Record rc.5 acceleration qualification

rcourtmanb261e4290182
diff --git a/docs/release-control/v6/internal/records/release-acceleration-v6.3.0-rc.5-2026-08-21.md b/docs/release-control/v6/internal/records/release-acceleration-v6.3.0-rc.5-2026-08-21.md
new file mode 100644
index 0000000000..4201634340
--- /dev/null
+++ b/docs/release-control/v6/internal/records/release-acceleration-v6.3.0-rc.5-2026-08-21.md
@@ -0,0 +1,62 @@
+# v6.3.0-rc.5 Release Acceleration Qualification
+
+## Candidate identity
+
+- Initial dispatch SHA: `4217f72bdc92ef4ec31a74ad1056551fc2848711`
+- Initial release run: `32493044910`
+- Private staging child: `rcourtman/pulse-enterprise` run `32493076136`
+- Code-backed correction: `ae27ad751174d2b2b3160a86f127d5c087a645d1`
+- Version: `v6.3.0-rc.5`
+- Rollback target: `v6.2.1`
+
+## Failed qualification attempt
+
+The release was dispatched at `2026-08-21T14:36:24Z`. Preparation completed in
+9 seconds, the frontend embed bundle completed in 61 seconds, and the Windows
+PowerShell installer smoke completed in 64 seconds. Backend qualification
+started at `14:37:49Z` and failed at `14:40:12Z`, 3 minutes 48 seconds after
+dispatch. The failure was therefore definitive while the public mutation
+boundary was still closed.
+
+The PVE worker had 8 virtual CPUs and 5,986 MiB available while the public,
+private, and backend compile lanes overlapped. The memory-aware planner
+correctly selected one API shard. Its count-only batch ceiling then placed all
+3,736 top-level API tests in one `-test.run` regex. Linux rejected the exec
+with `Argument list too long` before any API test ran. This was a release-harness
+failure, not a product test failure.
+
+Both the public release run and its inert private staging child were cancelled.
+No `v6.3.0-rc.5` Git tag or GitHub release was created, and no customer
+activation or convergence owner existed.
+
+## Correction and proof
+
+The canonical shard planner now caps each deterministic contiguous batch by
+both test count and encoded regex byte length. The default 64 KiB ceiling stays
+below Linux's per-argument exec limit without forcing a second memory-heavy
+race process when the worker legitimately falls back to one shard.
+
+Proof on the exact compiled PVE API test inventory:
+
+- 3,736 top-level tests discovered
+- one shard retained
+- three ordered batches: 1,288, 1,327, and 1,121 tests
+- largest encoded regex: 65,520 bytes
+- reconstructed batch order exactly matched the compiled binary's emitted
+ order
+
+The focused Python release-preflight suite passed all nine tests with one
+intentional skip. The Go release-asset contract test passed. Shell syntax,
+contract, status, and registry audits passed. The complete repository
+pre-commit gate passed, including secret and sensitivity scans, canonical
+completion enforcement, governance guardrails, and release-control tests.
+
+## Retry boundary
+
+The next release dispatch must use an exact pushed `main` SHA that descends
+from `ae27ad751174d2b2b3160a86f127d5c087a645d1`. It must build and qualify a
+new immutable candidate and a new private staging packet; artifacts or prefixes
+from the cancelled attempt are not retry inputs. The warm dispatch-to-definitive
+convergence objective remains open until a complete release measures 15 minutes
+or less without weakening exact-SHA qualification, signing, installer smoke,
+public/private integrity, or convergence verification.