Test Plan — Change Orders: Replacement Part, net-new New Part, N→1 consolidation
Feature: .ai/specs/2026-07-19-change-order-new-part-and-consolidation.md
Impl plan: .ai/plans/2026-07-19-change-order-new-part-and-consolidation.md
Branch: feat/change-orders-top-to-bottom
Type: manual / e2e verification (basis for a /test playbook)
What changed (under test)
- The change type formerly called New Part is renamed Replacement Part (1:1 supersession — new part number that supersedes the affected part).
- A new New Part change type: genuinely net-new part, no predecessor, no supersession, minted + released under the CO (Make or Buy).
- N→1 consolidation: introduce a New Part and, on a parent assembly (Version/Revision change), remove the old component lines and add the New Part — a BOM change, not a supersession.
- The Add Affected Item modal now leads with a change-type Select that drives the body (existing-part picker vs. create-new-part mini-form).
Taxonomy under test (changeOrderChangeType): Version | Revision | Replacement Part | New Part.
0. Environment & setup
Stack: local dev running (crbn up); ERP at the value of ERP_URL in .env.local (currently https://erp.change-orders-top-to-bottom.dev). Log in via the DEV_BYPASS_EMAIL bypass ([email protected]). Company: Carbon Development.
DB access (for the verification queries below):
DB_URL=$(grep -E "^SUPABASE_DB_URL=" .env.local | cut -d= -f2-)
psql "$DB_URL" -c "<query>"
Migration must be applied (it is, on this branch's local DB). Confirm:
SELECT string_agg(enumlabel, ',' ORDER BY enumsortorder)
FROM pg_enum e JOIN pg_type t ON t.oid = e.enumtypid
WHERE t.typname = 'changeOrderChangeType';
-- Expect: Version,Revision,Replacement Part,New Part
Test data to create (once)
| Fixture | How | Purpose |
|---|---|---|
| ASM-A — a Make (manufactured) part with a BOM of 3 purchased components C1, C2, C3 | /x/part/new (Make) then add 3 BOM lines on its method |
The consolidation target |
| ASM-B — a second Make part whose BOM also uses C1 | /x/part/new (Make) + add C1 to its BOM |
Proves a "removed" component is untouched elsewhere |
| (optional) an existing CO with a pre-migration "New Part" affected item | already-seeded rows, if any (seed-change-orders.ts) |
Rename regression (§A) |
If no pre-migration CO exists locally, §A3 is covered by §F (create a Replacement Part CO fresh and confirm it supersedes).
A. Rename / migration regression — "Replacement Part"
| ID | Steps | Expected |
|---|---|---|
| A1 | Query existing affected items | Any row that was New Part before the migration now reads Replacement Part. SELECT DISTINCT "changeType" FROM "changeOrderAffectedItem"; → only values from the 4-type set; no bare New Part row that has a baseMakeMethodId (those are replacements). |
| A2 | Enum check (§0) | Version,Revision,Replacement Part,New Part |
| A3 | Open any pre-existing CO that had a "New Part" affected item | The affected-item badge shows Replacement; the cutover/Part Supersession card is present; releasing it still writes an itemSupersession (see F2). |
B. Add Affected Item modal — change-type Select
Open a CO (Draft), click Add Affected Item.
| ID | Steps | Expected |
|---|---|---|
| B1 | Observe the modal | First control is a Change type Select with options: Version, Revision, Replacement Part, New Part. Default Version. |
| B2 | Select Version / Revision / Replacement Part in turn | Body shows the existing Part or Tool picker (<Item>), not the new-part form. |
| B3 | Select New Part | Body swaps to the mini-form: Part Number (auto-populated), Name, Type (Part/Tool), Replenishment System (Buy/Make/Buy and Make). The <Item> picker is gone. |
| B4 | In New Part mode, switch Type Part → Tool | The auto-minted Part Number re-mints for the new type (e.g. a tool sequence). |
| B5a | New Part mode, clear Name, submit | Validation error "Name is required"; nothing created. |
| B5b | Existing mode (Version), submit with no item picked | Validation error "Item is required". |
C. New Part — net-new creation & authoring
| ID | Steps | Expected |
|---|---|---|
| C1 | Add affected item → New Part, Make, keep auto number, Name "Consolidated Bracket", Add | A new explorer row appears reading NEW → {minted number}; the app navigates to its detail. |
| C2 | On the New Part detail | Shows Properties (attributes) + Bill of Material + Bill of Process editors (empty), a Changes card, and NO cutover / Part Supersession card. Badge = New (green). |
| C3 | DB: the minted item | SELECT active, "revisionStatus", "changeOrderId" FROM item WHERE "readableId" = '{number}'; → active = f, revisionStatus = Design, changeOrderId = the CO id. Its make method: SELECT status, "changeOrderId" FROM "makeMethod" mm JOIN item i ON i.id = mm."itemId" WHERE i."readableId" = '{number}'; → status = Draft, changeOrderId = the CO. |
| C4 | On the New Part detail, look for the change-type switcher | Absent — a New Part cannot be switched to another type. |
| C5 | Add affected item → New Part, open the Type select | Only Part and Tool offered (no Material/Consumable/Service). |
| C6 | Author the New Part's BOM: add 2 components; author a BOP operation | Edits persist (reload the line — they remain); the Changes card lists the added materials/operation as additions. |
| C7 | Add a New Part, Buy | Detail shows Properties + Supplier Parts grid; no BOM/BOP editor (Buy has no method). |
D. Consolidation (N→1) authoring
Precondition: ASM-A (3 components C1/C2/C3) + a New Part created in C1.
| ID | Steps | Expected |
|---|---|---|
| D1 | In the same CO, Add Affected Item → Version, pick ASM-A | ASM-A added as a Version affected item; its draft BOM editor shows C1, C2, C3. |
| D2 | On ASM-A's draft BOM, delete C1, C2, C3; Add material and open the item picker | The New Part draft (inactive) is selectable in the picker (it appears because the picker is includeInactive). Select it, set quantity 1. |
| D3 | Open ASM-A's Changes card | Shows 3 removed (C1/C2/C3) and 1 added (the New Part). No "modified". |
| D4 | Open the CO overview Changes rollup | Shows both the New Part's own additions (its BOM) and ASM-A's remove/add. |
| D5 | (edge) Try to add ASM-A's own BOM line referencing a Material | Allowed only per the picker's validItemTypes (Consumable/Material/Part) — Tools excluded as components, as before. (Regression, not new behavior.) |
E. Release — supersession semantics & ordering
Advance the CO: Draft → Start → Engineering Complete → Implementation, then Release (Implementation → Done).
| ID | Steps | Expected |
|---|---|---|
| E1 | Release the CO | CO status = Done; no error. |
| E2 | DB: the New Part after release | active = t, changeOrderId = CO (stamped). No supersession: SELECT count(*) FROM "itemSupersession" WHERE "successorItemId" = '{newPartItemId}'; → 0. |
| E3 | Open ASM-A's item master (Manufacturing) | Its active method now has the new BOM: New Part present, C1/C2/C3 gone. |
| E4 | DB: the removed components are untouched | C1/C2/C3 still active = t; no itemSupersession was written for them by this CO. ASM-B's BOM still references C1. |
| E5 | Regression of the redirect map | Create a job from ASM-B (which still uses C1) → its job BOM still pulls C1 (no redirect to the New Part — the consolidation was local to ASM-A). |
| E6 | Ordering sanity | ASM-A's released method references the New Part as an active item (the New Part was revealed active before ASM-A's method flipped — no dangling/inactive component reference). |
F. Replacement Part (renamed) — still supersedes
| ID | Steps | Expected |
|---|---|---|
| F1 | New CO; Add Affected Item → Replacement Part, pick an existing manufactured part P | New affected item; badge Replacement; detail shows Properties + BOM/BOP editors + cutover / Part Supersession card; the minted new item has a new part number derived from P's (e.g. …0029 → …0030). |
| F2 | Author a change, release | DB: an itemSupersession is written, predecessor = P's item, successor = the new part. active = t on the new part. |
| F3 | Badge everywhere (explorer + card) | Reads Replacement (orange), distinct from New (green). |
G. Negative / guard cases
| ID | Steps | Expected |
|---|---|---|
| G1 | On an existing (Version/Revision/Replacement) affected item, open the change-type switcher | Options are Version / Revision / Replacement Part — New Part is not offered. (Buy items also hide Version.) |
| G2 | POST a change-type switch to New Part directly (e.g. via a crafted request) |
Rejected — flash "New Part change type cannot be switched" (route guard + updateChangeOrderAffectedItemChangeType guard). |
| G3 | Attempt a New Part with a non Part/Tool type (not possible via UI; test the service guard) | Rejected — "New Part is only supported for Parts and Tools". |
| G4 | Remove a New Part affected item from the CO | Its draft (and the minted item, if the discard path deletes it) is discarded; the explorer row disappears; no orphaned active item. |
H. Regression — existing CO behaviors preserved
| ID | Steps | Expected |
|---|---|---|
| H1 | Add a Version affected item, author a BOM change, release | New Active method version on the same item, prior Active → Archived; no new item, no supersession. |
| H2 | Add a Revision affected item, release | New revision item revealed active; oldRev→newRev itemSupersession written; cutover card was present. |
| H3 | Badges | Version = Version N; Revision = New Revision. |
| H4 | Add a Buy item as Version | Coerced to Revision on add (Buy has no BoM/BoP). |
| H5 | (prior work) Open an item that's a Revision/New Part draft under an open CO on its item master | Its CO-owned draft BOM/BOP renders and is editable, in sync with the CO. |
| H6 | (prior work) Parts table | Surfaces the active revision, not an inactive CO draft revision. |
I. Data-integrity queries (reference)
-- Affected items of a CO with their change types + draft refs
SELECT "changeType", "itemId", "newItemId", "baseMakeMethodId", "draftMakeMethodId"
FROM "changeOrderAffectedItem" WHERE "changeOrderId" = '<coId>';
-- Supersession written by a release
SELECT "itemId" AS predecessor, "successorItemId" AS successor, "supersessionMode"
FROM "itemSupersession" WHERE "companyId" = '<companyId>' ORDER BY "createdAt" DESC LIMIT 10;
-- New Part must have NONE of the above as successor:
SELECT count(*) FROM "itemSupersession" WHERE "successorItemId" = '<newPartItemId>'; -- expect 0
-- A CO-owned draft method is cleared at release (idempotency marker)
SELECT id, status, "changeOrderId" FROM "makeMethod" WHERE "changeOrderId" = '<coId>'; -- empty after release
J. Automated coverage (already green — re-run before merge)
pnpm --filter erp exec vitest run app/modules/items/items.service.test.ts # 15 tests, incl. N→1 consolidation diff
pnpm exec turbo run typecheck --filter=erp # scoped typecheck
pnpm exec turbo run typecheck --filter=@carbon/database # seed
Pass criteria
- All of A–H pass in the browser + the DB checks match.
- No supersession is ever written for a New Part (E2, I).
- Removed consolidation components are untouched globally (E4, E5).
- Existing "New Part" COs behave exactly as before under the Replacement Part label (A3, F2).
- Automated coverage (J) is green.
Known risk to watch (from the impl checkpoint)
- New Part draft visibility in the assembly BOM picker (D2): the minted inactive part must be present in the client
useItemsstore for theincludeInactivepicker to show it. If it doesn't appear immediately after minting, reload the CO page (store re-sync) and retry; if it still doesn't appear, that's a real bug (store not carrying the just-minted inactive item) — capture it.