Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
Go aialertsdashboarddockerdocker-monitoringgohomelabinfrastructure-monitoringkubernetesmonitoringmspproxmoxproxmox-backup-serverproxmox-mail-gatewayproxmox-veself-hostedtruenastypescriptvspherewebhooks
Record rc.5 acceleration qualification
rcourtmanb261e4290182
diff --git a/docs/release-control/v6/internal/records/release-acceleration-v6.3.0-rc.5-2026-08-21.md b/docs/release-control/v6/internal/records/release-acceleration-v6.3.0-rc.5-2026-08-21.mdnew file mode 100644index 0000000000..4201634340--- /dev/null+++ b/docs/release-control/v6/internal/records/release-acceleration-v6.3.0-rc.5-2026-08-21.md@@ -0,0 +1,62 @@+# v6.3.0-rc.5 Release Acceleration Qualification++## Candidate identity++- Initial dispatch SHA: `4217f72bdc92ef4ec31a74ad1056551fc2848711`+- Initial release run: `32493044910`+- Private staging child: `rcourtman/pulse-enterprise` run `32493076136`+- Code-backed correction: `ae27ad751174d2b2b3160a86f127d5c087a645d1`+- Version: `v6.3.0-rc.5`+- Rollback target: `v6.2.1`++## Failed qualification attempt++The release was dispatched at `2026-08-21T14:36:24Z`. Preparation completed in+9 seconds, the frontend embed bundle completed in 61 seconds, and the Windows+PowerShell installer smoke completed in 64 seconds. Backend qualification+started at `14:37:49Z` and failed at `14:40:12Z`, 3 minutes 48 seconds after+dispatch. The failure was therefore definitive while the public mutation+boundary was still closed.++The PVE worker had 8 virtual CPUs and 5,986 MiB available while the public,+private, and backend compile lanes overlapped. The memory-aware planner+correctly selected one API shard. Its count-only batch ceiling then placed all+3,736 top-level API tests in one `-test.run` regex. Linux rejected the exec+with `Argument list too long` before any API test ran. This was a release-harness+failure, not a product test failure.++Both the public release run and its inert private staging child were cancelled.+No `v6.3.0-rc.5` Git tag or GitHub release was created, and no customer+activation or convergence owner existed.++## Correction and proof++The canonical shard planner now caps each deterministic contiguous batch by+both test count and encoded regex byte length. The default 64 KiB ceiling stays+below Linux's per-argument exec limit without forcing a second memory-heavy+race process when the worker legitimately falls back to one shard.++Proof on the exact compiled PVE API test inventory:++- 3,736 top-level tests discovered+- one shard retained+- three ordered batches: 1,288, 1,327, and 1,121 tests+- largest encoded regex: 65,520 bytes+- reconstructed batch order exactly matched the compiled binary's emitted+ order++The focused Python release-preflight suite passed all nine tests with one+intentional skip. The Go release-asset contract test passed. Shell syntax,+contract, status, and registry audits passed. The complete repository+pre-commit gate passed, including secret and sensitivity scans, canonical+completion enforcement, governance guardrails, and release-control tests.++## Retry boundary++The next release dispatch must use an exact pushed `main` SHA that descends+from `ae27ad751174d2b2b3160a86f127d5c087a645d1`. It must build and qualify a+new immutable candidate and a new private staging packet; artifacts or prefixes+from the cancelled attempt are not retry inputs. The warm dispatch-to-definitive+convergence objective remains open until a complete release measures 15 minutes+or less without weakening exact-SHA qualification, signing, installer smoke,+public/private integrity, or convergence verification.