the controlled PVE
before/after result.
Full race qualification passed with no detector report or panic:
/usr/bin/time -lp sh -c 'go test -race -timeout 20m -count=1 ./internal/api/...'
The race run used 667.59s wall, 885.43s user, 105.78s system, and
3,728,080,896 bytes maximum RSS. Package elapsed times were 649.623s root,
123.379s chart, 104.904s config, and 14.749s resource.
A static equivalence audit extracted every top-level Test, Benchmark, and
Example function name from the continuation baseline and the completed tree.
Both sets contain 4,038 unique names; the set difference is zero in both
directions. This complements executable contract qualification by proving the
package move did not rename, delete, or replace any existing test entry point.
Controlled PVE release qualification
The final comparison ran on pulse-dev, Linux amd64 with Go 1.26.5 and 8
vCPUs. Exact committed bundles were checked out detached beneath
/tmp/pulse-api-chart-resource.vxQAJx; no primary checkout or runner service
was modified. Both measured revisions used warmed race build and test caches,
a fresh isolated data-root value, and the same fixed two-shard release plan:
/usr/bin/time -v -o baseline-steady.time \
./scripts/run-release-backend-tests.sh \
--data-root /tmp/pulse-api-chart-resource.vxQAJx/data-baseline-steady \
--api-shards 2
/usr/bin/time -v -o after.time \
./scripts/run-release-backend-tests.sh \
--data-root /tmp/pulse-api-chart-resource.vxQAJx/data-after-fresh \
--api-shards 2
The explicit shard count removes a discovered environmental confound: the
first baseline saw 11,116 MiB available and auto-selected two shards, while an
immediate split attempt saw 9,591 MiB and auto-selected one. That one-shard
attempt was terminated and excluded. A subsequent matched attempt was also
excluded after its reused data-root exposed an asymmetric resourceapi test
cache hit. The recorded pair is steady-state warm on both sides, used distinct
fresh data-root values, saw 10,392 and 10,377 MiB available respectively, and
produced the same two shards with one exact-name batch per shard.
| Warm release gate | Wall | User | System | Average cores | 8-vCPU capacity | Maximum RSS | Result |
|---|---|---|---|---|---|---|---|
Baseline 1327dddad |
13:46.65 | 1,545.57s | 148.79s | 2.050 | 25.62% | 6,381,264 KiB | pass |
Chart/resource split 2e4bd36ec |
11:16.05 | 1,369.46s | 138.27s | 2.230 | 27.88% | 6,526,072 KiB | pass |
The production split reduced the warm release wall time by 150.60 seconds
(18.22%) and total CPU time by 186.63 seconds (11.01%). Average occupancy rose
from 2.050 to 2.230 cores, or 2.26 percentage points of worker capacity. Peak
RSS increased by 144,808 KiB (2.27%). Both release runs completed with two API
PASS results, no race report, and the terminal
Race-enabled backend release tests passed with 2 API shard(s). marker.
The split release log reports native warm package results for both
internal/api/chartapi and internal/api/resourceapi; the uncached local race
run above remains the execution proof for every moved test. Live checkpoints
also showed the shorter root shard finishing near 5m13s after the split versus
about 7m in the steady baseline. The remaining root shard therefore remains
the release critical path even though the architectural cut materially reduced
it.
Preserved local evidence files and checksums:
/tmp/pulse-api-next-cut.Cxp7CT/baseline-steady.time:d6673f5a0f06a076e8fc661695b813129a831c5900eaf6d0bd74a122b6363f11/tmp/pulse-api-next-cut.Cxp7CT/baseline-steady.log:1e83269680567e1d92e361cfde26414e6bc6a815f44710a0353b94dfaeac3784/tmp/pulse-api-next-cut.Cxp7CT/after.time:c9570f253460e360432bacd9803b23f703a73baa93929d6cfce06c65dfce4f71/tmp/pulse-api-next-cut.Cxp7CT/after.log:5a8dfa99f184514467669990dd667e22507a04602809d2a1d48895c897964c00
After the measurements, the worker had no matching release-backend, API race, or Docker build process. The temporary remote files and logs were preserved.
Exact RC.6 Release Timing
Release run 32514803052
published and converged exact source commit
779f9a10bc342fcbe66ee1b26493f1fa10355a06 as v6.3.0-rc.6.
The release remained a draft until every immutable gate passed, and the public
activation marker binds the tag, release id, source run, convergence run, and
private R2 prefix.
Boundary from 18:43:31Z dispatch |
UTC | Elapsed | Result |
|---|---|---|---|
| Exact-SHA public compilation complete | 18:47:07Z |
3:36 | pass |
| Private Pro child complete | 18:52:37Z |
9:06 | pass |
| GitHub release published | 18:57:14Z |
13:43 | pass |
| Source activation workflow complete | 18:57:32Z |
14:01 | pass |
| Customer convergence verdict | 18:59:14Z |
15:43 | pass |
| Promotion lease cleanup / convergence workflow complete | 18:59:27Z |
15:56 | pass |
Publication met the 15-minute objective, but definitive customer convergence
missed it by 43 seconds. The acceleration objective therefore remained open.
The exact backend log started with 14,858 MiB available and no admission wait.
Its two 1,813-test shards began together at 18:45:19Z, passed at
18:50:28Z and 18:56:47Z, and completed the backend gate at 18:56:48Z.
The 5:08 versus 11:27 split proves that equal test counts are not an adequate
cost model for this ordered package.
An unchanged exact-SHA three-equal-shard calibration passed every race test but still took 706.36 seconds because the final third retained the long tail. Deterministic contiguous bisection then established that tests 1,814–2,720 take 69 seconds, 2,721–3,173 take 49 seconds, 3,174–3,400 take 9 seconds, and 3,401–3,513 take 12 seconds when isolated. The remaining cost is the repeated integration-server setup in the final 113 tests. The canonical three-shard plan therefore keeps the 3,595-test fast prefix in one compressed expression and divides the last 31 integration tests at named, fail-closed boundaries.
The two isolated hot-tail boundary proofs passed in 189 and 290 seconds. The final canonical PVE qualification then exercised the patched auto-selected release command against the unchanged RC.6 source with all 3,626 API tests and all 155 non-API packages. Admission selected three shards from eight vCPUs at 16,399 MiB available, recorded exact shard sizes of 3,595, 15, and 16 in the manifest, and kept every shard in one compressed test-binary invocation. The three shards passed in 591, 320, and 434 seconds respectively, and the complete race-enabled backend gate passed in 639.57 seconds. This is a conservative full-worker result: the package graph and API shards ran concurrently, rather than timing the API partitions in isolation. Together with early inert convergence dispatch, it removes more than the 43-second RC.6 convergence miss without weakening exact-SHA, signing, integrity, installer-smoke, publication, or convergence requirements.