Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
Go aialertsdashboarddockerdocker-monitoringgohomelabinfrastructure-monitoringkubernetesmonitoringmspproxmoxproxmox-backup-serverproxmox-mail-gatewayproxmox-veself-hostedtruenastypescriptvspherewebhooks
Block mobile GA on product purpose clarity
rcourtmanad4f5ff89a1a
diff --git a/docs/release-control/v6/internal/records/mobile-product-purpose-ga-blocker-2026-04-24.md b/docs/release-control/v6/internal/records/mobile-product-purpose-ga-blocker-2026-04-24.mdnew file mode 100644index 0000000000..3229d0b200--- /dev/null+++ b/docs/release-control/v6/internal/records/mobile-product-purpose-ga-blocker-2026-04-24.md@@ -0,0 +1,25 @@+# Mobile Product Purpose GA Blocker - 2026-04-24++## Classification++- Type: release gate+- Blocking level: release-ready+- Lane: L5 Mobile go-live readiness++## Trigger++During physical iPad proof review on 2026-04-24, the product owner stated that the actual Pulse Mobile experience does not make clear what the app brings to a normal self-hosted Pulse user or what the app is for.++## Judgment++The current mobile candidate may be technically release-capable, including physical-device pairing, APNs delivery, tap-through routing, approval actions, reconnect, and store configuration evidence, but that does not make it product GA-ready.++Pulse Mobile public rollout is blocked until the in-app experience itself explains and proves the companion-app value for self-hosted operators. The target product shape should make the primary jobs obvious without internal explanation: away-from-desk infrastructure alert triage, quick status orientation, safe approval handling, and recovery from notification or deep-link context.++## Exit Criteria++- The app has an explicit product role rather than feeling like a thin or unexplained subset of desktop Pulse.+- First-run, unpaired, paired, empty, alert, approval, and recovery states make the next useful action obvious to a normal self-hosted operator.+- The first screen after pairing communicates current estate state and why opening mobile is useful.+- A physical-device walkthrough demonstrates that a user can understand the app purpose and primary jobs without release-team narration.+- Technical readiness evidence remains current on the candidate being promoted.diff --git a/docs/release-control/v6/internal/status.json b/docs/release-control/v6/internal/status.jsonindex acb3a6d576..5a50967b28 100644--- a/docs/release-control/v6/internal/status.json+++ b/docs/release-control/v6/internal/status.json@@ -2650,7 +2650,7 @@"status": "partial","completion": {"state": "bounded-residual",- "summary": "Mobile is at the RC usefulness floor; broader go-live hardening remains post-RC follow-up, and store-capable work stays draft/TestFlight/internal-only until the current candidate is rerun on physical devices and explicitly judged product-ready.",+ "summary": "Mobile is technically release-capable at the RC usefulness floor, but product GA is blocked: the current iPad experience does not yet make the normal self-hosted Pulse user value clear enough to justify public rollout. Store-capable work stays draft/TestFlight/internal-only until the mobile product purpose, first-run story, and primary operator jobs are explicit in the app and revalidated on device.","tracking": [{"kind": "lane-followup",@@ -2666,6 +2666,11 @@"path": "docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md","kind": "file"},+ {+ "repo": "pulse",+ "path": "docs/release-control/v6/internal/records/mobile-product-purpose-ga-blocker-2026-04-24.md",+ "kind": "file"+ },{"repo": "pulse-mobile","path": "store/listing.md",@@ -3708,6 +3713,26 @@}]},+ {+ "id": "mobile-product-purpose-and-first-run-clarity",+ "summary": "Confirm Pulse Mobile communicates a clear self-hosted operator purpose in the actual app experience: a normal user should understand why the companion app exists, what jobs it handles away from the desktop, and how pairing, alerts, approvals, and recovery surfaces fit together before public rollout.",+ "owner": "project-owner",+ "blocking_level": "release-ready",+ "minimum_evidence_tier": "local-rehearsal",+ "status": "blocked",+ "verification_doc": "docs/release-control/v6/internal/HIGH_RISK_RELEASE_VERIFICATION_MATRIX.md",+ "lane_ids": [+ "L5"+ ],+ "evidence": [+ {+ "repo": "pulse",+ "path": "docs/release-control/v6/internal/records/mobile-product-purpose-ga-blocker-2026-04-24.md",+ "kind": "file",+ "evidence_tier": "local-rehearsal"+ }+ ]+ },{"id": "mobile-relay-auth-approvals","summary": "Confirm pulse-mobile pairing, persistence, relay reconnect, auth transitions, and approval flows work against a real instance.",@@ -4079,7 +4104,7 @@},{"id": "mobile-post-rc-hardening",- "summary": "Track broader mobile go-live hardening beyond the RC usefulness floor, including non-public store-capable rehearsal while public rollout stays blocked until the current candidate passes fresh physical-device proof and is judged product-ready.",+ "summary": "Track broader mobile go-live hardening beyond the RC usefulness floor, including non-public store-capable rehearsal while public rollout stays blocked until the actual app experience makes the self-hosted operator value, first-run story, and primary away-from-desk jobs clear enough to be judged product-ready.","owner": "project-owner","status": "planned","recorded_at": "2026-03-13",