Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
Proxmox guest lifecycle Patrol loop — 2026-07-13
Outcome
Pulse now has a production Patrol detector-to-verified-fix path for Proxmox VM
and LXC lifecycle incidents. A fresh running-to-stopped transition creates a
bounded reliability finding only when the stopped resource advertises its exact
governed start capability. The normal shared action lifecycle then plans,
asks for approval, dispatches through the owning node agent, records the audit,
and reconciles the finding from canonical verification truth.
Safety floor
- First observations seed a baseline; guests already stopped at startup do not become incidents.
- Stale, missing, repeated-clock, unknown, template, locked, and capability-less observations do not emit or clear findings.
- VM and LXC routes require their exact resource-owned lifecycle handlers.
- Finding evidence contains only bounded Proxmox identity/state facts and no command, path, credential, token, or raw provider output.
- Execution success stays separate from postcondition truth.
fix_verifiedrequires a confirmed independent Proxmox control-plane observation.
Proof
internal/ai/findings_proxmox_lifecycle_test.goproves VM/LXC transitions, baseline behavior, freshness/capability/guest guardrails, recovery/removal, and production Patrol wiring before the provider gate.internal/unifiedresources/views_test.goproves detached lifecycle capabilities and canonical per-source freshness on VM/LXC typed views.internal/api/proxmox_patrol_integration_test.goproves the full finding, exactstart {}proposal, human decision,qm startdispatch, independent Proxmox API verification, durable action audit, terminal notification, and originating finding reconciliation tofix_verified.
Residual
This closes the missing Proxmox lifecycle detector floor within the broader
Monitor-First Patrol Workbench candidate. It does not claim that whole candidate
lane complete. Mobile approval presentation and decision/execution parity
remain governed separately by lane-followup:mobile-post-rc-hardening.