Turn any idea, plan, or codebase into a beautiful interactive diagram. An agent skill for Claude Code, Codex, and more.
Main integration verification — 2026-09-11
Historical proposal/evidence: Atlas is deferred and is not included in the current Skill or CLI. Atlas paths and commands below describe the earlier implementation; they are not current usage instructions. Sequence readability improvements remain enabled.
Integrated upstream 8c3af8a11318d3e0f46bb123149c4863d358f830 into PR #362,
retaining the original 43abaa4 commits. Upstream extracts Viewer maintenance
sources into viewer/ and refreshes sponsor content. The PR's atlas runtime,
CLI, sequence metrics and browser readability implementation remain unchanged.
The five conflicts were generated artifacts: archify.zip, README showcase
GIF/receipt, Gallery HTML and Gallery manifest. They were rebuilt from the
combined source rather than selecting one side's generated bytes. Both packaged
and repository examples were regenerated; the assembled Viewer freshness check
passed. Gallery validation reports 11 artifacts and 99 checks. The ZIP uses the
canonical Node 22 toolchain.
Fresh focused CLI/sequence tests: 12 passed. Fresh real Chrome tests: 4 passed
across atlas-browser.test.mjs and desktop-reader-browser.test.mjs. These
exercise offline detail entry/choice, return camera/focus, theme synchronization,
icons, canonical SVG export, intentionally unreadable messages, four desktop
sizes, all packaged examples and production architecture readability.
Fresh perceptual review: light and dark captures were inspected after the integration at 2048×1320. The graph remains contained, labels and navigation controls are visible, and the source's authored topology is retained. These captures are bounded fixture evidence, independent of the earlier before/after comparison.
The full-suite result and final merge identity are recorded in the PR's Tests run section. Remote CI is independent of these local checks.