Prerelease-to-GA Promotion Readiness Blocked Record

  • Date: 2026-03-26
  • Gate: rc-to-ga-promotion-readiness
  • Result: blocked

Blocking Facts

  1. No Pulse v6 prerelease has shipped yet.
  2. The repository contains accidental prerelease git tag history (v6.0.0-rc.1), but those tags were never published and do not count as shipped prerelease lineage.
  3. The selected remote ref origin/pulse/v6-release is still behind the current local governed branch state, so Release Dry Run would exercise stale remote control-plane metadata instead of the intended candidate.
  4. The governed release profile in docs/release-control/control_plane.json currently declares both prerelease_branch and stable_branch as pulse/v6-release.
  5. The active control-plane target is still v6-rc-stabilization, not v6-ga-promotion.
  6. The active local pulse/v6-release branch currently reports VERSION=6.0.0-rc.1, so the working line is still prerelease and there is not yet a governed local stable 6.0.0 candidate.
  7. There is still no governed Prerelease-to-GA Rehearsal Record proving a successful non-publish Release Dry Run for the eventual stable 6.0.0 candidate.
  8. docs/releases/RELEASE_NOTES_v6.md and docs/release-control/v6/internal/V5_MAINTENANCE_SUPPORT_POLICY.md still leave the GA announcement dates as placeholders because no real prerelease lineage or GA-ready rehearsal has locked them yet:
    • v6 GA date placeholder: [v6-ga-date]
    • v5 end-of-support placeholder: [v5-eos-date]
  9. There is still no governed Release Dry Run artifact or rehearsal record exercising stable inputs for:
    • version=6.0.0
    • no governed promoted_from_tag exists yet because no prerelease has shipped
    • the artifact-owned candidate stable tag for that rehearsal
    • the artifact-owned promotion channel for that rehearsal
    • the artifact-owned promoted prerelease tag for that rehearsal
    • the artifact-owned rollback target for that stable candidate
    • no exact ga_date is locked yet because the GA notice is still pending
    • no exact v5_eos_date is locked yet because the GA notice is still pending
    • an explicit rollback_version
    • the exact derived rollback command that artifact will publish

Why The Gate Cannot Be Cleared Yet

The blocker is no longer missing governance text. The remaining problem is that the control plane still treats v6 as the prerelease-stabilization line, the working version is still prerelease (6.0.0-rc.1), and there is still no exercised Release Dry Run record proving the eventual stable 6.0.0 candidate is ready for GA-style promotion. Until that rehearsal exists, stable users would still be the first real cohort for the final promotion path.

Required Unblock Steps

  1. Promote the active target from v6-rc-stabilization to v6-ga-promotion only when that change is actually intended.
  2. Push the governed pulse/v6-release branch state that is intended to become the stable 6.0.0 candidate, including the eventual VERSION=6.0.0 change and release-control records, to origin/pulse/v6-release.
  3. Ship the first real prerelease through the governed prerelease release path and record its exact published prerelease tag plus rollback target and exact derived rollback command.
  4. Run Release Dry Run from pulse/v6-release using that published prerelease as promoted_from_tag with:
    • version=6.0.0
    • an artifact-owned candidate stable tag matching that rehearsal
    • an artifact-owned promotion channel matching that rehearsal
    • an artifact-owned promoted prerelease tag matching that rehearsal
    • an artifact-owned rollback target for the stable candidate
    • the exact planned GA and v5 end-of-support dates for the publish notice
    • an explicit ga_date chosen for that rehearsal
    • an explicit stable rollback_version
    • the exact derived rollback command that artifact will publish
    • an explicit v5_eos_date chosen for that rehearsal
  5. Capture the rc-to-ga-rehearsal-summary artifact and run URL.
  6. Materialize the final rehearsal record from that artifact without hand-repairing any missing candidate tag, promoted prerelease tag, rollback target, rollback command, or GA/EOS metadata.
  7. Change the gate from blocked only if the rehearsal passes and the rollout inputs remain explicit.