diff --git a/docs/release-control/control_plane.json b/docs/release-control/control_plane.json
index c7b967161d..9ee346e350 100644
--- a/docs/release-control/control_plane.json
+++ b/docs/release-control/control_plane.json
@@ -6,7 +6,7 @@
"control_plane_doc": "docs/release-control/internal/CONTROL_PLANE.md",
"control_plane_schema": "docs/release-control/control_plane.schema.json",
"active_profile_id": "v6",
- "active_target_id": "v6-product-lane-expansion",
+ "active_target_id": "v6-ga-promotion",
"legacy_release_lines": [
{
"version_prefix": "5.1.",
@@ -54,15 +54,16 @@
"id": "v6-ga-promotion",
"profile_id": "v6",
"kind": "release",
- "status": "completed",
- "summary": "Promote Pulse v6 from a validated, actually shipped RC to governed GA with exercised promotion proof, rollback clarity, and only GA-blocking decisions remaining.",
- "completion_rule": "release_ready"
+ "status": "active",
+ "summary": "Execute Pulse v6 GA from the RC7 soak candidate unless telemetry or newly reported RC7 issues expose a release blocker; readiness gates are already cleared, so remaining work is release-day execution, public cutover approval, and final artifact publication rather than another default RC.",
+ "completion_rule": "manual",
+ "proof_scope": "none"
},
{
"id": "v6-product-lane-expansion",
"profile_id": "v6",
"kind": "feature",
- "status": "active",
+ "status": "planned",
"summary": "Promote proactive Pulse Intelligence, policy-aware data governance, resource-change intelligence, action-governance, fleet-governance, agent-operable infrastructure onboarding, continuous discovery reconciliation, and agent-ready operations contract proof only after the monitoring-first RC target is satisfied and the broader surfaced product case is proven; Patrol is the detection and investigation engine, Assistant is the contextual explanation, approval, and governed action surface, and agent-ready proof is API/CLI-first with MCP only as an adapter over canonical contracts.",
"completion_rule": "manual",
"proof_scope": "none"
diff --git a/docs/release-control/internal/CONTROL_PLANE.md b/docs/release-control/internal/CONTROL_PLANE.md
index 1757df6221..32afe4a030 100644
--- a/docs/release-control/internal/CONTROL_PLANE.md
+++ b/docs/release-control/internal/CONTROL_PLANE.md
@@ -236,14 +236,16 @@ user language should update the control plane.
## Current State
1. v6 is the current active release profile.
-2. `v6-product-lane-expansion` is the current active engineering target.
- The GA-promotion target is now complete, so default slice selection should
- move back to the highest-impact governed lane and coverage-gap work rather
- than staying pinned to release-promotion proof.
-3. Its candidate-lane surface remains available in
- `available_candidate_lane_queue` plus the linked `candidate_lanes` and
- `coverage_gaps`.
-4. `v6-ga-promotion` is completed because the shipped RC line reached
+2. `v6-ga-promotion` is the current active engineering target.
+ The shipped RC line has already reached `release_ready`, so the target is
+ now a human-held GA launch-execution target: RC7 is the final soak candidate
+ unless telemetry or newly reported RC7 issues expose a blocker, and the next
+ public release is GA rather than another default RC.
+3. `v6-product-lane-expansion` remains planned behind the GA launch target.
+ Its candidate-lane surface remains available in the linked
+ `candidate_lanes` and `coverage_gaps`, but it should not displace release
+ execution while GA is the current objective.
+4. The GA readiness gates are passed because the shipped RC line reached
`release_ready` with exercised prerelease-to-GA promotion proof, rollback
clarity, and the written v5 maintenance-only policy in place.
5. `v6-rc-stabilization` is completed after the shipped RCs established the
diff --git a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md
index d5ae107457..97f861c856 100644
--- a/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md
+++ b/docs/release-control/v6/internal/records/rc-to-ga-promotion-readiness-blocked-2026-04-04.md
@@ -14,8 +14,8 @@
4. The governed release profile in `docs/release-control/control_plane.json`
currently declares both `prerelease_branch` and `stable_branch` as
`pulse/v6-release`.
-5. The active control-plane target is still `v6-product-lane-expansion`, not
- `v6-ga-promotion`.
+5. The active control-plane target is `v6-ga-promotion`, so stable or GA
+ promotion is now the governed objective for Pulse v6.
6. The active local `pulse/v6-release` branch currently reports `VERSION=6.0.0`, so a
local GA candidate exists on the governed stable line.
7. There is still no governed `Prerelease-to-GA Rehearsal Record` proving a successful
@@ -41,18 +41,15 @@
## Why The Gate Cannot Be Cleared Yet
The blocker is no longer missing governance text. The remaining problem is that
-the control plane still holds v6 on the pre-GA prerelease line, and there is
-still no exercised `Release Dry Run` record proving the exact `6.0.0`
+there is still no exercised `Release Dry Run` record proving the exact `6.0.0`
candidate is ready for GA-style promotion. Until that rehearsal exists, stable
users would still be the first real cohort for the final promotion path.
## Required Unblock Steps
-1. Promote the active target from `v6-product-lane-expansion` to
- `v6-ga-promotion` only when that change is actually intended.
-2. Push the governed `pulse/v6-release` branch state, including the current
+1. Push the governed `pulse/v6-release` branch state, including the current
`VERSION=6.0.0` candidate and release-control records, to `origin/pulse/v6-release`.
-3. Run `Release Dry Run` from `pulse/v6-release` with:
+2. Run `Release Dry Run` from `pulse/v6-release` with:
- `version=6.0.0`
- `promoted_from_tag=v6.0.0-rc.6`
- an artifact-owned candidate stable tag matching that rehearsal
@@ -64,9 +61,9 @@ users would still be the first real cohort for the final promotion path.
- an explicit stable `rollback_version`
- the exact derived rollback command that artifact will publish
- `v5_eos_date=2026-09-02`
-4. Capture the `rc-to-ga-rehearsal-summary` artifact and run URL.
-5. Materialize the final rehearsal record from that artifact without
+3. Capture the `rc-to-ga-rehearsal-summary` artifact and run URL.
+4. Materialize the final rehearsal record from that artifact without
hand-repairing any missing candidate tag, promoted prerelease tag, rollback
target, rollback command, or GA/EOS metadata.
-6. Change the gate from `blocked` only if the rehearsal passes and the rollout
+5. Change the gate from `blocked` only if the rehearsal passes and the rollout
inputs remain explicit.
diff --git a/internal/repoctl/canonical_development_protocol_test.go b/internal/repoctl/canonical_development_protocol_test.go
index 989534ede5..ef44fb37d0 100644
--- a/internal/repoctl/canonical_development_protocol_test.go
+++ b/internal/repoctl/canonical_development_protocol_test.go
@@ -570,8 +570,9 @@ func TestReleaseControlPlaneFilesExist(t *testing.T) {
"\"stable_branch\": \"pulse/v6-release\"",
"\"completion_rule\": \"rc_ready\"",
"\"completion_rule\": \"manual\"",
- "\"completion_rule\": \"release_ready\"",
"\"proof_scope\": \"none\"",
+ "release-day execution",
+ "newly reported RC7 issues",
})
var controlPlane map[string]any