Change Orders (ECO) — Remaining Work

Status: The change-orders feature shipped on feat/change-orders-top-to-bottom. The current, accurate design is the source of truth in apps/erp/app/modules/items/AGENTS.md → "Change Orders (sub-area)". This plan captures ONLY the work still open after that; it deliberately does not re-describe shipped behavior.

This consolidates six earlier change-order plans (v1 top-to-bottom, v2 reuse-method-tables, conflict-resolver, supplier-parts + changes-rollup, new-part + consolidation, and its test plan). The superseded/shipped design docs were removed after their still-open items were folded in below.

Do NOT resurrect (dead approaches, intentionally removed)

Designed in earlier plans and deliberately dropped — don't rebuild them:

  • Staged mirror tables (changeOrderStaged*) — replaced by a real CO-owned Draft makeMethod (makeMethod.changeOrderId).
  • The 2-way merge / conflict resolver at release (ChangeOrderConflictResolver, getChangeOrderReleaseDiff, reconcileDraftWithLive, applyTheirs, buildReleaseConflictEntries) — release is a plain review-then-confirm dialog now; releasing a Version just appends a new Active version.
  • The one-open-CO-per-part guard — same-part parallel COs are allowed (findOtherOpenChangeOrdersForItem is advisory only).
  • getChangeOrderImpact PO-lines table — replaced by the where-used ImpactPanel.
  • mintPlaceholderPart exists but is unwired; plmReleaseControl / item.releaseStatus enforcement was not adopted.

Open / deferred work

1. Tool affected items + Tool attribute editing under a CO

The service layer accepts Tools, but there is no UI path to add a Tool as an affected item, and embedded attribute editing (PartProperties embedded variant) is wired for Parts only. Add the Tool add-path and a ToolProperties-embedded editor so a Tool Revision / Replacement Part / New Part can edit attributes on the CO line. Sources: AGENTS.md "Deferred (not yet built)"; v2 plan Task 11 (PartProperties deferral, now Parts-only); new-part plan Task 5 ("Tool attribute editing remains a follow-up").

2. "Used in N other assemblies" indicator on removed diff lines

On the Changes diff, a removed BOM component line should show a where-used count ("used in N other assemblies") so the author sees the blast radius inline. Needs a loader decision — a per-removed-component getPartUsedIn is a heavier query, hence deferred. Where-used is currently only reachable via each part's detail page and the CO ImpactPanel. Source: new-part plan Task 7 step 2 (marked [~]/PENDING).

3. (Backlog) NCR-style templated / gating action tasks

V1 ships only freeform, non-gating changeOrderActionTask. The templated/gating action-task machinery (the Q7 fast-follow) was explicitly deferred and never built. Source: v2 plan out-of-scope ("NCR-style action templates (Q7 fast-follow, not this version)").

Verification

End-to-end browser verification of the shipped feature is not yet recorded as run. The full manual/e2e matrix is the verification gate: .ai/plans/2026-07-19-change-order-new-part-and-consolidation-test-plan.md (sections A–J: rename regression, net-new New Part, N→1 consolidation, release supersession semantics, guard/negative cases, regression matrix). A cached playbook also exists at .ai/playbooks/change-order-new-part-consolidation.md.

Known risk to watch (D2): a minted inactive New Part must be present in the client useItems store for the includeInactive assembly-BOM picker to show it. If it doesn't appear immediately after minting, reload the CO page (store re-sync) and retry; if it still doesn't appear, that's a real bug (store not carrying the just-minted inactive item) — capture it.