Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.
Go aialertsdashboarddockerdocker-monitoringgohomelabinfrastructure-monitoringkubernetesmonitoringmspproxmoxproxmox-backup-serverproxmox-mail-gatewayproxmox-veself-hostedtruenastypescriptvspherewebhooks
Record passing production Stripe remediation
rcourtmand407bec47fd6
diff --git a/docs/release-control/v6/internal/records/self-hosted-commercial-transition-coherence-production-remediation-2026-07-15.md b/docs/release-control/v6/internal/records/self-hosted-commercial-transition-coherence-production-remediation-2026-07-15.mdnew file mode 100644index 0000000000..ec464ca940--- /dev/null+++ b/docs/release-control/v6/internal/records/self-hosted-commercial-transition-coherence-production-remediation-2026-07-15.md@@ -0,0 +1,78 @@+# Self-Hosted Commercial Production Remediation Record++- Date: `2026-07-15`+- Gate: `self-hosted-commercial-transition-coherence`+- Result: `production catalog and portal residual passed`+- Evidence tier: `production-observed`++## Approved Scope++The user approved the exact production plan after a GET-only preview. The+bounded apply was limited to:++1. aligning the existing public Pulse Relay and Pulse Pro Stripe product+ descriptions with the canonical offer;+2. creating a dedicated Customer Portal configuration for invoice history and+ payment-method updates only; and+3. deploying that configuration identifier to the license runtime before a+ read-only re-audit.++No price, customer, subscription, webhook, or license object was changed. No+customer, subscription, webhook, or license record was read.++## Stripe Result++The guarded `pulse-pro:scripts/remediate_stripe_commercial_state.py` apply+converged these existing products:++- `prod_U37aaHIl0MtpS5` (`Pulse Relay`): `Secure remote access and Pulse Mobile+ connectivity for one owner-operated Pulse environment.`+- `prod_U37aCdMDY0V6cK` (`Pulse Pro`): `Patrol-powered operations for one+ owner-operated Pulse environment, including Relay connectivity and Pulse+ Mobile.`++Stripe created dedicated portal configuration+`bpc_1TtNsxBrHBocJIGHTjRvG4Qf`, named `Pulse self-hosted invoices and payment+methods`. It enables `invoice_history` and `payment_method_update`. It disables+`customer_update`, `subscription_cancel`, `subscription_update`, and the hosted+`login_page`.++## Runtime Deployment And Recovery++The successful deployment backed up the production environment to+`/etc/pulse-license/secrets.env.bak.stripe-portal.20260715T081138Z`, added the+portal identifier exactly once as `STRIPE_BILLING_PORTAL_CONFIGURATION_ID`, and+restarted `pulse-license`. Loopback and public `/healthz` returned+`{"status":"ok"}`.++An earlier atomic-writer attempt created+`/etc/pulse-license/secrets.env.bak.stripe-portal.20260715T081025Z` but failed+its key-count postcondition after writing escaped line separators. The command+stopped before service restart, so the malformed configuration was never+loaded. The file was restored from that backup, its original 73-line structure+and shell syntax were verified, and service health was confirmed before the+successful deployment. The first public probe during the intentional recovery+restart returned a transient `502`; loopback and public health passed after the+service became ready.++## Read-Only Postconditions++The post-deploy validator reported:++- `ok: true`;+- `checked_prices: 25`;+- `portal_configuration_checked: true`;+- zero errors;+- the same four governed public Relay and Pro checkout price IDs; and+- only the two already-governed inactive v1 legacy recurring warnings.++A second default remediation plan returned `product_updates: []` and portal+action `reuse` for `bpc_1TtNsxBrHBocJIGHTjRvG4Qf`. The production license+runtime configuration validator also passed.++## Gate Verdict++The production catalog and portal failure recorded on `2026-07-14` is closed.+The release gate remains blocked: a passing production catalog observation does+not replace the governed external Stripe lifecycle transition/event-+reconciliation matrix or the real Relay license-version-floor exercise.diff --git a/docs/release-control/v6/internal/subsystems/cloud-paid.md b/docs/release-control/v6/internal/subsystems/cloud-paid.mdindex d4304b06f7..b9b82e0833 100644--- a/docs/release-control/v6/internal/subsystems/cloud-paid.md+++ b/docs/release-control/v6/internal/subsystems/cloud-paid.md@@ -1360,8 +1360,7 @@ or local completion steps, schedule-release retries repair the local quote, andthe authoritative backfill can reopen a terminal inbox event through thecursor-aware retry path. The implementation is not yet a released self-service capability: the governed external Stripe transition matrix, event--order/reconciliation exercise, Relay version-floor proof, and a passing-production catalog/portal audit remain required by+order/reconciliation exercise and Relay version-floor proof remain required by`self-hosted-commercial-transition-coherence`. Cloud remains unavailable andMSP remains an assisted preview.@@ -1371,8 +1370,8 @@ provide a governed billing-portal configuration identifier and the publicRelay/Pro Stripe products retained pre-contract descriptions. No Stripe objector customer record was mutated or inspected. The dated blocked record is`docs/release-control/v6/internal/records/self-hosted-commercial-transition-coherence-production-audit-blocked-2026-07-14.md`;-the gate stays blocked until separately approved remediation is deployed and-the same read-only audit passes.+at that point the gate stayed blocked until separately approved remediation+was deployed and the same read-only audit passed.Repository-side remediation preparation now exists in`pulse-pro:scripts/remediate_stripe_commercial_state.py`. Offline proof covers@@ -1380,8 +1379,21 @@ shared-product deduplication, strict price and mode preconditions, exact portalreuse, safe creation instead of mutation of a nonconforming portal, boundedwrite endpoints, and apply confirmation. The dormant new-environment pricecreation helper also uses the same canonical descriptions. This preparation-does not change the production finding: no live apply or runtime deployment-has been authorized or executed, and the gate remains blocked.+did not change the production finding at that point: no live apply or runtime+deployment had yet been authorized or executed.++On 2026-07-15 the separately approved bounded production remediation converged+the two public Relay/Pro product descriptions, created and deployed dedicated+invoice/payment-method-only portal configuration+`bpc_1TtNsxBrHBocJIGHTjRvG4Qf`, and passed the same GET-only production audit:+all 25 governed prices resolved, the portal contract passed, and the only+warnings were the already-governed inactive v1 legacy recurring prices. A+second remediation plan returned no product updates and reused the dedicated+portal, proving idempotent convergence. The production catalog/portal residual+is closed, but `self-hosted-commercial-transition-coherence` remains blocked+until the external Stripe lifecycle transition/event-reconciliation matrix and+real Relay license-version-floor exercise pass. The evidence record is+`docs/release-control/v6/internal/records/self-hosted-commercial-transition-coherence-production-remediation-2026-07-15.md`.The Relay side now fails closed on missing feed authority, drains the feedbefore serving, exposes feed staleness through readiness, and tears down stale