Summary

Plan List and Plan Detail must derive the Review badge from the same lifecycle inputs. Plan Detail can do this today because it fetches the linked Issue. Plan List cannot because the public Plan response exposes the linked Issue name and approval status, but not the Issue lifecycle status.

Add an output-only issue_status field to Plan, populate it from the Issue that convertToPlans already batch-loads, and pass it to the shared getReviewBadge helper. Also invalidate the Plan List page cache when a linked Issue changes, because Issue status and approval changes do not update Plan.update_time.

This closes both known residual mismatches:

  • A canceled Issue must show Closed, not an approval-derived badge.
  • A done Issue without a rollout and with approval still pending must show Bypassed, not Under review.

Problem

Review status is not a stored Plan field. It is a display projection over four inputs:

linked Issue + Issue status + approval status + rollout existence

The current Plan List projection lacks Issue status:

ListPlans
  -> Plan {
       issue
       approval_status
       has_rollout
       // issue_status is missing
     }
  -> getReviewBadge(issueStatus: undefined)

Plan Detail follows plan.issue with GetIssue, so it has the complete input:

GetPlan + GetIssue
  -> getReviewBadge(issue.status, issue.approval_status, plan.has_rollout)

PR #20372 centralized badge computation and fixed the BYT-9551 case where a rollout exists while approval remains pending. It intentionally left two categories unresolved because Plan List still cannot observe Issue status.

Issue status Has rollout Approval status Plan List today Plan Detail
OPEN true PENDING Bypassed Bypassed
CANCELED false PENDING Under review Closed
DONE false PENDING Under review Bypassed

The second row is BYT-9811. The third row is the other residual divergence documented by #20372.

Current model

Plan

Plan owns the proposed database changes and deployment state:

  • Plan.state is the Plan resource state (ACTIVE or DELETED).
  • Plan.specs are the changes to execute.
  • Plan.has_rollout records whether deployment has started.
  • Plan.issue points to the linked review Issue when one exists.
  • Plan.approval_status is a denormalized summary of the linked Issue approval flow.

Plan.state=DELETED is not equivalent to a closed review. The Plan List already shows that state beside the Plan name. It must not be reused to infer the Review column.

Issue

Issue owns review and workflow lifecycle:

  • Issue.status is OPEN, DONE, or CANCELED.
  • Issue.approval_status is CHECKING, PENDING, APPROVED, REJECTED, or SKIPPED.
  • Issue.draft determines whether the review Issue has been submitted.
  • Issue.plan points back to the Plan for database-change Issues.

Issue lifecycle and approval status are independent. For example, canceling an Issue does not rewrite its approval payload, so a canceled Issue may retain PENDING, APPROVED, or REJECTED.

The database enforces at most one Issue per Plan with the unique (project, plan_id) index. This makes a single linked-Issue summary on Plan unambiguous.

ListPlans as a read model

The stored Plan row does not contain Issue lifecycle state. ListPlans already acts as an aggregated read model:

  1. List Plan rows.
  2. Batch-load Issues by (project, plan_id).
  3. Batch-load Plan check runs.
  4. Batch-load rollout task status counts.
  5. Build the public Plan response.

The linked IssueMessage already contains Status. The value is lost only when the public Plan message is built.

Goals

  1. Make the Plan List Review badge match Plan Detail for the same Plan snapshot.
  2. Preserve Issue lifecycle, approval, Plan resource state, and rollout state as separate model dimensions.
  3. Complete the existing ListPlans read model without adding frontend Issue requests.
  4. Keep one shared badge-precedence function for Plan List and Plan Detail.
  5. Prevent Back navigation from restoring a stale Plan List badge after an Issue action.
  6. Keep the API change additive at the wire and JSON levels.

Non-goals

  • Persisting a combined Review status on the Plan row.
  • Replacing Issue status or approval status with a new lifecycle enum.
  • Changing when an Issue becomes DONE or CANCELED.
  • Changing approval, bypass, rollout-creation, or Plan-deletion behavior.
  • Redesigning the Plan List table or Plan Detail lifecycle UI.
  • Adding Issue filters to ListPlans.
  • Making Plan List poll for external Issue changes while it remains open.
  • Redesigning the current draft/incomplete inference.

Design

Public API

Move the existing top-level IssueStatus enum from proto/v1/v1/issue_service.proto to proto/v1/v1/common.proto, next to ApprovalStatus.

The protobuf full name remains bytebase.v1.IssueStatus, and its numeric values remain unchanged:

enum IssueStatus {
  ISSUE_STATUS_UNSPECIFIED = 0;
  OPEN = 1;
  DONE = 2;
  CANCELED = 3;
}

Both Issue.status and the new Plan field use this shared type:

message Plan {
  // Existing fields omitted.

  // The lifecycle status of the linked issue.
  // Unspecified when no linked issue exists.
  IssueStatus issue_status = 15
      [(google.api.field_behavior) = OUTPUT_ONLY];
}

The field is intentionally raw Issue lifecycle state, not a backend-rendered badge. Clients still combine it with approval_status and has_rollout according to their presentation needs.

Moving the enum avoids two competing status types with the same values. It is wire- and JSON-compatible because the protobuf full name and numeric values do not change. It does change the generated module that exports IssueStatus in TypeScript, so repository imports must move from issue_service_pb to common_pb. Generated-source consumers outside this repository may need the same import update; this source compatibility cost must be called out in the PR. The repository's Buf configuration uses FILE-level breaking rules, so moving the enum may be reported if breaking checks are enabled even though the current proto workflow runs lint without a breaking check. Confirm the generated-source compatibility decision with the API owner before implementation. If preserving the generated module export is mandatory, use a Plan-local enum with the same numeric semantics as the fallback; do not replace the typed status with booleans or strings.

Also correct the Plan.approval_status comment. The implementation leaves it unspecified both when no linked Issue exists and when the linked Issue is still a draft.

Backend projection

convertToPlans already builds issueByPlanKey using both project ID and Plan UID. Populate IssueStatus in the same block that populates Issue and ApprovalStatus:

if issue := issueByPlanKey[key]; issue != nil {
    v1Plan.Issue = common.FormatIssue(issue.ProjectID, issue.UID)
    v1Plan.IssueStatus = convertToIssueStatus(issue.Status)
    if !issue.Payload.GetDraft() {
        v1Plan.ApprovalStatus = computeApprovalStatus(
            issue.Payload.GetApproval(),
        )
    }
}

This applies to both GetPlan and ListPlans because both use convertToPlans.

No schema migration, store method, extra query, or permission check is needed. ListPlans already exposes the linked Issue name and approval status to callers with bb.plans.list; lifecycle status is another field in the same summary.

Draft Issues report issue_status=OPEN and approval_status=APPROVAL_STATUS_UNSPECIFIED. The existing plan.issue and approval-status logic continue to distinguish a linked draft from an Issue-less incomplete Plan.

Badge precedence

Keep getReviewBadge as the single presentation policy:

  1. No linked Issue: no Review badge.
  2. issue_status=CANCELED: Closed.
  3. has_rollout=true or issue_status=DONE, with approval_status=PENDING: Bypassed.
  4. Otherwise render the approval-derived badge:
    • APPROVED: Approved
    • SKIPPED: Skipped
    • REJECTED: Rejected
    • PENDING: Under review
    • CHECKING or unspecified: no badge

Canceled takes precedence over rollout and approval so Plan List matches Plan Detail even for unusual or legacy state combinations.

Plan List passes plan.issueStatus instead of undefined. Remove comments and tests that describe CANCELED and DONE-without-rollout as intentional divergences.

Plan List cache invalidation

The Plan List cache is keyed by project and restored only for explicit list-to-detail Back navigation. Detail hooks currently invalidate that cache when Plan.update_time changes.

Issue actions do not change Plan.update_time, even though they change Issue-derived fields in the next GetPlan or ListPlans response:

  • Issue close/reopen changes Plan.issue_status.
  • Approval actions change Plan.approval_status.
  • Draft submission changes whether approval status is populated.

Therefore, Plan List cache invalidation must also depend on the linked Issue's update_time.

In both Plan Detail and Issue Detail patchState paths:

  1. Keep invalidating the Plan List cache when the Plan changes.
  2. Also invalidate the Plan List cache when the linked Issue changes.
  3. Keep invalidating the Issue List cache when the Issue changes.

Expose a direct project Plan-cache invalidation helper for batch Issue actions. After a successful batch close or reopen, invalidate the Plan List cache for each affected project that contains a Plan-backed Issue.

Do not change Plan.update_time to include Issue updates. That field describes the Plan resource and is also displayed as the Plan's Updated time; redefining it would mix Plan edits with review activity.

Consistency boundary

A single ListPlans conversion batch reads Plan rows, then Issue rows. It is not a database snapshot spanning both queries, so a concurrent Issue transition may appear on the next request rather than the current one. This is consistent with the existing approval-status projection and acceptable for the list.

The frontend must not issue per-row GetIssue requests to close this window. That would introduce N+1 traffic, require bb.issues.get in a bb.plans.list surface, and create more opportunities for mixed snapshots.

Alternatives considered

Infer closed from approval or rollout

Rejected. Issue status is an independent dimension. The same approval and rollout tuple can belong to an open, done, or canceled Issue.

Fetch each Issue from Plan List

Rejected. This adds N+1 requests, creates a permission mismatch, and duplicates data the backend already loaded.

Use Plan state

Rejected. Plan.state=DELETED is Plan resource lifecycle, while Issue.status=CANCELED is review lifecycle. They are displayed separately and can change independently.

Add issue_canceled and issue_done booleans

Rejected. Multiple booleans permit invalid combinations and duplicate an existing enum.

Return a backend-computed badge status

Rejected for this change. Closed, Bypassed, and Under review are display semantics derived from raw domain state. The existing shared frontend helper already centralizes that policy.

Add a review_summary message

Deferred. A structured summary containing Issue name, lifecycle status, approval status, and draft state would be reasonable if more Issue-derived fields are added to Plan. Introducing it now would duplicate or deprecate existing flat fields for the current narrow gap.

Test plan

Backend

Add Plan conversion/ListPlans coverage for:

  • No linked Issue -> empty Issue and unspecified Issue status.
  • Linked draft Issue -> OPEN, with approval status unspecified.
  • Linked submitted OPEN Issue -> OPEN and its computed approval status.
  • Linked DONE Issue -> DONE.
  • Linked CANCELED Issue -> CANCELED.
  • Plans with colliding numeric IDs in different projects do not receive each other's Issue status.

The collision case should continue to identify the relationship by the full (project, plan_id) key.

Frontend unit and rendering tests

Update reviewBadge.test.ts so Plan List and Plan Detail use the same complete input matrix. Delete tests that intentionally expect residual divergence.

Add Plan List rendering coverage for:

  • Canceled Issue renders Closed.
  • Done Issue with pending approval and no rollout renders Bypassed.
  • Open Issue with pending approval renders Under review.
  • Rollout with pending approval remains Bypassed.
  • Plan deletion and review closure remain separate visual states.

Cache tests

Extend project paged-cache tests and detail-hook tests to verify:

  • A Plan update invalidates the Plan List cache.
  • An Issue status or approval update invalidates both Issue List and Plan List caches.
  • An unchanged Issue does not invalidate either cache.
  • A batch Issue close/reopen invalidates the Plan List cache for every affected Plan-backed project.

Interaction regression

Cover the user journey:

  1. Open Plan List with an under-review Plan.
  2. Open the Plan.
  3. Close the linked Issue.
  4. Navigate Back.
  5. Confirm the restored/refetched Plan row shows Closed without manual refresh.
  6. Reopen the Issue and confirm the Plan row returns to Under review.

File inventory

Expected source changes:

proto/v1/v1/common.proto
proto/v1/v1/issue_service.proto
proto/v1/v1/plan_service.proto
backend/api/v1/plan_service.go
backend/api/v1/plan_service_test.go
frontend/src/routes/project/ProjectPlanDashboardPage.tsx
frontend/src/routes/project/utils/reviewBadge.ts
frontend/src/routes/project/utils/reviewBadge.test.ts
frontend/src/lib/projectPagedDataCache.ts
frontend/src/lib/projectPagedDataCache.test.ts
frontend/src/routes/project/plan-detail/shell/hooks/usePlanDetailPage.ts
frontend/src/routes/project/issue-detail/hooks/useIssueDetailPage.ts
frontend/src/components/IssueTable.tsx

Proto generation will also update generated Go, TypeScript, OpenAPI, and gRPC documentation artifacts. Frontend imports of IssueStatus must move to common_pb after regeneration; this affects every current frontend source file that imports the enum, not only the feature files listed above.

Verification

Run:

buf format -w proto
buf lint proto
(cd proto && buf generate)

gofmt -w backend/api/v1/plan_service.go \
  backend/api/v1/plan_service_test.go
golangci-lint run --allow-parallel-runners
go test -v -count=1 ./backend/api/v1 -run '^TestPlanService'

pnpm --dir frontend fix
pnpm --dir frontend check
pnpm --dir frontend type-check
pnpm --dir frontend test

git diff --check

Before publication, review the generated API diff specifically for:

  • bytebase.v1.IssueStatus retaining its full name and numeric values.
  • Plan.issue_status using a new field number.
  • No accidental change to Issue status JSON names.
  • Generated TypeScript import changes caused by moving IssueStatus.