Backend test execution time

Status: in progress

Scope

Cut the execution time of go test ./backend/.... It takes 14–19.5 minutes in CI and has grown 54% since May (p50 10.2 → 15.7 min).

Runner capacity and queue time are out of scope. The self-hosted VM exists because the Bytebase binary is expensive to build, and the warm Go build cache is the point.

Measurements

Everything below is one local pass of go test -p=8 -json ./backend/... on 20 vCPU / 31 GB with warm build and image caches. The run this design started from finished in 14 m 19 s, with individual package wall times summing to 3180 s, so packages overlapped about 3.7×. Those are the numbers the efforts were sized against; see "Where it stands now" for what the same command costs today.

Per-operation costs are means of 5 sequential runs:

Operation Cost
MySQL container start 10 420 ms
Postgres container start 4 328 ms
Server shutdown 1 047 ms — 1 036 of it httpServer.Shutdown
Server boot 703 ms — CREATE DATABASE 39, NewServer+LATEST.sql 381, serve/healthz/signup/login 266

A Postgres container costs 6.2× a full server boot, and a boot's own teardown costs more than the boot. GetTestPgContainer has no pooling, so every call is a new container. The suite makes roughly 400 Postgres containers, 37 non-Postgres ones, and 207 server boots per run. The non-Postgres and boot counts are exact; the Postgres count is approximate, because docker events caught 297 creations but only started recording after two dozen packages had finished.

What that costs each package

Four packages run their tests serially: store, migrator and component/review never call t.Parallel(), and api/v1 calls it 8 times across 350 tests. Their test time and wall time match to within 1%, so their container cost is wall clock.

Package Tests Containers Container time Wall Share of wall
backend/store 128 90 390 s 459 s 85%
backend/api/v1 350 100 433 s 540 s 80%
backend/migrator 18 16 69 s 90 s 77%
backend/component/review 53 41 178 s 282 s 63%

Those shares are arithmetic, not estimates. Remove a container start in one of those packages and you remove a second of its wall clock.

The two other expensive packages have to be read differently:

  • backend/tests — 635 s wall. It calls t.Parallel() 203 times and runs about 3.7× parallel inside, so costs overlap. Its fixtures come to roughly 812 s of work (104 containers, plus 207 boot-and-shutdown cycles), which compresses to about 220 s of its wall.
  • backend/plugin/schema/oracle — 315 s wall, and fixtures are not the story here. Its container starts in 14 s. The other 273 s is DDL work against a real Oracle.

Where it stands now

Same command, same box, with efforts 1, 2, 6 and 7 partly landed: 272 s (4 m 32 s), package walls summing to 736 s and overlapping 2.7×. Every package passes.

Package Then Now What moved it
backend/tests 635 s 174 s effort 1, then effort 2's t.Parallel()
backend/api/v1 540 s 43 s #21349, a shared Postgres — not this design
backend/store 459 s 12 s effort 2, both steps
backend/plugin/schema/oracle 315 s 78 s #21344 goldens, #21351 shared container
backend/component/review 282 s 17 s #21349
backend/migrator 90 s <2 s effort 6, by deletion

Two rows are worth reading twice. api/v1 fell 12× without anyone writing a fake, which removes the wall-clock argument for effort 6 — the case for seams there is now about what the tests say, not what they cost. And plugin/schema/* as a whole went from 475 s to 164 s, plugin/db/* from 339 s to 145 s, which shrinks effort 7 from the largest item here to a middling one.

Second pass: 189 s to 152 s

Same command, same box, measured again on 2026-09-06 after everything above had landed: 189 s, package walls summing to 620 s and overlapping 3.3×. Five changes later it is 152 s, walls summing to 654 s and overlapping 4.3×. Every package passes, api/v1 also under -race.

What the measurement found, what changed, and what it bought:

Finding Change Measured
backend/tests was scheduled last. ./backend/... expands alphabetically, so it got its first -p=8 slot at +93 s and ran alone from +125 s. CI lists ./backend/tests ./backend/api/v1 ahead of ./backend/...; go test keeps command-line order and drops duplicates. 189 s → 147 s on a cold cache, before any other change.
waitDBPing waited on a 3 s ticker before its first ping, and a container is pingable 13 ms after GenericContainer returns. Ping first, then poll every 100 ms. Postgres start 4.33 s → 1.33 s; backend/tests alone 97 s → 79 s, its summed test time 1215 s → 953 s.
Parallel subtests only get a slot once every top-level test has started, so the action command cases and the database group cases ran last, at one to eight concurrency, for the package's final 25 s. Flattened into top-level tests. The tail is gone; TestWebhookIntegration, 43 s from a first slot at about +18 s, is now the package floor.
plugin/db/pg started nine containers, serially. One shared container, a database per test with roles named after it, t.Parallel(). 53 s → 7 s.
api/v1 ran 336 tests serially, and four of them were 27 s of its 38 s. t.Parallel() on 263 tests: 217 without subtests, 46 table-driven ones at both levels, 3 slow parents under //nolint:tparallel. Six stay serial for t.Setenv, 62 with sequential subtests stay serial. 41 s → 25 s inside the full run.

Two suspects were measured and cleared. The 5 s tickers in the plan check, task run and review run schedulers all have tickle channels that the API fires, and forcing them to 300 ms made backend/tests slower, 79 s → 84 s, from sixty schedulers polling Postgres. And TestWebhookIntegration is the longest test at 43 s but no longer the tail; it is the floor of a package whose other 225 tests now fit around it.

What is left of a Postgres start is initdb, about 1.25 s, and backend/tests still pays it 161 times. An image with the data directory already initialized was tried: a container answered in 0.18 s and the run came in at 140 s, but a docker build inside the test helper is more machinery than the 12 s it bought, and it is not in. The way to take those starts out is the one plugin/db/pg and the metadata packages use, one container per package and a database per test, with one caveat: a Bytebase instance syncs every database on its server, so the tests that assert on an instance's database list keep a server of their own.

Measured standalone after all of it, backend/tests is 75.2 s against 97.1 s, with 1139 s of summed test time against 1215 s.

The gate has moved again. With backend/tests finishing at +122 s, the run's last 30 s are plugin/schema/oracle alone. It still sorts into the alphabetical part of the list, starts at +74 s and takes 77 s under contention: 13 subtests of 4.4 s of Oracle work each, on an engine capped at two threads, so Go-side parallelism buys at most 2×. Listing it ahead of ./backend/... as well takes that tail off the run; shrinking the package is effort 7's business.

One race surfaced under the heavier overlap, in TestWebhookIntegration's completion cases. They provisioned databases, reset the collector, and only then registered the PIPELINE_COMPLETED webhook, trusting that the creation rollouts' completions had already been delivered. They had not necessarily: the running scheduler marks the task DONE, which is what createDatabase waits on, before it emits the completion event, so a webhook registered in that gap still received it and the assertion of zero completions failed once in about ten runs. createDatabasesFlushingCompletion now registers the webhook first, waits for one completion per database, and discards them.

One hazard to know about. Two back-to-back heavy runs failed container starts with failed to bind host port 0.0.0.0:49xxx/tcp: address already in use. Docker publishes ports from the same 32768–60999 range the kernel hands to outgoing connections, and twenty servers' clients hold many of those. It shows in none of the CI logs checked, but it scales with throughput; a runner that starts seeing it should move one of the two ranges apart.

Third pass: 130 s, and every container in one place

2026-09-12, same box, the command CI runs with -count=1: 130 s, walls summing to 469 s and overlapping 3.6×, backend/tests 118 s of it.

Every engine container now starts inside backend/common/testcontainer and is shared per package — plugin/db/mongodb 12.9 s to 6.3 s, three containers to one; plugin/db/tidb 5.1 s to 4.4 s; the pg17, TLS-Postgres and sample targets onto the same machinery. The Oracle container, unused since #21356, is deleted, and the per-test GetTest*Container helpers with it. Effort 4 then took the run to 120 s, the package to 107 s.

Then the target Postgres went the same way. backend/tests was starting 162 of them, one per test, because a container it registers as an instance is a whole server whose databases the syncer enumerates. Instance.sync_databases is what lets one server carry many instances — the syncer imports only the databases the list names, which is how Sample Project Instance already shares one target across workspaces — so a test now takes a database of its own on one shared target and the instance it registers names that database. 173 Postgres containers across the run became 31 and the run 1 m 56 s became 1 m 39 s. Seventeen provisions stay private: the tests that create a cluster-wide role, the two that need separate servers to hold the same database name, and the one whose subject is two instances discovering the same physical postgres database. One server for twenty parallel tests also needs a raised max_connections; at the default 100 the failure reads "server refused TLS connection", which names neither the limit nor the cause.

The two share a package, so they were measured as a 2×2 rather than in sequence — standalone backend/tests, one box, the same code with one toggle each:

a server per test one server
a container per test 87.9 s 76.0 s
one target container 77.4 s 55.3 s

Each is worth about 11 s alone (effort 4 −11.9, the shared target −10.5) and 32.6 s together, so the pair beats the sum of its parts by 10 s. Neither cost is the container or the boot itself: it is that a test spends that second holding a parallel slot, and removing one of the two just moves the queue to the other.

The floor

backend/plugin/... cost 866 s across 69 packages at the start, and split by who owns the code: plugin/schema/* was 475 s in 6 packages, plugin/db/* 339 s in 18. The other 45 packages — pure parser and advisor tests, no containers — came to 51 s. Parsing is not what costs; engines are. Today the same 70 packages come to 358 s.

What any of this buys follows one rule:

wall ≈ max( slowest single package , sum of package walls ÷ overlap )

It reproduced the starting run — max(635, 3180 ÷ 3.7) is 859 s against an actual 859 s — and it reproduces the current one: max(174, 736 ÷ 2.7) is 273 s against an actual 272 s. Treat the overlap factor as an observed property of a given schedule, not a constant.

The gate has moved, and that is the most important thing on this page. The run used to be bound by its slowest package, so only backend/tests was worth attacking. It is now bound by the sum term: 736 s of work over an overlap of 2.7, with the slowest package at 174 s and nowhere near binding. Every second removed anywhere now buys about 0.37 s of wall, and no single package is the gate. That makes the remaining efforts additive rather than a queue behind one package — and it makes work outside backend/tests worth doing again.

Design

Six efforts. The numbering is the order they were written in, kept so existing references resolve, and it is no longer the order of payoff — effort 3, a checkout pool for the 104 provisionPgInstance callers, is dropped outright, and four of the rest have been re-sized since. Read the sizing line at the top of each section, not its position.

What changed is that effort 2's second step overtook everything else. Adding t.Parallel() to 34 tests took backend/tests from 615 s to a median 173 s on its own — more than efforts 1, 4 and 5 together were ever projected to buy — and by making the run sum-bound rather than bound by one package it changed what the others are worth. Efforts 4, 6 and 7 deflated: their costs now overlap, or were already collected by work that landed outside this design. Effort 5 did not, because deleting a test removes work instead of moving it.

The standing order, by what is left rather than by number:

Effort Worth
1 6, seams instead of containers seconds; do it for the tests, not the clock
2 7, engine conformance to omni 14 s; do it for ownership, not the clock

Three entries have left this list. Effort 4 is done, and beat its own re-sizing; see its section. Effort 5 is done — and was worth less than the ~320 s it was sized at, because a third of that number was TestSQLReviewForMySQL, which was not the duplicate the sizing assumed; see its section. TestWebhookIntegration was second at 148 s until #21355 fixed the scheduler stall underneath it and took it to 45 s, which is the largest single saving on this page and came from a production bug rather than a test change.

[✓] 1. Close idle connections before shutting the server down

Three lines. httpServer.Shutdown burns 1036 ms on every one of the 207 boots. It is waiting out an idle HTTP/2 connection that nobody will reuse: the test client's http2.Transport is never closed. Runners exit in 0 ms.

func (ctl *controller) Close(ctx context.Context) error {
    if ctl.client != nil {
        ctl.client.CloseIdleConnections()
    }
    ...
}

Measured, not projected. With those three lines applied, shutdown drops from 1047 ms to 1 ms, and a full boot-and-shutdown cycle goes from 1750 ms to 676 ms. Across 207 boots that is ~217 s.

That 217 s is part of effort 4's total, not on top of it. This goes first only because it is three lines and needs no restructuring, and it stops mattering once effort 4 collapses the boot count.

What it bought. Over 5 cycles the shutdown went from 1058 ms to 1 ms and the boot-and-shutdown cycle from 1720 ms to 691 ms, as projected. A package-isolated go test ./backend/tests/ — not the full-suite figure above — went from 679 s to 611 s across its 233 boots: 227 s off the summed test time, compressed 3.3× by the package's own parallelism. Measure the efforts below against 611 s.

[✓] 2. One shared container per package, then turn parallelism on

459 s of wall clock, 390 s of it container starts. store starts 90 containers, and because it runs serially that cost is its wall clock almost exactly.

api/v1, component/review and migrator were in this effort's original scope. Effort 5 confines a real metadata Postgres to store and tests, so all three move to effort 6 instead.

Two changes, in this order:

  1. Give each package a TestMain that starts one Postgres and migrates a template database once. Each test then gets its own database with CREATE DATABASE … TEMPLATE. backend/tests/main_test.go is the reference.
  2. Add t.Parallel(). Sharing the container is what makes parallelism affordable: a 44 ms database copy can run concurrently in a way a 4.3 s container start cannot.

Measured on the migrated Bytebase schema (9.5 MB): migrating the template costs 309 ms once, a plain CREATE DATABASE is 32 ms, and CREATE DATABASE … TEMPLATE is 44 ms — 98× cheaper than the 4328 ms container it replaces.

One detail. Close the template connection after migrating, because TEMPLATE refuses to copy a database that still has a session attached.

This section originally called for api/v1 to share a Postgres "rather than using a fake store". Effort 6 reverses that.

Expect tests that silently assumed a virgin database to fail. That is the point. Fix them with per-test databases, not with cleanup hooks — those reintroduce ordering coupling.

Step 1 alone takes store from 459 s to roughly 75 s. Step 2 should take it below that; what remains is real work across 128 tests.

What it bought, measured on one Mac, same tests both sides. backend/store went from 382.95 s to 12.0 s — 90 container starts down to 1, and 20 files off GetTestPgContainer. main_test.go holds the whole mechanism in one helper: newTestDB returns a raw handle for seeding, a Store for the code under test, and the URL for tests that open their own connections, all on a database copied from the template.

The copies are never dropped, deliberately. They are physical — 140 tests hold roughly 1.3 GB — but they live inside the package's own container, which TestMain terminates on the way out, so the space comes back with it. Dropping each database costs about 54 ms, or 7 s across the package, to reclaim disk that is already reclaimed.

What step 2 bought, measured on one Linux box (20 vCPU), same tests both sides. t.Parallel() on all 139 tests took backend/store from 16.2 s to 10.9 s, means of runs spanning 16.0–16.3 and 10.8–10.9. Those are not the 12.0 s above; that was the Mac. Two things that would have blocked this were checked first and held: Postgres advisory locks are per-database, so the lock and claim tests cannot reach each other across per-test databases, and eight concurrent CREATE DATABASE … TEMPLATE from one template all succeed.

What is left is nearly all floor. The package costs 1.3 s with no container at all and 6.9 s for a single test that needs one, so 5.6 s of the 10.9 s is the one container start and template migration that every test now queues behind inside metaOnce. Subtracting that 6.9 s from each side, the 138 other tests' own work went from 9.3 s to 4.0 s. Nothing further is worth spending here: the next second has to come off the container, not off the tests.

Nine tests keep serial subtests, and two of them give up top-level parallelism for it. TestAuditLogRetentionFilteringEndToEnd sets one workspace license row per subtest and reads it back, and TestLoginAttemptClaim's purge subtest asserts a table-wide delete count that only holds while nothing else writes the table; both carry a comment saying so. The other seven parallelize at both levels because their subtests are keyed apart — distinct identities, codes, token hashes — or take a database each. tparallel enforces all-or-nothing per test, which is why those two go serial rather than parallel with serial subtests.

Peak concurrent connections to the shared container is 38 against Postgres's default 100, at -parallel=20. A runner with many more cores should have that re-measured before it is trusted.

Step 2 again, in backend/tests, and this is where the package was hiding its time. 175 of its 209 tests already called t.Parallel(). The other 34 never did, and they summed to 483.7 s — 79% of the package's 614.7 s wall, running strictly one at a time, because Go defers parallel tests to the end and runs everything else back to back. The 175 that did were compressing 1717.7 s into about 131 s, a 13× overlap. The machinery was already there; a fifth of the tests were not using it.

Adding t.Parallel() to those 34 — one line each, no other change — takes the package from 614.7 s to a median 173 s, over ten runs spanning 155–236 s with no failures. The spread is real: twenty concurrent servers is a noisy schedule, and the worst run is still 2.6× better than the best serial one.

Almost nothing structural was in the way. 32 of the 34 boot a server, and each already gets its own server, workspace and database, so there is nothing to share. One exception, and it is the interesting one: webhook.TestOnlyAllowedDomains is a plain map in plugin/webhook that TestWebhookIntegration wrote and deleted, while ValidateWebhookURL reads it unsynchronized on behalf of every other test that adds a webhook — and two of those were already parallel. Concurrent map access is fatal to the process, not merely racy. TestMain now seeds it once for SLACK and DINGTALK and nothing mutates it afterwards.

The lesson generalizes past this one map: grepping the package for shared state is not enough, because the shared state can live in the package under test. A ^var sweep of backend/tests finds nextPort and friends and reports all clear. What it cannot see is a test reaching into another package's global. When turning parallelism on, follow the writes out of the test package as well. Every piece of package-level state is already guarded — nextPort and nextDatabaseNumber behind mu, externalPgHost/Port written once in TestMain and read-only thereafter — and the package has no t.Setenv or t.Chdir anywhere, either of which would panic under t.Parallel(). Of the 34, exactly one contains a time.Sleep and it is inside a comment: waitForWebhookCount replaced it with a poll-until-deadline. The two explicit deadlines are 5-minute context timeouts against tests that run in about ten seconds.

Ten of the 34 have subtests, and tparallel's all-or-nothing rule forces a choice on each. Two of them — the account email validation pair — boot a server inside every subtest, so their subtests are independent and now run parallel too. The other eight boot one server in the parent and drive it through the subtests in order, which is backend/tests's existing //nolint:tparallel // Subtests share one server lifecycle. case; each now carries that directive with its own reason. Note what this does not cost: the parent stays parallel with the rest of the package either way, and that is where the entire saving came from.

TestWebhookIntegration was the package floor at 148 s. #21355 then took it to 45 s by fixing the task run scheduler stall, so it no longer dominates; the paragraph below described the state before that landed. At 148 s it was most of the 173 s, and the rest of the package finishes around it. It is the one place left in backend/tests where a single test is worth attacking on its own.

[✓] 4. Isolate per project, not per workspace

237 server boots down to 109, backend/tests 83–90 s to 71–77 s standalone, its summed test time 1954 s to 1765 s. Project is Bytebase's tenancy boundary, so it is the test boundary: startProject takes a project on the package's one server (113 call sites), startWorkspace takes a server, and so a workspace, of its own (102).

What forces a workspace is wider than the settings files this section first listed, and every item came back as a failing test rather than a prediction: the MCP capability ceiling and the license, the demo principal's password and MFA, removals from the workspace IAM policy — grants are additive, but SetIamPolicy writes the whole policy, so a grant that read before a removal and wrote after resurrects the binding — any workspace-wide list or count assertion, and workspace-scoped resource IDs, where instances collided on generateRandomString("inst")[:8], a prefix plus three hex characters. One conflict was worth fixing in the helper instead: addMemberToWorkspaceIAM re-reads and re-applies on the etag conflict the server tells it to retry, which keeps all sixteen granting files on the shared server.

The re-sizing to ~7 s of wall held for the run and understated the package, because the boots also set the memory ceiling on -parallel. What is left is the floor: TestWebhookIntegration, 48.7 s of a 73 s package, 24 sequential subtests behind one boot.

[✓] 5. Postgres only for backend/store and backend/tests

Done, and the headline example in the original sizing was wrong. This section said TestSQLReviewForMySQL cost 52.7 s where TestSQLReviewForPostgreSQL cost 17.9 s "for the same assertion". They were not the same assertion: sql_review_mysql.yaml held 21 cases against sql_review_pg.yaml's 9. Deleting it as a duplicate would have dropped real rule coverage.

The principle that resolved it is sharper than the one written here. backend/tests tests workflows; engines belong to the layer that owns them. Sorting the expensive tests by that rule gave four outcomes rather than one:

  • Same workflow run twice. Five tests had literally mirrored cases — "MySQL - Second statement fails" beside "PostgreSQL - Second statement fails" — for behavior that is ours, not a dialect's. MySQL arm dropped, one unique case ported: 127.9 s → 59.9 s.

  • MySQL-only, engine incidental. Three tests about data source resolution and masking, ported to Postgres. The translation was not mechanical — Postgres grants are per object, BIN_TO_UUID became a uuid cast, and the catalog needed a public schema.

  • Engine wearing workflow clothing. TestSQLReviewForMySQL was rule coverage in the wrong place: of the 41 rules its fixture asserts, 39 have a file under plugin/advisor/mysql/test carrying real want: expectations, and TestMySQLRules drives ~60 rules through them with no container, in 2.3 s. Two did not, and checking that the file merely exists would have missed it. RunSQLReviewRuleTest builds its context with Driver: nil, so the two rules that need a live EXPLAIN — STATEMENT_AFFECTED_ROW_LIMIT and STATEMENT_DML_DRY_RUN — have yaml files holding statements and no expectations at all. The first is covered anyway by two driver-backed tests against a fake database/sql EXPLAIN driver; the second was not, so deleting the workflow test would have dropped its only coverage, and TestMySQLDMLDryRunAdvisor was written against that same fake driver to replace it. Deleted, with TestSyncerForMySQL (its Postgres twin sits in the same file) and TestGetLatestSchema's MySQL arm (it asserted a literal dump, including MySQL's SET @OLD_UNIQUE_CHECKS preamble). TestTransactionMode is deleted, 41 s. It had four engine cases whose expectations were identical — expectRollbackOn was true in all four and skipTransaction was never set, so both fields that existed to express engine variation were dead, along with two unreachable branches.

    This leaves a known gap, recorded here rather than left silent. Nothing now covers the execution half of the -- txn-mode directive: executeInTransactionMode and executeInAutoCommitMode appear in no test, so txn-mode = on could stop wrapping and every test would stay green. Parsing is still covered by plugin/parser/base. Anyone reintroducing coverage should guard the mode switch on one engine, and the case actually worth an engine matrix is DDL inside txn-mode = on, where MySQL and Oracle implicitly commit and defeat it — which is the reason the directive exists, and which no version of the deleted test ever covered.

  • Engine is the workflow. TestGhostSchemaUpdate and TestGitOpsRolloutGhostDirective keep MySQL, and now say why in a comment: gh-ost is MySQL-only. TestActionCheckCommand_DeclarativeCheckWithDatabaseGroup keeps it too — the port was tried and reverted, because the declarative check returns three errors against the same schema on Postgres. Worth chasing separately.

MySQL in backend/tests is now those three tests and nothing else.

Unlike effort 4, this one did not deflate. Deleting a test removes work rather than moving it, and the run is now bound by the sum term, so the 320 s converts at the whole-run rate of about 0.37 s of wall per second removed — roughly two minutes off the suite. That makes this the largest remaining item on the page.

Two packages may hold a real database, and no others. backend/store is where a metadata query is asserted against one, and backend/tests is the only package that boots a server. Everywhere else — api/v1 above all — the handler's decide-and-convert half is tested over a fake or over plain data, which is effort 6; an API test does not earn a container by being an API test. Inside the two packages that keep one, the engine is Postgres: engine dialects and DDL fidelity belong in omni. The root AGENTS.md carries that second half of the rule today, in the words "test API and workflow behavior against Postgres only".

docker events recorded 11 MySQL containers from backend/tests when this was written. Each of those twelve candidate tests is accounted for above; the one that is not is TestActionCheckCommand_DeclarativeCheckWithDatabaseGroup, which keeps its container.

The original plan here said "where a Postgres equivalent proves the same workflow, delete the MySQL copy". That held for TestSyncerForMySQL, whose twin was already in the same file. It did not hold for TestSQLReviewForMySQL: the copy was not equivalent, and the thing that made it deletable was finding the coverage a layer down rather than a layer across. Check the layer below before calling a test a duplicate.

6. Seams instead of containers

Re-sized: the seconds are already gone, the argument is not. This section was written against 822 s of wall clock, 611 s of it container starts. #21349 then gave api/v1, component/review, auth, oauth2, lsp and mcp a shared Postgres through testcontainer.NewMetadataDB, and those two packages went to 43 s and 17 s without a single fake being written. All six now sit within a couple of seconds of the 6.9 s floor that a package holding one container cannot go below, and api/v1 is 43 s of which about 36 s is its own tests.

So do this for what the tests say, not what they cost. A container in api/v1 still buys a *store.Store that the assertions never look at, and effort 5 still says the metadata database belongs in store and tests. The classification below stands; only the payoff line has changed. backend/api/mcp remains the proof it is livable: 168 tests in 19 s, 16 of its 18 files containerless.

Effort 2 declined a fake store on two grounds, and both fail here. api/v1 is not testing its API — mcp_info_test.go called service.GetMCPInfo as a Go method, so the container bought a *store.Store and nothing the test asserts. And "a fake store" was the wrong unit: store.Store has 305 methods and api/v1 calls 181, but api/mcp needed five (serverStore, faked in 62 lines) and mcp_gate.go needed one (mcpSettingsReader). Interfaces go beside the handler that reads them, never over the store.

Fourteen files in api/v1 start containers, 90 tests, classified from their bodies:

Disposition Tests Shape
Move to backend/store 18 the 7 lockout and claims tests, 6 concurrency and transaction tests, 2 retention-filter boundaries, TestIssueApprovalFiltersRunBeforePaging
Replace with a fake 66 canonical-name assertions through real services, the list-and-hide tests, validation rejections, TestGetMCPInfoHandler, TestApproveIssueFailsClosedWhenIAMLookupFails
Pure function over plain data 6 TestExtractDomain, TestLDAPLoginIdentity, the MFA temp-token shapes

The last two rows are one boundary, not two: a fake test becomes a pure one as soon as its decide-half is extracted, so 66 is a ceiling on the fakes and 6 a floor on the pure functions.

The rest of backend/api adds 14, all fakes — oauth2 6, mcp 5, auth 2, lsp 1. oauth2's consent-ceiling tests seed five workspaces and their MCP settings in raw SQL to exercise one ceiling read each. The 6 pure tests need no work: verified by call closure, none reaches a container.

Outside api/, seven more packages hold a metadata Postgres, 73 tests between them, classified the same way by call closure:

Package → store → fake
component/review 12 29
runner/schemasync 5 2
runner/taskrun 5 4
runner/plancheck 1 5
server 2 2
component/recovery 0 5
enterprise 0 1

component/review's 12 are the largest store-bound group anywhere — approval lock ordering, concurrent approvals, staleness races — and share helpers with their own 29, so fakes-first applies there too. runner/schemasync's five hold AdvisoryLockKeySchemaSyncer in a live transaction, which nothing but Postgres can do. plugin/db/* and plugin/schema/* are out of scope: target engines, not metadata, and effort 7's business.

Two places already have the right shape: 39 of backend/store's 140 tests never touch a database (the CEL-to-SQL builders assert generated SQL rather than executing it), and 52 tests across the seven packages above are already container-free.

Prefer the middle row: a handler is fetch, decide, convert, and only the fetch needs a store.

migrator is done, by deletion rather than by moving. TestLatestVersion and TestVersionUnique need no database and stay; the other 16 booted a container each to apply one migration to a hand-built fixture and assert the transform. Moving them to backend/store would have relocated the 90 s, not removed it, so they were deleted outright. The package now runs in under 2 s.

That is 90 s bought at a real price, and the price should be stated plainly: the migration SQL — including irreversible data transforms over customer metadata — now has no test coverage, and no fake can restore it. Anyone reintroducing coverage here should bring back the fixtures against a shared container rather than one per test.

Every fake needs a contract test — one table run against both the fake and the real store — or effort 2's objection is right. Since none of these packages may hold a container, that suite lives in backend/store. No mockgen, no SQLite.

Fakes before moves. The 18 do not move first, because their helpers are shared with the tests that stay: 9 of the 11 helpers the 8 issue tests need are also used by the 27 issue_service_test.go tests bound for fakes, so moving now would duplicate them across two packages. Converting the 27 first lets those helpers diverge naturally, and the 8 then move with helpers of their own. The exception is a file whose tests all move — audit_log_service_test.go had two tests and four file-local helpers, so it moved whole (done: now backend/store/audit_log_retention_test.go, 0.14 s and 0.11 s against 4.3 s each before). Its one unexported dependency, convertToAuditLogs, stayed behind as a pure converter test with no database.

Done anyway, duplication accepted. The 8 issue tests moved to backend/store/issue_service_concurrency_test.go with copies of the 9 shared helpers; api/v1 keeps its own for the 27 that stay, which get rewritten against a fake regardless. All 8 run in 0.04–0.07 s against 4.3 s. Two snags, neither needing a production change: they asserted on IssueService.bus, unexported, so the helper now returns the bus it built; and errDraftIssueNotSubmitted is unexported, but IsDraftIssueNotSubmittedError sits exported beside it.

Five of the 18 call unexported api/v1 methods — getAndVerifyUser, verifyEmailCode, completeMFALogin, getOrCreateUserWithIDP — and cannot move without exporting them. TestLoginAttemptRetentionOutlivesLockouts is not a database test at all; it compares two constants.

Landed for backend/api. auth, oauth2, lsp and mcp hold no metadata Postgres now — about 1.5 s each, mcp 9.6 s of deliberate sleeps — and api/v1 runs in 9 s with 14 tests left on the shared container. No fake was written. The decide-and-convert halves came out as functions over plain data (buildAuditRows, buildV1Plans, linkedIssueForCreate, checkReleaseDatabase, consentRefusalRow), mcp_info_test.go became TestActuatorMCPSetting over the existing mcpSettingsReader, and what needs a live workflow — the OAuth2 grant lifecycle, login lockouts, the sample project instance — joined the tests already in backend/tests. The 14 that stay need state no API can set up: a planted email code, a stale approval snapshot, a sample instance's lifecycle hooks. The seven packages outside api/ are untouched.

Server boots go the same way: mcp_capability_setting_test.go spends 5 of its 7 to read and write one settings row, the saved-query list and filter tests 12, GitOps CheckRelease 11 of 17. Keep the 27 TestCollision* and TestClaim* tests where they are — backend/store/AGENTS.md requires them for a bug class unit tests cannot catch.

7. Engine conformance to omni

Not done, and re-sized again: 14 s, so the clock argument is spent. #21415 took the testcontainer out of plugin/schema and #21429 moved every engine's catalog load onto omni's LoadMetadata, so the seven plugin/schema/* packages cost 14.2 s between them, oracle 0.05 s against the 315 s it opened this design at. Most of the rest is the ~3 s a package pays to start its test binary. plugin/db/* is 100 s and stays — it is our driver — with containers in four packages, each sharing one.

Port it when omni owns the metadata model, because these tests assert engine fidelity and that is omni's to assert. Not to make the suite faster.

The blocker is that the round-trip is expressed in Bytebase's metadata proto (storepb, plugin/schema, store/model), so omni must own the metadata model first. The ownership split above is the plan: all of plugin/schema/* moves, all of plugin/db/* stays, because that is our driver. The figures in the rest of this section are the ones the analysis was done against; the split they describe is unchanged, the totals are in the opening above.

For most engines the metadata model is not the near blocker — omni has no engine to move to. It ships a parser and AST for Oracle and for MSSQL and nothing more, so schema/oracle (272 s) and schema/mssql (51 s) have no destination; both already use omni, but only for the AST their own extractors walk. omni does own a TiDB catalog and deparser, and schema/tidb imports neither. Only pg and mysql delegate, and only in part: pg's SDL diff is a 140-line adapter over omni/pg/catalog, while get_database_definition.go (4855 lines) and metadata_migration.go (2956 lines) are ours; mysql's GetDatabaseMetadata is a 46-line adapter, while its GenerateMigration (1121 lines) is not. Every container test in plugin/schema/* calls one of those Bytebase-owned entry points, so the tests follow the implementation and not the other way round.

What was already omni's is gone. 24 files and 150 tests in schema/pg called omni/pg/catalog directly — LoadSDL, Diff, GenerateMigration — with no Bytebase symbol in them. Read against omni's own pg/catalog suite, all but four of their behaviors were already covered there by more cases and stronger assertions: they matched substrings of the rendered SQL where omni inspects typed migration ops. Two of them could not fail at all — the pair named for EXCLUDE constraints has no EXCLUDE constraint in either fixture. The four genuine gaps went into omni beside the cases they belong with; the rest were deleted rather than moved. That is 3 s of the 403 s this effort is about, which is the measure of how much of the cost sits behind the port rather than beside it.

plugin/db/starrocks (158 s) is gone. Nearly all of it was two testcontainer tests booting the allin1 image — an FE and a BE in one container, with a readiness wait measured in minutes — to assert materialized-view sync and dump round-trip. That is engine fidelity, which belongs in omni, paid for on every PR by every engineer. The two tests and the GetStarRocksContainer helpers were deleted; the package now runs in under 2 s on its remaining unit tests.

[✓] One loose end

action/** was in the workflow's paths filter while the test command never ran the seven test files under action/, so a PR touching only the action CLI ran the whole backend suite and none of its own tests. ./action/... is now on the command: 48 tests, 0.15 s, in the tail behind backend/tests.

Reproducing

go test -p=8 -timeout 60m -json ./backend/... > test.json

# package wall time, descending
jq -r 'select(.Action=="pass" or .Action=="fail") | select(has("Test")|not)
       | "\(.Elapsed)\t\(.Package)"' test.json | sort -rn | head -20

Package wall time is the figure to trust. Summing per-test Elapsed is misleading: parallel subtests overlap, so the sum can exceed the package's own wall time by an order of magnitude — plugin/schema/oracle reports 3666 s of subtest time inside a 315 s package.

Per-operation costs came from a temporary test in backend/tests that timed StartServerWithExternalPg phase by phase, GetPgContainer and provisionMySQLInstance in a loop, plus four slog probes inside server.Shutdown. All reverted.