Next Gen STEP AP242 Native-ish BREP Geometric Modeling Kernel
Era 6: Firmament V2 and the AP242 MVP
18 June – 2 August 2026 · about 115 commits · AIR-FIRMAMENT-A2, HOLE-X, STEP-V2, INLINE-STEP, ANALYZE-MAP, V2 Phase 1, FORGE-CS
In one paragraph
With the compiler architecture settled, the source language had to catch up.
Firmament V2 was designed in four documents on a single day and then built: a
PascalCase, typed, declaration-based language with Records, with derivation,
semantic references, Concepts, Templates and PMI. Holes became semantic features
rather than subtracted cylinders. A readiness contract defined a minimum viable
product (V2 source to verified AP242 with semantic PMI) and a closeout audit
graded the repository against it. In parallel the team gave LLMs a way to "see"
parts without images, began a strangler-fig path for migrating imported STEP to
semantic source, and wrote down how an experienced CAD modeler thinks.
What was built
- The V2 language design (18 June). AIR-FIRMAMENT-A2 and its three companions
covered source design, semantic references and admissibility, record
derivation with
with, and DFM Templates, Concepts and PMI. Tests still read these four documents, which is why they are kept. - A parser, one slice at a time (AIR-FIRMAMENT-X1 to X12). A tiny V2 parser
for Box, then
with,=>exposure, a side-hole region, its variations along every axis, selector aliases and a route policy, each locked by artifact parity. - Semantic holes (HOLE-A0, HOLE-X1 to X4). Holes as first-class features with stacked components, materialized through AIR, with a V2 source hook.
- The AP242 MVP (STEP-V2-A1, X1 to X7, readiness contract, closeout). Box,
analytic primitives, semantic holes, derivation, multi-feature composition,
derived variants, DFM concept enforcement and semantic PMI, each
step-verified: real build, real B-rep, real exporter, reimport, topology and
volume checks. The closeout audit graded every fixture against that bar. The
Demotag (21 June) marks the resulting PMI demonstration. - Values with tolerances (V2 L1–L4, P1–P2).
letliterals, grouped records, an arithmetic expression graph, toleranced values, and record-shaped PMI exported to AP242. - Inline STEP (INLINE-STEP-A0, X1 to X7). Carry an imported STEP body unchanged, then annotate it, label recognized regions, account for the residual, propose semantic replacements and finally replace a region with a native feature. A strangler fig for existing geometry, not a decompiler.
- Seeing without pixels (ANALYZE-MAP-A0 to A6). Ray and height maps with analytic hits on every surface family, a six-view summary written for LLMs, connected components and ranked probes, dogfooded on NIST CTC-01 and FTC-09.
- LLM CAD strategy notes (20 June). Ten short essays on modeling strategy:
geometry inventory versus intent, prismatic first principles, semantic
decompilation, profiles as constructive regions, holes as semantic features,
edge-finish intent, manufacturing constraints. They are still in
architecture/llm-cad-strategyand fed the public modeling-strategy skill. - Display architecture (DISPLAY-ARCH A0, X1 to X6). DisplayIR with explicit partial display, bounded mesh lanes and wireframe fallback, retiring the old mesh-scene assumptions from the viewer.
- Forge (FORGE-A0, X1–X2, FORGE-CS A0–A5 in July). The semantic extension architecture: concept and Template descriptors, a standard concept pack, read-only C# interop facades, runtime concept validation, PMI obligations and trusted external packs.
- Housekeeping. .NET 10 only, a legacy-V1 test policy, testhost triage, and "house calls" on FTC-06 and FTC-07 import problems.
Decisions that stuck
- Firmament V2 is the language. V1 became a compatibility input.
- Holes, and later most features, are semantic, carrying intent into AIR, STEP labels and PMI.
- "Step-verified" means the real path end to end, including reimport. Parsed or planned is not done.
- Imported geometry migrates incrementally, region by region, with the residual accounted for.
- LLMs are first-class users. Text summaries, maps and strategy notes were built for agents, not added for them later.
Claude's commentary
The V2 design landed in a day because the hard thinking had already happened.
Records, with, Concepts and Templates are what you get when you take "declare
intent before topology" seriously at the source level: values are fixed before
lowering, choices are compile-time, and a Template is specialization, not a
macro. The language was designed by a compiler person, and it shows.
Two early bets from this era are worth noting because they look obvious now and
were not then. Writing a separate LLM-oriented text view of geometry
(ANALYZE-MAP) assumed agents would be doing real CAD work, months before that
was routine. And the MVP closeout's definition of done (real exporter, reimport,
measured topology) is stricter than many commercial CAD test suites. It is the
direct ancestor of the Assert blocks in today's language.
What survives
Aetheris.Kernel.Firmament/FirmamentV2(parser, binder, lowering)- The four AIR-FIRMAMENT-A2 design documents and the Preview 2 language
reference in
history/firmament/preview2-reference/(kept because tests read them) aetheris analyzemaps and summaries, inline STEP, the Forge descriptor model- LLM CAD strategy notes
Previous: Era 5 · Next: Era 7: Previews 1 to 3