Skip to content

armgit / Pulse

Public Imported from GitHub
0

Real-time monitoring dashboard for Proxmox VE, PBS, Docker, Kubernetes, TrueNAS and vSphere. Self-hosted, with alerts for failed backups, full disks, unhealthy containers and offline nodes.

Add v6 RC operator support pack

rcourtmand587d0a7f7fc
diff --git a/docs/UPGRADE_v6.md b/docs/UPGRADE_v6.md
index f61f343243..0c371eaf74 100644
--- a/docs/UPGRADE_v6.md
+++ b/docs/UPGRADE_v6.md
@@ -2,6 +2,10 @@
This guide covers practical upgrade steps for existing Pulse installs moving to v6.
+For launch-time rollout answers and canned support responses, see:
+
+- `docs/releases/V6_RC_OPERATOR_SUPPORT_PACK.md`
+
## Before You Upgrade
- Create an encrypted config backup: **Settings → System → Recovery → Create Backup** (older versions labeled this **Backups**)
diff --git a/docs/releases/RELEASE_NOTES_v6.md b/docs/releases/RELEASE_NOTES_v6.md
index 55a5dcb9cc..492d4226f4 100644
--- a/docs/releases/RELEASE_NOTES_v6.md
+++ b/docs/releases/RELEASE_NOTES_v6.md
@@ -4,6 +4,10 @@
This build is intended for evaluation and early deployment testing before the stable `v6.0.0` release. Pulse v5 remains the current stable line. If you rely on Pulse in production today, start with a staging or non-critical environment first and keep a rollback path available.
+If you are handling rollout questions or want the launch-time canned answers for current v5 users, use:
+
+- `docs/releases/V6_RC_OPERATOR_SUPPORT_PACK.md`
+
## Before You Try It
- Do not make your first v6 test on a production Pulse v5 installation.
diff --git a/docs/releases/V6_RC_OPERATOR_SUPPORT_PACK.md b/docs/releases/V6_RC_OPERATOR_SUPPORT_PACK.md
new file mode 100644
index 0000000000..0dfddf8f93
--- /dev/null
+++ b/docs/releases/V6_RC_OPERATOR_SUPPORT_PACK.md
@@ -0,0 +1,138 @@
+# Pulse v6 RC Operator Support Pack
+
+This document is the launch-time support sheet for the first public Pulse v6
+release candidate, `v6.0.0-rc.1`.
+
+Use it when handling rollout questions from current Pulse v5 users, preparing
+FAQ answers, or deciding how to position the v6 preview in public-facing
+surfaces such as the demo site.
+
+## Support Stance
+
+- Pulse v5 remains the current stable line.
+- Pulse v6 `rc.1` is an opt-in evaluation build, not the default recommendation
+ for broad production rollout.
+- Support answers should push users toward staging or non-critical first-run
+ evaluation, not toward tearing down a healthy v5 install blindly.
+- The first public answer should be clear and confident, not apologetic. Treat
+ v6 as a real release candidate that needs validation, not as a throwaway
+ preview that "probably breaks".
+
+## Short Answers
+
+### Do I need to uninstall Pulse v5 first?
+
+No. Upgrade the existing Pulse server installation in place.
+
+### Do I need to uninstall existing Pulse Unified Agents first?
+
+No. Existing Unified Agents should be upgraded in place when testing them
+against a v6 server.
+
+### Does upgrading the Pulse server to v6 automatically upgrade my agents?
+
+No. Server upgrade and Unified Agent upgrade are separate operations.
+
+### Will an upgraded v5 agent keep the same identity in v6?
+
+Yes. The supported v5-to-v6 path is expected to preserve one canonical agent
+identity rather than duplicating the machine during upgrade.
+
+### Do I need new agent tokens just because the server moved to v6?
+
+No. Existing installed agents are expected to continue through the v6
+compatibility boundary for legacy persisted agent scopes.
+
+### Can one installed Pulse Unified Agent report to both a Pulse v5 instance and a Pulse v6 instance at the same time?
+
+Not as a supported in-place setup. A running Unified Agent installation is
+configured against one Pulse URL and one token, and it fetches remote config
+from that one Pulse server. For side-by-side evaluation, use a separate test
+host or VM, a cloned lab machine, or a separate isolated agent installation.
+
+### Can I keep Pulse v5 stable while I test Pulse v6?
+
+Yes. That is the recommended RC posture.
+
+### What happens to a Pulse v5 Pro or Lifetime license?
+
+Pulse v6 can migrate valid Pulse v5 Pro or Lifetime licensing into the v6
+activation model. If the auto-exchange does not complete, retry from the v6
+license panel using the existing key.
+
+### Will old bookmarks and familiar v5 pages still work?
+
+Not necessarily. v6 reorganizes the product around Dashboard, Infrastructure,
+Workloads, Storage, and Recovery. Old platform-era aliases and runbook links
+should be updated to canonical v6 routes.
+
+## Recommended Evaluation Path
+
+1. Back up the current system and keep direct console access available.
+2. Upgrade the Pulse server in place on a staging or non-critical environment.
+3. Verify basic runtime health before changing agents:
+ - `GET /api/version`
+ - `GET /api/monitoring/scheduler/health`
+ - `GET /api/resources`
+4. Upgrade agents separately only if the user is explicitly testing the v5 to
+ v6 agent path.
+5. If the user wants side-by-side comparison, use a separate lab install or
+ isolated agent deployment rather than dual-pointing one live agent.
+
+## Rollback Posture
+
+- The governed rollback target for the first v6 RC is `v5.1.27`.
+- If rollback is needed, pin the environment back to `v5.1.27` rather than
+ using an unpinned `latest` flow.
+- Support should treat rollback as a normal controlled outcome for RC
+ evaluation, not as user failure.
+- If rollback is required because of broken upgrade, duplicate agent identity,
+ licensing regression, or major monitoring breakage, collect the failure
+ details before the environment is discarded.
+
+## Ask For These Details
+
+When a user reports a v6 RC problem, ask for:
+
+- current version and prior version
+- install type: systemd/LXC, Docker, Kubernetes, or other
+- whether the issue happened during server upgrade, agent upgrade, or first use
+- license tier
+- whether this is a clean lab install or an upgraded v5 install
+- whether Unified Agents were upgraded yet
+- expected result
+- actual result
+- sanitized logs, screenshots, and diagnostics
+
+## Escalate Immediately
+
+Escalate without asking the user to keep experimenting when the report involves:
+
+- failed install or failed upgrade with no recovery path
+- duplicate or missing agent identity after a v5-to-v6 upgrade
+- monitoring or reporting that stops entirely after upgrade
+- license migration failure that blocks paid functionality unexpectedly
+- rollback failure or inability to return to the previous stable state
+- data-loss, destructive behavior, or security-sensitive regressions
+
+## Public Demo Guidance
+
+If the public demo site continues to serve Pulse v5 while Pulse v6 is still in
+RC:
+
+- keep Pulse v5 as the default public demo while v5 remains the stable line
+- expose Pulse v6 only as an explicit `Preview` or `RC` switch, not as the
+ default path
+- keep the v6 demo clearly labeled as mock-data preview behavior
+- show release-notes and feedback paths for the v6 preview
+- avoid presenting the v6 demo as if it were the current stable product
+
+That posture lets users explore v6 without confusing the stable story or
+creating the impression that the v5 demo silently changed underneath them.
+
+## Canonical References
+
+- `docs/UPGRADE_v6.md`
+- `docs/releases/RELEASE_NOTES_v6.md`
+- `docs/MIGRATION_UNIFIED_NAV.md`
+- `docs/PULSE_PRO.md`