Skip to content

armgit / Pulse

Public Imported from GitHub
0

Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.

Refresh RC blockers after RA17 unblock

rcourtmanaf7191e2ef63
diff --git a/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md b/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md
index c034f85102..8436c6e1f5 100644
--- a/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md
+++ b/docs/release-control/v6/internal/PRE_RELEASE_CHECKLIST.md
@@ -20,8 +20,9 @@ Use this as the final gate before cutting a Pulse v6 pre-release.
- The latest RC publication judgment packet is
`docs/release-control/v6/internal/records/rc-publication-judgment-packet-2026-04-09.md`.
It does not clear the open decision: the active-target proof currently blocks
- on the parallel `pulse-enterprise` approval-handler slice requiring
- `go mod tidy`.
+ in `pulse/internal/api` because `vmware_handlers.go` still references the old
+ monitored-system helper names instead of the canonical `...FromUsage`
+ helpers.
- The active target is back on `v6-rc-cut`, so GA rehearsal remains
intentionally out of scope until a real RC has actually shipped and
promotion is resumed explicitly.
diff --git a/docs/release-control/v6/internal/records/rc-publication-judgment-packet-2026-04-09.md b/docs/release-control/v6/internal/records/rc-publication-judgment-packet-2026-04-09.md
index 15fb2dda2f..97b72624a3 100644
--- a/docs/release-control/v6/internal/records/rc-publication-judgment-packet-2026-04-09.md
+++ b/docs/release-control/v6/internal/records/rc-publication-judgment-packet-2026-04-09.md
@@ -72,7 +72,7 @@ Result:
3. `frontend-grandfathered-license-presentation`: pass.
4. `pulse-pro-public-checkout-reentry-guard`: pass.
-## Current Blocker
+## Enterprise Follow-Up
After the `RA16` proof repair, the full active-target guard was rerun. It
progressed through the earlier RC proof slices and then blocked at `RA17`:
@@ -100,7 +100,15 @@ go: updates to go.mod needed; to update it:
The `pulse-enterprise` repo already had unrelated dirty files in
`cmd/pulse-enterprise/main.go` and `cmd/pulse-enterprise/main_test.go` before
this packet was written. Those changes appear to belong to another parallel
-slice, so this packet does not run `go mod tidy` or edit `pulse-enterprise`.
+slice, so the dependency fix stayed limited to the module graph only.
+
+`pulse-enterprise` was repaired with:
+
+```text
+abdcd2d chore(deps): tidy enterprise module graph
+```
+
+That commit touched only `go.mod` and `go.sum`.
The mobile portions of the `RA17` proof passed:
@@ -117,19 +125,58 @@ python3 scripts/release_control/readiness_assertion_guard.py --assertion RA18
Result: pass.
+The isolated `RA17` proof was then rerun:
+
+```bash
+python3 scripts/release_control/internal/mobile_relay_auth_approvals_proof.py --json
+```
+
+Result: all subchecks passed, including `enterprise-approval-handlers`.
+
+## Current Blocker
+
+With the enterprise module graph repaired, the full active-target guard was
+rerun outside the sandbox so the loopback test server could bind normally. That
+run progressed past `RA17` and then blocked earlier in the Pulse runtime at
+`RA3`/`RA4`:
+
+```text
+BLOCKED: readiness assertion proof failed for RA3,RA4:entitlement-gating-api-tests (exit 1)
+```
+
+The concrete failure is now a Pulse API build break:
+
+```text
+internal/api/vmware_handlers.go:672:14: undefined: monitoredSystemLimitDecisionForRecords
+internal/api/vmware_handlers.go:712:14: undefined: monitoredSystemLimitDecisionForRecordsReplacement
+```
+
+The canonical helpers currently present in the repo are:
+
+```text
+internal/api/monitored_system_limit_enforcement.go:289: monitoredSystemLimitDecisionForRecordsFromUsage
+internal/api/monitored_system_limit_enforcement.go:313: monitoredSystemLimitDecisionForRecordsReplacementFromUsage
+```
+
+That means the RC blocker is no longer the enterprise repo. The current blocker
+is an in-progress Pulse monitored-system enforcement/admission slice where
+`vmware_handlers.go` still references the pre-rename helper names while the
+shared contract has already moved to the `...FromUsage` helpers.
+
## Judgment Outcome
Do not clear `rc-publication-judgment` from this packet.
The release-control metadata is close to the RC floor, but the current
-workspace cannot complete the active-target proof while the enterprise approval
-handler slice requires `go mod tidy`. Publishing an RC from this state would
-turn a parallel worktree hygiene problem into an ambiguous release decision.
+workspace still cannot complete the active-target proof. Publishing an RC from
+this state would let an incomplete Pulse monitored-system slice masquerade as a
+governed release judgment.
## Required Unblock Steps
-1. Resolve the `pulse-enterprise` mod-tidy requirement in the owning
- enterprise slice.
+1. Finish the Pulse monitored-system enforcement/admission slice so
+ `internal/api/vmware_handlers.go` uses the canonical helper names that
+ currently exist in `monitored_system_limit_enforcement.go`.
2. Return all active repos needed for the RC proof to a clean, intentional
state.
3. Rerun:
diff --git a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md
index 40c259ff55..cac39cd5bf 100644
--- a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md
+++ b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md
@@ -9,26 +9,23 @@
1. No Pulse v6 prerelease has shipped yet.
2. The repository contains accidental prerelease git tag history (`v6.0.0-rc.1`),
but those tags were never published and do not count as shipped prerelease lineage.
-3. The selected remote ref `origin/pulse/v6-release` is still behind the current
- local governed branch state, so `Release Dry Run` would exercise stale remote
- control-plane metadata instead of the intended candidate.
-4. The governed release profile in `docs/release-control/control_plane.json`
+3. The governed release profile in `docs/release-control/control_plane.json`
currently declares both `prerelease_branch` and `stable_branch` as
`pulse/v6-release`.
-5. The active control-plane target is still `v6-rc-cut`, not
+4. The active control-plane target is still `v6-rc-cut`, not
`v6-ga-promotion`.
-6. The active local `pulse/v6-release` branch currently reports `VERSION=6.0.0-dev`, so the
+5. The active local `pulse/v6-release` branch currently reports `VERSION=6.0.0-dev`, so the
working line is still prerelease and there is not yet a governed local stable
`6.0.0` candidate.
-7. There is still no governed `Prerelease-to-GA Rehearsal Record` proving a successful
+6. There is still no governed `Prerelease-to-GA Rehearsal Record` proving a successful
non-publish `Release Dry Run` for the eventual stable `6.0.0` candidate.
-8. `docs/releases/RELEASE_NOTES_v6.md` and
+7. `docs/releases/RELEASE_NOTES_v6.md` and
`docs/release-control/v6/internal/V5_MAINTENANCE_SUPPORT_POLICY.md` still leave the
GA announcement dates as placeholders because no real prerelease lineage or GA-ready
rehearsal has locked them yet:
- `v6` GA date placeholder: `[v6-ga-date]`
- `v5` end-of-support placeholder: `[v5-eos-date]`
-9. There is still no governed `Release Dry Run` artifact or rehearsal record
+8. There is still no governed `Release Dry Run` artifact or rehearsal record
exercising stable inputs for:
- `version=6.0.0`
- no governed `promoted_from_tag` exists yet because no prerelease has shipped
diff --git a/docs/release-control/v6/internal/status.json b/docs/release-control/v6/internal/status.json
index 733cd1c731..50f7fcc399 100644
--- a/docs/release-control/v6/internal/status.json
+++ b/docs/release-control/v6/internal/status.json
@@ -4225,7 +4225,7 @@
"open_decisions": [
{
"id": "rc-publication-judgment",
- "summary": "Pulse v6 prerelease publication remains an explicit product judgment: the 2026-04-09 packet records that the current active-target proof is blocked by the parallel pulse-enterprise approval-handler mod-tidy state, so `rc_ready` stays blocked until that proof passes and the owner explicitly approves a real governed RC.",
+ "summary": "Pulse v6 prerelease publication remains an explicit product judgment: the 2026-04-09 packet records that the enterprise module drift was repaired, but the current active-target proof still blocks in Pulse because `internal/api/vmware_handlers.go` references pre-rename monitored-system helper names instead of the canonical `...FromUsage` helpers, so `rc_ready` stays blocked until that proof passes and the owner explicitly approves a real governed RC.",
"owner": "project-owner",
"blocking_level": "rc-ready",
"status": "blocked",