Skip to content

Next Gen STEP AP242 Native-ish BREP Geometric Modeling Kernel

CI: run the full solution's tests in parallel on push and PR; keep serial for release qualification

Claudeae776b26015d
diff --git a/.github/workflows/dotnet.yml b/.github/workflows/dotnet.yml
index 01d45a73..a35c8bfa 100644
--- a/.github/workflows/dotnet.yml
+++ b/.github/workflows/dotnet.yml
@@ -73,10 +73,12 @@ jobs:
- name: Install optional PDF renderer for interoperability tests
run: sudo apt-get update && sudo apt-get install -y poppler-utils
+ # The day-to-day gate runs test projects in parallel (AGENTS.md); release qualification keeps the serial
+ # lane as its determinism check.
- name: Test full solution
env:
AETHERIS_TEST_PDFTOPPM: /usr/bin/pdftoppm
- run: dotnet test Aetheris.slnx --configuration Release --no-build -m:1 -- RunConfiguration.MaxCpuCount=1 xUnit.ParallelizeTestCollections=false
+ run: dotnet test Aetheris.slnx --configuration Release --no-build
- name: Qualify portable CLI package
shell: pwsh
diff --git a/AGENTS.md b/AGENTS.md
index 1bb7b8fe..ce3ba383 100644
--- a/AGENTS.md
+++ b/AGENTS.md
@@ -65,6 +65,8 @@ The full lane runs test projects in parallel; that is the day-to-day gate. Never
as verified on the fast lane alone - it omits the corpus-driven tests, which are the ones that
catch interchange regressions.
+CI runs the parallel lane on every push and pull request; release qualification runs the serial one.
+
The serial lane is an optional determinism check, not a daily gate. Run it when a change touches
shared static state (caches, memos, ambient context), test isolation, or ordering, or when a
parallel-lane failure looks order-dependent: