fix(electrical-engineer): address review on worked examples and rule guard

ayobamiseun226907db6a3e
diff --git a/engineering/engineering-electrical-engineer.md b/engineering/engineering-electrical-engineer.md
index 922d89b5..bb490e00 100644
--- a/engineering/engineering-electrical-engineer.md
+++ b/engineering/engineering-electrical-engineer.md
@@ -176,7 +176,7 @@ DESIGN BASIS: autonomy 8 h at full equipment load; ambient 15 °C minimum in bat
Total plant current ....................... 175.8 A
Module rating 50 A @ 53.5 V ............... 175.8 / 50 = 3.52 → 4 modules
N+1 ....................................... 5 modules installed, 6-slot shelf
- AC input per module at 95 % eff, PF 0.99 .. 2.85 kVA; plant AC demand 14.2 kVA (4 running)
+ AC input per module at 95 % eff, PF 0.99 .. 2.85 kVA; plant AC demand 14.2 kVA (5 modules at full output)
4. RESULT
Battery: 2 x 500 Ah (C8) strings, 48 V, with temperature-compensated float
@@ -190,14 +190,14 @@ Requires review and sign-off by a licensed electrical engineer before procuremen
```
FEEDER: battery/rectifier bus → equipment DC distribution, TWR-0427
-STANDARD: IEC 60364-5-52:2009 Table B.52.4 (ampacity), project spec max 1.0 V drop on this feeder
+STANDARD: IEC 60364-5-52:2009 Table B.52.2 (ampacity, PVC, two loaded conductors), project spec max 1.0 V drop on this feeder
INPUTS: I_design = 81.5 A (end of discharge, Deliverable 1)
one-way route length L = 25 m, copper, PVC, installation method C, ambient 35 °C
resistivity ρ = 0.0225 Ω·mm²/m (copper at 70 °C operating temperature)
STEP 1 — AMPACITY
- 35 mm² Cu PVC, method C, 2 loaded conductors ....... 119 A (Table B.52.4, column 4)
- Ambient correction 35 °C (Table B.52.14) ........... x 0.94 → 112 A ≥ 81.5 A ✔ passes
+ 35 mm² Cu PVC, method C, 2 loaded conductors ....... 138 A (Table B.52.2, column 6)
+ Ambient correction 35 °C (Table B.52.14) ........... x 0.94 → 130 A ≥ 81.5 A ✔ passes
STEP 2 — VOLTAGE DROP (two-conductor DC circuit)
Vd = 2 x I x L x ρ / A
@@ -206,7 +206,7 @@ STEP 2 — VOLTAGE DROP (two-conductor DC circuit)
95 mm²: 2 x 81.5 x 25 x 0.0225 / 95 = 0.97 V ✔
STEP 3 — PROTECTIVE DEVICE
- DC fuse/breaker 100 A (≥ 81.5 A design, ≤ 95 mm² derated ampacity 233 A x 0.94 = 219 A) ✔
+ DC fuse/breaker 100 A (≥ 81.5 A design, ≤ 95 mm² derated ampacity 258 A x 0.94 = 243 A) ✔
Minimum fault at far end must exceed the device's instantaneous trip: verify with IEC 61660
once the battery internal resistance is known (MISSING from battery data sheet).
@@ -228,8 +228,9 @@ AC LOAD SCHEDULE (running)
Running load ........................... 20.7 kVA
MOTOR STARTING
- Largest compressor LRA 6 x FLA (ASSUMED, no nameplate in survey) → +12.5 kVA transient
- Peak with one compressor starting ...... 33.2 kVA for < 1 s
+ Largest compressor 2.5 kW at PF 0.85 ... 2.94 kVA running
+ LRA 6 x FLA (ASSUMED, no nameplate in survey) → start adds 5 x 2.94 = 14.7 kVA transient
+ Peak with one compressor starting ...... 20.7 + 14.7 = 35.4 kVA for < 1 s
DERATING (site 1,400 m, 40 °C)
Altitude: 3 % per 300 m above 1,000 m .. 4 %
@@ -240,7 +241,9 @@ SELECTION
Target steady-state loading 50–75 % of prime rating (avoids wet stacking below 30 %)
Prime rating required ≥ 20.7 / 0.75 / 0.96 = 28.8 kVA → 30 kVA prime
Derated capacity 30 x 0.96 = 28.8 kVA; steady-state loading 72 % ✔
- Starting 33.2 kVA = 115 % for < 1 s: within class G2 transient tolerance per mfr curve ✔ (confirm)
+ Starting 35.4 kVA = 123 % of derated rating for < 1 s: verify against the manufacturer's
+ motor-starting kVA curve for ISO 8528-5 class G2 (transient voltage dip ≤ 20 %);
+ if the set cannot hold the dip, specify soft starters on the compressors (confirm)
ATS: transfer ≤ 10 s; rectifier ride-through on battery covers the gap ✔
OPEN ITEMS: compressor nameplate LRA (MISSING), fuel tank autonomy requirement (MISSING)
@@ -253,7 +256,7 @@ Rules a platform can enforce on every submitted site record. Each failure return
| Rule | Check | Severity | Reference |
|------|-------|----------|-----------|
-| PWR-001 | Every load entry has a value, a unit (W, kW, VA or kVA) and a power factor if AC | BLOCK | IEC 60364-5-52 §525 |
+| PWR-001 | Every load entry has a value, a unit (W, kW, VA or kVA) and a power factor if AC | BLOCK | data quality |
| PWR-002 | kW and kVA are never summed; AC demand is computed through PF | BLOCK | basic |
| PWR-003 | Battery capacity record includes Ah, C-rate hours and end voltage per cell | BLOCK | IEEE 485 §6 |
| PWR-004 | Autonomy computed from average discharge current, with ageing ≥ 1.25 and a temperature factor | BLOCK | IEEE 485 §6.3 |
@@ -332,7 +335,7 @@ def rule_pwr_001(a: SiteAssessment) -> list[Finding]:
"PWR-001", "BLOCK",
f"Load '{item.name}' has unit '{item.unit}' with no resolvable real power "
"(VA/kVA needs a power factor).",
- "IEC 60364-5-52 §525",
+ "data quality",
))
return out
@@ -354,7 +357,8 @@ def rule_pwr_003(a: SiteAssessment) -> list[Finding]:
def rule_pwr_004(a: SiteAssessment) -> list[Finding]:
b = a.battery
- if b is None or b.capacity_ah is None or a.autonomy_required_h is None:
+ if (b is None or b.capacity_ah is None or b.rate_hours is None
+ or b.end_volts_per_cell is None or a.autonomy_required_h is None):
return [] # PWR-003 already reports the gap
if a.avg_discharge_volts is None:
return [Finding("PWR-004", "BLOCK",
diff --git a/scripts/convert-outputs.sha256 b/scripts/convert-outputs.sha256
index 6405f145..491feb10 100644
--- a/scripts/convert-outputs.sha256
+++ b/scripts/convert-outputs.sha256
@@ -76,7 +76,7 @@ agent drupal-performance-engineer 772c9f1282e7776b3f28ab3a6b830a0260b6de4f814f91
agent drupal-shopping-cart-engineer 00b3e2a42434e2d6fd19f8055e61162ba503e3a71a63597891ec7b91710f385f
agent dx-engineer 2a966b23d47604b36dbbf2ce746ca69dab1a3be9116537fa0ef625346f1572d9
agent economy-designer 359a80ea6bbd1c10a23d9f0acfdc045a5ae77aaadbb38c7ecc2a08e2b0ee4cf3
-agent electrical-engineer 9f3b73fc9494e3e97ab4f62863f385a62c14ba774e8bfda054ec9ee06467a5ff
+agent electrical-engineer 923b3be35484ac53493ae5464071121997d8f94ac15a8635186981c4e4f2e805
agent email-intelligence-engineer 712b5d0695cfefa6143f4d8cad2db70bf9cb082c41c5b83c09b31ae82a5d8967
agent email-marketing-strategist a0f8db4f46c40da8ba1fa794159f1a4f3aaa9b6efee10169e08dd5bc62d514ab
agent embedded-firmware-engineer e5b817672f17363f2eef45524ccca5495fb0b5a5c959fa527e59b7d82ad8e39a