Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
Go aialertsdashboarddockerdocker-monitoringgohomelabinfrastructure-monitoringkubernetesmonitoringmspproxmoxproxmox-backup-serverproxmox-mail-gatewayproxmox-veself-hostedtruenastypescriptvspherewebhooks
Clear v6 prerelease-to-GA promotion gate
rcourtman0c47b2ada1d4
diff --git a/docs/release-control/control_plane.json b/docs/release-control/control_plane.jsonindex 65b2c8c678..980c08cfb7 100644--- a/docs/release-control/control_plane.json+++ b/docs/release-control/control_plane.json@@ -6,7 +6,7 @@"control_plane_doc": "docs/release-control/internal/CONTROL_PLANE.md","control_plane_schema": "docs/release-control/control_plane.schema.json","active_profile_id": "v6",- "active_target_id": "v6-ga-promotion",+ "active_target_id": "v6-product-lane-expansion","legacy_release_lines": [{"version_prefix": "5.1.",@@ -54,7 +54,7 @@"id": "v6-ga-promotion","profile_id": "v6","kind": "release",- "status": "active",+ "status": "completed","summary": "Promote Pulse v6 from a validated, actually shipped RC to governed GA with exercised promotion proof, rollback clarity, and only GA-blocking decisions remaining.","completion_rule": "release_ready"},@@ -62,7 +62,7 @@"id": "v6-product-lane-expansion","profile_id": "v6","kind": "feature",- "status": "planned",+ "status": "active","summary": "Promote policy-aware data governance, resource-change intelligence, action-governance, and fleet-governance gaps only after the monitoring-first RC target is satisfied and the broader surfaced product case is proven.","completion_rule": "manual","proof_scope": "none"diff --git a/docs/release-control/internal/CONTROL_PLANE.md b/docs/release-control/internal/CONTROL_PLANE.mdindex 2ccce6aa54..1757df6221 100644--- a/docs/release-control/internal/CONTROL_PLANE.md+++ b/docs/release-control/internal/CONTROL_PLANE.md@@ -236,18 +236,16 @@ user language should update the control plane.## Current State1. v6 is the current active release profile.-2. `v6-ga-promotion` is the current active engineering target.- It is the governed release-promotion target, so default slice selection- should stay centered on the remaining GA blockers, exercised promotion- proof, rollback clarity, and explicit launch-day inputs rather than broader- control-plane expansion.-3. `v6-product-lane-expansion` remains planned and is still blocked on the- broader surfaced product case being proven.- Its candidate-lane surface remains available in `available_candidate_lane_queue`- plus the linked `candidate_lanes` and `coverage_gaps`.-4. `v6-ga-promotion` is now active because the shipped RC line has cleared the- stabilization floor and the remaining work is explicitly about governed GA- promotion proof.+2. `v6-product-lane-expansion` is the current active engineering target.+ The GA-promotion target is now complete, so default slice selection should+ move back to the highest-impact governed lane and coverage-gap work rather+ than staying pinned to release-promotion proof.+3. Its candidate-lane surface remains available in+ `available_candidate_lane_queue` plus the linked `candidate_lanes` and+ `coverage_gaps`.+4. `v6-ga-promotion` is completed because the shipped RC line reached+ `release_ready` with exercised prerelease-to-GA promotion proof, rollback+ clarity, and the written v5 maintenance-only policy in place.5. `v6-rc-stabilization` is completed after the shipped RCs established thecurrent monitored-first floor and the active objective moved to stablepromotion.diff --git a/docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.md b/docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.mdindex 1f628f0b9b..fb59983cd8 100644--- a/docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.md+++ b/docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.md@@ -355,8 +355,8 @@ Companion drill:maintenance policy plus exact end-of-support date, with a linked rehearsalrun URL and dry-run artifact carrying the full canonical promotion metadataenvelope.-- Current blocked record:- `docs/release-control/v6/records/rc-to-ga-promotion-readiness-blocked-2026-03-13.md`+- Latest exercised record:+ `docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.md`- Block release if:Stable users would become the first real validation cohort, the rollbacktarget is unclear, or the v5 maintenance-only policy is still undecided.diff --git a/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md b/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.mdindex c2fdbf365b..e4895f96e1 100644--- a/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md+++ b/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md@@ -22,26 +22,28 @@ Use this as the final gate before cutting a Pulse v6 pre-release.- The active target is now `v6-ga-promotion`, so the remaining release-readywork is explicitly about stable promotion proof rather than RC-floorstabilization.-- The remaining release-ready blocker is `rc-to-ga-promotion-readiness`, which- stays blocked until a later stable `6.0.0` candidate completes a matching- `Release Dry Run` rehearsal with the canonical promotion artifact envelope:- candidate stable tag, promotion channel, promoted prerelease tag, rollback target,+- `rc-to-ga-promotion-readiness` was cleared on 2026-04-20 by `Release Dry Run`+ run `24673393628`, recorded at+ `docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.md`.+- The stable `6.0.0` candidate now has an exercised non-publish promotion+ rehearsal carrying the canonical promotion artifact envelope: candidate+ stable tag, promotion channel, promoted prerelease tag, rollback target,exact rollback command, exact GA date, and exact v5 end-of-support inputs.- Mobile is in scope for the release and now has targeted readiness coverage in `pulse-mobile`.- High-risk release confidence now lives in `docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.md` and should be cleared alongside this checklist.## Promotion Policy-- [ ] Record the previous stable tag and exact rollback pin command before publishing a new prerelease or stable release.+- [x] Record the previous stable tag and exact rollback pin command before publishing a new prerelease or stable release.- [ ] For the GA/stable candidate, confirm the release pipeline has already been exercised on a real prerelease tag, not only linted or YAML-parsed.-- [ ] For stable promotion, confirm the candidate commit has already shipped on `rc`.-- [ ] For stable promotion, confirm the chosen `promoted_from_tag` is a prerelease that was actually published through the governed prerelease path, not an accidental git tag.-- [ ] For stable promotion, confirm the prerelease soak window is at least 72 hours or document the hotfix exception explicitly.+- [x] For stable promotion, confirm the candidate commit has already shipped on `rc`.+- [x] For stable promotion, confirm the chosen `promoted_from_tag` is a prerelease that was actually published through the governed prerelease path, not an accidental git tag.+- [x] For stable promotion, confirm the prerelease soak window is at least 72 hours or document the hotfix exception explicitly.- [ ] For stable promotion, confirm paid production tenants are not being moved onto an unvalidated build.-- [ ] For GA/stable promotion, confirm `V5_MAINTENANCE_SUPPORT_POLICY.md` is still the intended policy and replace any placeholder GA notice dates with the exact v6 GA date and exact v5 end-of-support date that will ship with the announcement.-- [ ] For GA/stable promotion, confirm the pushed governed release-branch copy of `.github/workflows/release-dry-run.yml` already accepts the governed stable rehearsal metadata envelope (`promoted_from_tag`, `rollback_version`, `ga_date`, `v5_eos_date`) through `workflow_dispatch`, because GitHub executes the selected remote ref and does not see local-only governance state.-- [ ] For GA/stable promotion, confirm the local rehearsal branch exactly matches `origin` before dispatching `Release Dry Run`, so the run exercises the intended governed branch state instead of stale remote control-plane metadata.+- [x] For GA/stable promotion, confirm `V5_MAINTENANCE_SUPPORT_POLICY.md` is still the intended policy and replace any placeholder GA notice dates with the exact v6 GA date and exact v5 end-of-support date that will ship with the announcement.+- [x] For GA/stable promotion, confirm the pushed governed release-branch copy of `.github/workflows/release-dry-run.yml` already accepts the governed stable rehearsal metadata envelope (`promoted_from_tag`, `rollback_version`, `ga_date`, `v5_eos_date`) through `workflow_dispatch`, because GitHub executes the selected remote ref and does not see local-only governance state.+- [x] For GA/stable promotion, confirm the local rehearsal branch exactly matches `origin` before dispatching `Release Dry Run`, so the run exercises the intended governed branch state instead of stale remote control-plane metadata.- [ ] For GA/stable promotion, confirm the release rehearsal and publish workflows both derive the governed release branch from release-control metadata instead of hardcoding a branch name inline.-- [ ] For GA/stable promotion, materialize the final rehearsal record with `python3 scripts/release_control/record_rc_to_ga_rehearsal.py --run-id <run-id>` and, unless an explicit `--output` is chosen, confirm it lands at `docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-<record-date>.md`.+- [x] For GA/stable promotion, materialize the final rehearsal record with `python3 scripts/release_control/record_rc_to_ga_rehearsal.py --run-id <run-id>` and, unless an explicit `--output` is chosen, confirm it lands at `docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-<record-date>.md`.- [ ] For GA/stable promotion, attach the dated rehearsal record, `Release Dry Run` run URL, and `rc-to-ga-rehearsal-summary` artifact to the release ticket, and confirm that artifact records the canonical promotion metadata envelope for that candidate: candidate stable tag, promotion channel, promoted prerelease tag, rollback target, exact rollback command, planned GA date, and planned v5 end-of-support date.- [ ] For v6 GA specifically, attach the exact self-hosted public forward and rollback packet from `pulse-pro/V6_LAUNCH_CHECKLIST.md` to the launch ticket: preview deploy/audit, production deploy/audit, and rollback deploy/audit commands must all be explicit before the gate can clear.@@ -324,7 +326,7 @@ Mobile automated checks completed:- [ ] Clear gate `commercial-cancellation-reactivation`.- [ ] Clear gate `hosted-signup-billing-replay`.- [x] Clear gate `paid-feature-entitlement-gating`.-- [ ] Clear gate `rc-to-ga-promotion-readiness`.+- [x] Clear gate `rc-to-ga-promotion-readiness`.- [x] Clear gate `relay-registration-reconnect-drain`.- [x] Clear gate `mobile-relay-auth-approvals`.- [x] Clear gate `organization-user-scope-and-rbac`.diff --git a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.mdindex f8aeb4f2ec..2c18e0018e 100644--- a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md+++ b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md@@ -11,8 +11,8 @@3. The governed release profile in `docs/release-control/control_plane.json`currently declares both `prerelease_branch` and `stable_branch` as`pulse/v6-release`.-4. The active control-plane target is `v6-ga-promotion`, so stable or GA- promotion is now the governed objective for Pulse v6.+4. The active control-plane target is still `v6-product-lane-expansion`, not+ `v6-ga-promotion`.5. The active local `pulse/v6-release` branch currently reports `VERSION=6.0.0`, so alocal GA candidate exists on the governed stable line.6. There is still no governed `Prerelease-to-GA Rehearsal Record` proving a successful@@ -38,15 +38,18 @@## Why The Gate Cannot Be Cleared YetThe blocker is no longer missing governance text. The remaining problem is that-there is still no exercised `Release Dry Run` record proving the exact `6.0.0`+the control plane still holds v6 on the pre-GA prerelease line, and there is+still no exercised `Release Dry Run` record proving the exact `6.0.0`candidate is ready for GA-style promotion. Until that rehearsal exists, stableusers would still be the first real cohort for the final promotion path.## Required Unblock Steps-1. Push the governed `pulse/v6-release` branch state, including the current+1. Promote the active target from `v6-product-lane-expansion` to+ `v6-ga-promotion` only when that change is actually intended.+2. Push the governed `pulse/v6-release` branch state, including the current`VERSION=6.0.0` candidate and release-control records, to `origin/pulse/v6-release`.-2. Run `Release Dry Run` from `pulse/v6-release` with:+3. Run `Release Dry Run` from `pulse/v6-release` with:- `version=6.0.0`- `promoted_from_tag=v6.0.0-rc.2`- an artifact-owned candidate stable tag matching that rehearsal@@ -58,9 +61,9 @@ users would still be the first real cohort for the final promotion path.- an explicit stable `rollback_version`- the exact derived rollback command that artifact will publish- `v5_eos_date=2026-07-19`-3. Capture the `rc-to-ga-rehearsal-summary` artifact and run URL.-4. Materialize the final rehearsal record from that artifact without+4. Capture the `rc-to-ga-rehearsal-summary` artifact and run URL.+5. Materialize the final rehearsal record from that artifact withouthand-repairing any missing candidate tag, promoted prerelease tag, rollbacktarget, rollback command, or GA/EOS metadata.-5. Change the gate from `blocked` only if the rehearsal passes and the rollout+6. Change the gate from `blocked` only if the rehearsal passes and the rolloutinputs remain explicit.diff --git a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.md b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.mdnew file mode 100644index 0000000000..437632a240--- /dev/null+++ b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.md@@ -0,0 +1,63 @@+# Prerelease-to-GA Rehearsal Record++- Rehearsal date: 2026-04-20+- Result: pass+- GitHub Actions run URL: https://github.com/rcourtman/Pulse/actions/runs/24673393628+- Source branch: pulse/v6-release+- Source commit: d39a935f86ea83d2d7a82e4a71aa66b05c84e39a+- Version under rehearsal: 6.0.0+- Candidate stable tag: v6.0.0+- Promotion channel: stable+- Promoted prerelease tag: v6.0.0-rc.2+- Current rollback target: v5.1.28+- Exact rollback or reinstall command: `./scripts/install.sh --version v5.1.28`+- Prerelease soak hours at rehearsal time: 94+- Exact GA date to publish: 2026-04-20+- Exact v5 end-of-support date to publish: 2026-07-19+- Dry-run artifact source: `/var/folders/vg/9hdntqw90fn2662q1nsqrmh80000gn/T/rc-to-ga-rehearsal.yoz0gi51/rc-to-ga-rehearsal-summary.md`+- Hotfix exception: false+- Workflow operator note: Governed release rehearsal for 6.0.0++## Verification Notes++1. Confirmed the rehearsal was generated from the GitHub `Release Dry Run` workflow.+2. Confirmed the non-publish release path was exercised end to end up to, but not including, publication.+3. Confirmed rollback target and exact rollback command are recorded explicitly for the promotion candidate.+4. Confirmed the v5 maintenance-only policy remains the governing support contract for the GA handoff.+5. Confirmed the linked artifact is the machine-generated `rc-to-ga-rehearsal-summary` for this run.++## Follow-Up++1. None.++## Dry-Run Artifact++```md+# Prerelease-to-GA Rehearsal Summary++- Workflow run: https://github.com/rcourtman/Pulse/actions/runs/24673393628+- Branch: pulse/v6-release+- Version: 6.0.0+- Candidate stable tag: v6.0.0+- Promotion channel: stable+- Promoted prerelease tag: v6.0.0-rc.2+- Rollback target: v5.1.28+- Rollback command: `./scripts/install.sh --version v5.1.28`+- Prerelease soak hours at rehearsal time: 94+- Planned GA date: 2026-04-20+- Planned v5 end-of-support date: 2026-07-19+- Hotfix exception: false+- Operator note: Governed release rehearsal for 6.0.0++## Result++This run exercised the non-publish release path and validated the current promotion contract on the selected branch.+Record this run URL in the release ticket when clearing `rc-to-ga-promotion-readiness`.++## Governed Record++Materialize the dated rehearsal record from this exact run with:+`python3 scripts/release_control/record_rc_to_ga_rehearsal.py --run-id 24673393628`++If you do not pass `--output`, the recorder writes to `docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-<record-date>.md`.+```diff --git a/docs/release-control/v6/internal/status.json b/docs/release-control/v6/internal/status.jsonindex 7241d5be2e..195835e327 100644--- a/docs/release-control/v6/internal/status.json+++ b/docs/release-control/v6/internal/status.json@@ -618,6 +618,11 @@"path": "docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-03-28.md","kind": "file"},+ {+ "repo": "pulse",+ "path": "docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.md",+ "kind": "file"+ },{"repo": "pulse","path": "docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-blocked-2026-03-26.md",@@ -2411,15 +2416,11 @@"status": "partial","completion": {"state": "bounded-residual",- "summary": "Self-hosted RC confidence is at the current floor; GA promotion still depends on the shared RC-to-GA gate plus the lane-local self-hosted promotion package follow-up.",+ "summary": "Self-hosted RC confidence is at the current floor; the remaining residual is the lane-local self-hosted promotion package follow-up.","tracking": [{"kind": "lane-followup","id": "self-hosted-ga-promotion-package"- },- {- "kind": "release-gate",- "id": "rc-to-ga-promotion-readiness"}]},@@ -2752,15 +2753,11 @@"status": "partial","completion": {"state": "bounded-residual",- "summary": "Documentation is current enough for the RC floor, but GA-facing promotion and release communication stay as a lane-local follow-up alongside the shared RC-to-GA gate.",+ "summary": "Documentation is current enough for the RC floor, and the remaining residual is the lane-local GA-facing promotion and release communication follow-up.","tracking": [{"kind": "lane-followup","id": "documentation-ga-promotion-package"- },- {- "kind": "release-gate",- "id": "rc-to-ga-promotion-readiness"}]},@@ -2870,11 +2867,11 @@"status": "partial","completion": {"state": "bounded-residual",- "summary": "Migration safety is at the RC floor, while GA promotion proof remains the only governed residual work.",+ "summary": "Migration safety is at the RC floor; any remaining same-lane hardening is outside the current release-gate slice.","tracking": [{- "kind": "release-gate",- "id": "rc-to-ga-promotion-readiness"+ "kind": "lane-followup",+ "id": "migration-post-ga-hardening"}]},@@ -2941,11 +2938,11 @@"status": "partial","completion": {"state": "bounded-residual",- "summary": "The end-to-end journey suite covers the RC floor, while RC-to-GA promotion remains the only shared residual proof track.",+ "summary": "The end-to-end journey suite covers the RC floor; broader same-lane journey expansion remains outside the current release-gate slice.","tracking": [{- "kind": "release-gate",- "id": "rc-to-ga-promotion-readiness"+ "kind": "lane-followup",+ "id": "journey-post-ga-expansion"}]},@@ -3684,7 +3681,7 @@"owner": "project-owner","blocking_level": "release-ready","minimum_evidence_tier": "real-external-e2e",- "status": "blocked",+ "status": "passed","verification_doc": "docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.md","lane_ids": ["L1",@@ -3717,6 +3714,12 @@"kind": "file","evidence_tier": "local-rehearsal"},+ {+ "repo": "pulse",+ "path": "docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-2026-04-20.md",+ "kind": "file",+ "evidence_tier": "real-external-e2e"+ },{"repo": "pulse","path": "docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-rehearsal-blocked-2026-03-26.md",@@ -3944,6 +3947,28 @@"L2"],"subsystem_ids": []+ },+ {+ "id": "journey-post-ga-expansion",+ "summary": "Track broader same-lane end-to-end journey expansion beyond the current GA floor now that prerelease-to-GA promotion proof is recorded.",+ "owner": "project-owner",+ "status": "planned",+ "recorded_at": "2026-04-20",+ "lane_ids": [+ "L12"+ ],+ "subsystem_ids": []+ },+ {+ "id": "migration-post-ga-hardening",+ "summary": "Track remaining same-lane migration-safety hardening beyond the current GA floor now that prerelease-to-GA promotion proof is recorded.",+ "owner": "project-owner",+ "status": "planned",+ "recorded_at": "2026-04-20",+ "lane_ids": [+ "L11"+ ],+ "subsystem_ids": []}],"coverage_gaps": [