Skip to content

armgit / Pulse

Public Imported from GitHub
0

Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.

2.6 KB
Raw Blame

Self-Hosted Commercial GA Coherence Blocked Record

  • Date: 2026-04-20
  • Gate: self-hosted-commercial-ga-coherence
  • Result: blocked

Blocking Facts

  1. The active control-plane target is still v6-rc-stabilization, and the live release profile still describes the current posture as an RC floor rather than a GA-ready self-hosted commercial package.
  2. repos/pulse-pro/landing-page/README.md still states that the live public site intentionally mirrors the current v5 marketing posture and that the public v6 landing package must be reintroduced explicitly later.
  3. repos/pulse-pro/V6_LAUNCH_CHECKLIST.md still records the dedicated public v6 landing surfaces, self-hosted v6 public checkout rehearsal, and broader GA-facing cutover work as incomplete.
  4. repos/pulse-pro/landing-page/index.html still carries both v5 and v6 pricing models, with the current live posture intentionally remaining on the v5 track while the v6 model is retained as preview data.
  5. The governed commercial lane (L2) had previously been treated as complete at the RC floor even though GA still lacks a named self-hosted commercial package pass covering the public site, explicit in-app commercial handoff, checkout/account/license-management flow, and GA-facing guidance together.

Why The Gate Cannot Be Cleared Yet

The current bridge posture is acceptable for prerelease stabilization, but it is not acceptable for GA. GA would otherwise expose a self-hosted commercial path that still reads as transitional: live v5-style public framing, preview v6 packaging, and incomplete GA-facing cutover guidance. That is exactly the kind of "broken setup" that creates customer confusion even when the runtime itself is technically working.

Required Unblock Steps

  1. Re-author the self-hosted GA commercial package so the public landing story, pricing presentation, and product promise all describe the actual v6 Community / Relay / Pro offer instead of a v5 live bridge plus v6 preview.
  2. Exercise the GA candidate through the real externally reachable self-hosted commercial path:
    • public landing
    • in-app upgrade or trial CTA
    • checkout/account/license-management flow
    • GA-facing guidance or release communication surface
  3. Record a dated real-browser rehearsal showing that those surfaces stay coherent end-to-end and do not fall back to legacy v5 framing or ambiguous plan definitions.
  4. Change the gate from blocked only after that rehearsal exists and the resulting package still matches the governed self-hosted pricing and product model.