Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

8.4 KB
Raw Blame

UI Test Plan — Accounting Period Close Lifecycle (loop/1031)

Branch adds a NetSuite-style period-close lifecycle + checklist to the ERP accounting module. This plan tests it through the browser only. All references grounded against the branch diff.

What the branch ships (UI-facing)

  • Sidebar nav: "Accounting Periods" under Accounting → General Ledger (icon: calendar-check). Route /x/accounting/periods. Requires employee role. (useAccountingSubmodules.tsx)

  • Periods list (periods.tsx): table of periods — Period label (FY{year} · Period {n}), Date Range, Status (Active/Inactive), Close Status badge, and a Close / View action. Close-status badge colors: Open=gray, Locked=orange, Closed=green. Empty state: "No accounting periods yet".

  • Close checklist modal (periods.$periodId.close.tsx): xlarge modal over the list. Task table (Task / Type / Severity / Status / Actions), a destructive blockingReason alert, and a footer Close Period button disabled until canClose.

  • 9 seeded checklist tasks per company (system definitions):

    # Task Type Severity Auto check
    1 Post pending operational documents Auto Blocker pending-postings
    2 Post or re-date draft journal entries Auto Blocker draft-journals
    3 Lock the period Action — —
    4 Post depreciation runs covering the period Auto Warning draft-depreciation
    5 Match & eliminate intercompany transactions Auto Warning unmatched-ic
    6 Review negative on-hand inventory Auto Warning negative-inventory (stub, always failing)
    7 Trial balance in balance for the period Auto Blocker tb-balanced
    8 Review financial statements Manual — —
    9 Close the period Action — (not required) —
  • Posting gates wired into getOrCreateAccountingPeriod: posting into a Closed period is blocked for all sources; posting into a Locked period is blocked for operational sources (receipts/shipments/invoices) but allowed for accounting sources (depreciation post, asset dispose).

  • DB immutability trigger: a Posted journal can't be deleted/edited (only Posted→Reversed).

⚠️ Critical finding to verify first (likely a blocker for the happy path)

There is no UI to move a period into Locked. closePeriodWithChecklist refuses to close unless closeStatus === "Locked" (accounting.service.ts:848 → "Period must be locked before closing."). But:

  • The "Lock the period" task is an Action task; marking it Done calls completeCloseTask, which only sets status='Done' — it does not set closeStatus='Locked'.
  • The only callers of lockAccountingPeriod are MCP tools (tool-metadata.json); no ERP route or button dispatches a lock intent.

Consequence: even with every checklist task resolved, clicking Close Period on a fresh Open period should fail with "Period must be locked before closing." Test T5 confirms this; T6 covers the close only after locking out-of-band. If the happy-path close is meant to work UI-only, this is a bug to report, not a test failure to hide.

Prerequisites

  1. Local stack running: crbn up (portless *.dev). Log in via /auth.
  2. Accounting enabled: /x/settings/accounting → turn on (crbn reset seeds accountingEnabled=false; GL posting/period creation is inert otherwise).
  3. At least one period must exist. Periods are created lazily by posting (getOrCreateAccountingPeriod); there is no "Generate periods" button in the UI. To get a period to test, either:
    • post any operational document dated in the target month (creates that month's period Open), or
    • create/lock a period out-of-band via the Carbon MCP tools (accounting_lockAccountingPeriod) or SQL.
  4. Note the companyId — the 9 task definitions seed per company on migration; a company created before the migration should still have them (seeded by INSERT … FROM company), but verify in T2.

Test cases

T1 — Nav + list render

  • Go to /x/accounting. Expect "Accounting Periods" in the General Ledger group; click it.
  • Expect /x/accounting/periods renders. With no periods → "No accounting periods yet". With periods → one row each, correct Period label, Date Range, Status, and a colored Close Status badge.
  • Action button reads Close for non-closed, View for Closed periods.

T2 — Open the checklist modal

  • Click Close on an Open period. Expect xlarge modal titled Close FY… · Period … with the 9 seeded tasks listed, correct Type/Severity per the table above.
  • Expect Auto tasks have no "Mark Done" button; Blocker tasks have no "Skip" button.
  • Expect the "Review negative on-hand inventory" task shows Open (stub always fails) and the blockingReason/Close-disabled state reflects unresolved required tasks.

T3 — Auto-check reflects real data (Blocker path)

  • Seed a Draft journal entry dated inside the period (or a Draft receipt/shipment/invoice).
  • Reopen the checklist. Expect the matching Auto task ("Post or re-date draft journal entries" / "Post pending operational documents") shows Open, a blockingReason alert is shown, and Close Period is disabled.
  • Post/void that document, reopen. Expect the task flips to Done automatically (no manual action).

T4 — Manual/Action complete + Skip validation

  • On a Warning task (e.g. "Review negative on-hand inventory"): click Skip → inline reason input appears. Submit empty → Expect rejection (reason required). Submit with a reason → Expect status Skipped, reason shown, toast "Task skipped".
  • On "Review financial statements" (Manual): Mark Done → Expect status Done, toast "Task marked done".
  • On "Lock the period" (Action): Mark Done → Expect status Done (but note: this does not lock the period — see T5).
  • On any Blocker Auto task that is failing: Expect no Skip button is offered, and it cannot be bypassed from the UI.

T5 — Close blocked when not Locked (the critical finding)

  • Resolve/skip every required task so the checklist would otherwise be complete (all Warnings skipped, Manual done, Auto blockers passing). If canClose becomes true the Close Period button enables.
  • Click Close Period. Expected (current branch): error toast "Period must be locked before closing." and the period stays non-closed. Record this — if UI-only close is intended, file as a bug.

T6 — Full close (after locking out-of-band)

  • Lock the period out-of-band (MCP accounting_lockAccountingPeriod, or set closeStatus='Locked').
  • Reopen the list → Expect Close Status badge = Locked (orange).
  • Open checklist, ensure all required tasks Done/Skipped, click Close Period. Expect redirect to the list, toast "Period closed", badge = Closed (green), action button = View.
  • Reopen a Closed period via View → checklist read-only-ish; Close Period disabled or close rejected with "Period is already closed."

T7 — Sequential close guard

  • With two consecutive periods both Locked, close the later one first. Expect rejection: "Earlier periods must be closed first (sequential close)."
  • Close the earlier one, then the later — Expect success.

T8 — Posting gates (Locked / Closed period)

  • Into a Locked period: attempt an operational post (create/post a receipt or invoice dated in it). Expect error mentioning the period is locked. Then post a depreciation run / dispose an asset dated in the same Locked period — Expect success (accounting source bypasses the lock).
  • Into a Closed period: attempt any post. Expect "Accounting period is closed. Reopen it before posting."

T9 — Permissions

  • As a user without accounting_update: open the checklist. Expect Mark Done / Skip / Close all fail server-side (action requires update: "accounting"), even if buttons render.
  • As a user without accounting_view / non-employee: Expect the nav item hidden and the route redirects.

Reporting

  • Capture a screenshot of: the periods list, the checklist modal with a blockingReason, and the T5 result.
  • Lead the report with the T5/lock-gap outcome — it determines whether the close happy-path is reachable through the UI at all on this branch.