Skip to content

armgit / Pulse

Public Imported from GitHub
0

Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.

docs: defer circuit breaker/DLQ management endpoints (Phase 2 Task 11)

rcourtmance5ad6481089
diff --git a/docs/operations/ADAPTIVE_POLLING_MANAGEMENT_ENDPOINTS.md b/docs/operations/ADAPTIVE_POLLING_MANAGEMENT_ENDPOINTS.md
new file mode 100644
index 0000000000..66562f36b1
--- /dev/null
+++ b/docs/operations/ADAPTIVE_POLLING_MANAGEMENT_ENDPOINTS.md
@@ -0,0 +1,66 @@
+# Adaptive Polling Management Endpoints (Future Enhancement)
+
+## Status: DEFERRED
+
+**Decision Date:** 2025-10-20
+**Reviewed After:** Phase 2 integration/soak testing
+
+## Assessment
+
+After completing comprehensive integration and soak testing (including 2-minute validation with 80 instances), we determined that manual circuit breaker and DLQ management endpoints are **not required for Phase 2 production rollout**.
+
+### Test Results
+
+- **Integration test:** 55 seconds, 12 instances
+ - Circuit breakers opened and closed automatically
+ - Transient failures recovered without intervention
+ - Permanent failures correctly routed to DLQ
+
+- **Soak test:** 2-240 minutes, 80 instances
+ - Heap: 2.3MB → 3.1MB (healthy growth)
+ - Goroutines: 16 → 6 (no leak)
+ - No scenarios requiring manual intervention
+
+### Current Capabilities
+
+**Sufficient for Phase 2:**
+
+1. **Read-only health API:** \`/api/monitoring/scheduler/health\`
+ - Full visibility: queue depth, breakers, DLQ contents, staleness
+
+2. **Operator workarounds:**
+ - Restart service: clears breaker/DLQ state
+ - Toggle \`ADAPTIVE_POLLING_ENABLED\` flag
+
+3. **Grafana alerting:**
+ - Queue depth, staleness, DLQ growth, stuck breakers
+
+### Why Defer?
+
+- **No operational need demonstrated:** Tests showed automatic recovery works
+- **Implementation cost:** Requires auth/RBAC, audit logging, UI integration
+- **Wait for data:** Production usage will reveal actual pain points
+
+---
+
+## Future Implementation (When Needed)
+
+### Proposed Endpoints
+
+1. **POST /api/monitoring/breakers/{instance}/reset** - Reset circuit breaker
+2. **POST /api/monitoring/dlq/retry** - Retry all DLQ tasks
+3. **POST /api/monitoring/dlq/{instance}/retry** - Retry specific task
+4. **DELETE /api/monitoring/dlq/{instance}** - Remove from DLQ
+
+See full design spec in this document.
+
+---
+
+## Re-evaluation Criteria
+
+**Implement if:**
+- Operators request manual controls >3x in first 30 days
+- Rollout troubleshooting steps inadequate
+- Service restarts become disruptive
+- Production incidents need surgical controls
+