Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

30.1 KB
Raw Blame

Docs screenshots — what's missing and how to capture it

Date: 2026-08-12 · Branch: feat/docs-screenshots

Summary

The docs site (docs/, Fumadocs) has 38 screenshot slots and zero real screenshots. Every slot is a <Screenshot label=… caption=… ratio=… /> placeholder that renders a dashed grey box with the label text inside (docs/components/editorial/mdx.tsx:57). There is no src prop, and docs/public/ contains no screenshot directory.

So this work is two things:

  1. Code change (small, do first): teach <Screenshot> to accept src and render a real <img> inside the existing Zoomable frame, falling back to today's dashed placeholder when src is absent. That keeps un-captured slots working while we fill them in batches.
  2. Capture + place 38 images under docs/public/screens/ and add src= to each slot.

Proposed convention: docs/public/screens/<guide-or-page-slug>-<short-slug>.png, e.g. docs/public/screens/plan-projections.png. Capture at a fixed viewport (suggest 1600×900 for ratio="wide", 1200×1600 for ratio="tall"), 2× DPR, light theme only (the site is light-only).

Feasibility at a glance

  • 28 of 38 are plain authenticated ERP pages or in-page modals — straightforward.
  • 5 live in the MES app on a different port (3001) — same login, just a second browser target.
  • 2 are public tokenized share pages (/share/quote/:externalLinkId, /share/supplier-quote/:externalLinkId) — capturable, but the link must be copied out of the ERP record first, and should be shot in a clean window so no ERP chrome is in frame.
  • 3 need heavy prerequisite data (traceability graph, job production events, RFQ compare) — they render an empty state unless a full flow has actually been run.
  • 1 is access-gated (/x/settings/backups, internal-email only) but open on local dev, so capture it locally.

Two capture-order dependencies worth planning around: production events (#28) needs time logged in MES first, and the change-notice diff (#38) needs the notice walked Draft → Implementation with real draft edits.

The 38 screenshots

Legend: App = erp (port 3000) / mes (port 3001) / share (public page). :id params are DB UUIDs, not the human-readable IDs shown in the UI.

Guide: quote-to-cash

# Slot App Where to capture Prereqs / notes
1 guides/quote-to-cash.mdx:33 — Quote builder erp /x/quote/:quoteId/:lineId/details Quote in Draft with ≥2 lines and multiple quotePrice rows (quantity breaks). The line page shows the explorer + the break grid together.
2 guides/quote-to-cash.mdx:47 — Digital quote, customer view share /share/quote/:externalLinkId Quote status Sent, companySettings.digitalQuoteEnabled. Copy the link from the quote header's Share button. PO-upload field needs digitalQuoteIncludesPurchaseOrders.
3 guides/quote-to-cash.mdx:69 — Sales order erp /x/sales-order/:orderId/details Order created via the quote header's Convert to Order; opens at "To Ship and Invoice".

Guide: order

# Slot App Where to capture Prereqs / notes
4 guides/order.mdx:20 — Sales order dashboard erp /x/sales/orders (list) or /x/sales-order/:orderId/details No "delivery schedule" entity exists — it's per-line promisedDate. Use 3 lines of 30 with staggered dates.
5 guides/order.mdx:34 — Jobs card + Convert Line to Job dialog erp /x/sales-order/:orderId/:lineId/details, click Make to Order In-page modal, no URL. Line methodType = "Make to Order". Prefilled qty = remaining, so create 0–2 jobs first to show the 90 → 60 story.
6 guides/order.mdx:46 — Job overview with copied method erp /x/job/:jobId/details Job must have a populated jobMakeMethod, else BoM/BoP cards are empty.

Guide: order-to-cash

# Slot App Where to capture Prereqs / notes
7 guides/order-to-cash.mdx:43 — Post shipment erp /x/shipment/:shipmentId/details, click Post Modal, no URL. Shipment is created only by the sales order header's Ship button (/x/shipment/new is POST-only). Order must be To Ship / To Ship and Invoice.
8 guides/order-to-cash.mdx:51 — Sales invoice erp /x/sales-invoice/:invoiceId/details Created from a posted shipment. Don't re-hit /x/sales-invoice/new?... — it creates a new invoice every load.

Guide: ship

# Slot App Where to capture Prereqs / notes
9 guides/ship.mdx:16 — Quality issue erp /x/issue/:id/details Issue created at /x/issue/new with an item + workflow, then a job-operation association added.
10 guides/ship.mdx:42 — Procedure version history erp /x/procedure/:id, open the V{n} version dropdown Needs ≥2 versions (ideally one Active, one Archived). Alternative non-interactive shot: the Versions popover on /x/production/procedures.
11 guides/ship.mdx:52 — Traceability graph erp /x/traceability/graph?trackedEntityId=<id> Heavy prereq: a serialized entity with real build activity. Without a tracked param the route redirects to /x/traceability; without activity it renders an empty state.
12 guides/ship.mdx:60 — Shipment & invoice (partial) erp /x/shipment/:shipmentId/details then /x/sales-invoice/:invoiceId/details Two pages, one slot — either pick the stronger one or composite. Ship 30 of 90; the order stays To Ship and Invoice.

Guide: build

# Slot App Where to capture Prereqs / notes
13 guides/build.mdx:45 — BoM Subassembly / Kit toggle erp /x/part/:itemId/make/:makeMethodId, expand a material row The toggle renders only when the material's methodType = "Make to Order", and only on a Draft method.
14 guides/build.mdx:57 — Job method explorer erp /x/job/:jobId/details Multi-level method (Make-to-Order children with their own materials + ops). Don't shoot from the operations/events tabs — they auto-collapse the explorer.

Guide: floor

# Slot App Where to capture Prereqs / notes
15 guides/floor.mdx:22 — MES schedule board mes /x/operations Released jobs with operations at work centers in the user's active location.
16 guides/floor.mdx:39 — Job routing with an outside operation erp /x/job/:jobId/details (Bill of Process card) Needs one Process op and one Outside Processing op with a supplier process attached.
17 guides/floor.mdx:45 — Shop-floor work instructions mes /x/operation/:operationId → Instructions tab Tab is React state, not deep-linkable — must be clicked. Operation needs an attached procedure with steps + images.
18 guides/floor.mdx:66 — MES operation screen mes /x/operation/:operationId Operation type must be Process (Assembly/Inspection redirect elsewhere). Job Released with materials on the op.
19 guides/floor.mdx:87 — Shop-floor scan mes /x/assembly/:operationId → click a tracked material → Issue Material modal Operation type Assembly; parent serial-tracked; a batch/serial-tracked material with available lots. No physical scanner needed — the modal has a searchable dropdown.

Guide: plan

# Slot App Where to capture Prereqs / notes
20 guides/plan.mdx:18 — Production → Projections erp /x/production/projections Needs a location with defaults set; enter quantities for a few weeks.
21 guides/plan.mdx:35 — Part: Planning tab erp /x/part/:itemId/planning Set a reordering policy, reorder point, lot size; the chart needs some on-hand/demand history.
22 guides/plan.mdx:49 — Planning table erp /x/production/planning (and/or /x/purchasing/planning) Caption says "jobs and POs" but these are two separate pages — pick one, or split the slot. Needs open demand + parts with a reordering policy.
23 guides/plan.mdx:59 — Receiving a purchase order erp /x/receipt/:receiptId/details, expand a line Receipt created from a released PO via Receive; PO line must be for a Batch-tracked part so the lot field shows inline. Requires the create edge function running locally.

Guide: job-finish-close / job-costing

# Slot App Where to capture Prereqs / notes
24 guides/job-finish-close.mdx:25 — Job completion erp any job page → header Complete button → modal Job not already Completed/Cancelled. Posting is irreversible — use a throwaway job.
25 guides/job-costing.mdx:35 — Job production events erp /x/job/:jobId/events Dependency: needs logged productionEvent rows — run Setup/Labor/Machine in MES first (#18), or add events manually at /x/job/:jobId/events/new. Work centers need rates for the cost columns to read well.

Guide: rfq-to-po

# Slot App Where to capture Prereqs / notes
26 guides/rfq-to-po.mdx:27 — RFQ supplier comparison erp /x/purchasing-rfq/:rfqId → Compare Quotes drawer Heavy prereq: RFQ finalized (Requested) with ≥2 suppliers and >1 Active supplier quote actually submitted, else the button doesn't render.
27 guides/rfq-to-po.mdx:39 — Supplier quote portal share /share/supplier-quote/:externalLinkId Public tokenized page; copy the link from the supplier quote header. Shoot in a clean window.
28 guides/rfq-to-po.mdx:51 — Purchase order erp /x/purchase-order/:orderId/details Finalized PO, nothing received or invoiced. Watch out: a high-value PO shows "Needs Approval" instead.

Guide: receive-and-bill

# Slot App Where to capture Prereqs / notes
29 guides/receive-and-bill.mdx:35 — Post receipt erp /x/receipt/:receiptId/details, click Post Modal, no URL. Draft receipt from a finalized PO with received quantities.
30 guides/receive-and-bill.mdx:55 — Purchase invoice erp /x/purchase-invoice/:invoiceId/details Draft invoice created from the receipt/PO Invoice button, lines carrying purchaseOrderLineId.

Guide: fixed assets

# Slot App Where to capture Prereqs / notes
31 guides/fixed-assets-acquire.mdx:31 — Fixed asset register erp /x/fixed-asset/:fixedAssetId/register (directly linkable drawer) Asset must be Draft — the route redirects otherwise. The accounting list pages are behind a beta gate; the detail routes are not.
32 guides/fixed-assets-acquire.mdx:45 — Depreciation run erp /x/depreciation-run/:depreciationRunId ≥1 Active asset with a depreciation method + start date, open accounting period, run still Draft.
33 guides/fixed-assets-sell.mdx:25 — Sell fixed asset erp /x/fixed-asset/:fixedAssetId/sell (modal, linkable) Asset must be Active or Fully Depreciated; needs a customer to pick.

Guide: change-order

# Slot App Where to capture Prereqs / notes
34 guides/change-order.mdx:40 — New change notice form erp /x/change-notice/new Change-notice types must exist (seeded). Capture before any affected item is added.
35 guides/change-order.mdx:60 — Affected item + change-type selector erp /x/items/change-notice/:id/:affectedId/details Affected item must be a Part with a live make method so the draft BoM/BoP renders.
36 guides/change-order.mdx:108 — Release diff review (ratio="tall") erp /x/items/change-notice/:id/details → header Release Heaviest prereq: notice must be walked to status Implementation one step at a time, with real draft edits (a removed BoM line, a changed attribute), else the diff is empty. Modal state is not routable.

Reference / platform pages

# Slot App Where to capture Prereqs / notes
37 docs/platform/backups.mdx:33 — Settings → Backups erp /x/settings/backups Gated: internal email or IS_LOCAL_DEV. Capture locally. Also open the i contents popover for the live per-area counts.
38 docs/reference/import-export.mdx:24 — Parts list Download CSV erp /x/items/parts The dashed download button only renders when the table has ≥1 row. Hover it if we want the "Download CSV" tooltip in frame.

Open questions for the next session

  1. <Screenshot src> shape — plain <img> vs Next <Image>. Next <Image> gives us width/height and lazy loading, but needs intrinsic dimensions; plain <img> inside the existing aspect-ratio box is the smaller change. Recommend plain <img> first.
  2. Slot #12 and #22 each describe two pages. Either capture the stronger single view or split the slot into two <Screenshot>s. Needs a call.
  3. Data seeding. Several slots (11, 25, 26, 36) need a flow actually run end to end. Worth deciding whether we seed a demo company once and shoot everything against it.
  4. Redaction. Whatever company we shoot against will have its name, users, and part numbers in frame permanently. Recommend a purpose-built demo company matching the guides' robot story.

Data audit — 2026-08-12

Checked against the local dev Postgres for this worktree (postgresql://postgres:postgres@localhost:64728/postgres), company Nebula aerospace (JdWKt22cuZfGGCmEH6jP7u), the company owned by [email protected]. The other company in the DB (Carbon Development, d9u72rtbc0gg2fdet3sg, owned by [email protected]) holds an identical copy of the same seed — same gaps.

Verdict: the seed fills every list screen, but ~24 of the 38 screenshots would still come out empty or wrong. The single biggest hole is that jobs were seeded without any operations or materials.

Empty / missing (blocks a screenshot)

Gap Evidence Blocks
Jobs have no operations and no materials jobOperation = 0 and jobMaterial = 0 for all 8 jobs, though jobMakeMethod = 8 6, 14, 15, 16, 17, 18, 19, 24, 25
No procedures at all procedure = 0, procedureStep = 0 10, 17
No purchasing RFQs or supplier quotes purchasingRfq = 0, supplierQuote = 0 26, 27, 28
No demand projections demandProjection = 0 20
No production events productionEvent = 0 25
No tracked activity (no genealogy) trackedActivity = 0; the 8 trackedEntity rows are all sourceDocument = 'Item' 11
No depreciation runs depreciationRun = 0 32
No quantity-break pricing quoteLinePrice = 0 1
Digital quote unreachable every quote.externalLinkId is null, and companySettings.digitalQuoteEnabled = false 2
No issue↔job-operation link nonConformanceJobOperation = 0 9
Nothing is batch- or serial-tracked all 33 items are itemTrackingType = 'Inventory' 19, 23, 11
No outside-processing operations all 27 methodOperation rows are operationType = 'Process' (2 supplierProcess rows exist but are unused) 16
No Make-to-Order child materials all 40 methodMaterial rows are Pull from Inventory, so no subassembly exists 13, 14
No order at "To Ship and Invoice" statuses present: Draft, Confirmed, In Progress, To Ship, Completed, Closed, Cancelled 3, 7
No PO at "To Receive and Invoice" present: Draft, To Receive, To Invoice 28
Thin sales orders 8 of 9 orders have exactly 1 line; only the To Ship order has 2 lines and promisedDate set 4, 5
Only one fixed asset, already Active fixedAsset = 1 (FA000001, Active) — the Register drawer needs a Draft asset 31

Already fine

Parts list (22 parts) for 38 · Backups page for 37 (open on local dev) · Draft shipment from a sales order for 7 · Draft receipt from a PO for 29 · Draft sales invoice for 8 · Draft purchase invoice for 30 · itemPlanning reordering policies on all 66 rows for 21 · the Active fixed asset for 33 · 3 change notices (one at Implementation) with one affected item each for 34/35 — though 36 still needs real draft edits on that affected item to produce a non-empty diff.

How to fill the gaps

The dev seed is already well structured — packages/database/src/seed-dev/tiers/01…12, run by pnpm run db:seed:dev -- --email [email protected]. Extending those tiers is the right fix: repeatable, reviewable, and it goes through the same code paths the app uses, so nothing about navigation breaks. Hand-written one-off INSERTs would drift and risk half-built records.

Caveat to confirm before running: seed-dev.ts wipes the company's business data and rebuilds it unless --skip-wipe is passed. Reference/config data is preserved.


Data fixes applied — 2026-08-12

All gaps were closed by extending the dev seed (packages/database/src/seed-dev/), not by hand-written inserts, so the fix is repeatable: pnpm run db:seed:dev -- --email [email protected].

The root cause behind nine of the empty screenshots

tiers/06-production.ts guarded its only jobOperation insert on ctx.refs.processes["Mechanical Assembly"] and ctx.refs.workCenters["Fabrication Bay"] — neither name exists (the real ones are "Clean Room Assembly", "CNC Mill", …). The guard was if (jmm1 && procAssembly && wcFab), so it silently did nothing and every job shipped with zero operations and zero materials.

Fixed properly rather than by renaming the two refs: a new helpers/job-method.ts copies an item's active make method onto a job the way the get-method edge function's itemToJob path does — recursively, so subassemblies get their own jobMakeMethod, materials keep the operation they are consumed at, and rates come from the work center. The seed runs as one SQL transaction and cannot invoke an edge function, which is why this had to be reimplemented rather than called. It is deliberately narrower than the edge function: no configuration rules, no supersession redirect, no step/tool/parameter copy.

Result: 81 job operations and 113 job materials across the 8 jobs, 11 levels deep on SAT-1000.

Everything else

Gap Fix Tier
No subassemblies (all BOM lines "Pull from Inventory") addBomLine now derives methodType from the component's new isMake flag and sets materialMakeMethodId to the component's active method helpers/items.ts
No outside-processing step Hard-anodize operation on BUS-STR-001 backed by a new AstroMill supplierProcess 01, 02
Nothing batch- or serial-tracked SAT-1000 + RW-010 Serial; BAT-LIION-48V + MAT-AL7075-PLT Batch 02
Assembly view unreachable in MES SAT-1000's integration operation is now operationType: Assembly 02
No procedures Two procedures with steps; "Structural Frame Assembly" has V1 Archived + V2 Active, attached to real operations 01, 02
Scan picker empty Available lots/serials for the tracked buy parts 03
No production events Setup/Labor/Machine events + a production quantity on the in-progress job 06
Traceability graph empty SAT1000-SN-0001 with a Produce activity and six Consume activities carrying real inputs 06
Issue had no association nonConformanceJobOperation + nonConformanceItem on NCR000001 07
MES board empty even with jobs The employee sat at Headquarters while every job and work center is at the plant — employeeJob.locationId now points at the plant (userDefaults is a view over it) 01
No quantity-break pricing, digital quote unreachable, no "To Ship and Invoice" order, single-line orders 8 quoteLinePrice rows, digitalQuoteEnabled, a real externalLink, and a 3-line staggered-delivery order 04
No RFQ, no supplier quotes, no portal link, no PO at "To Receive and Invoice" One RFQ to 3 suppliers, 3 Active supplier quotes with comparable break pricing and portal links, and PO000004 converted from the winner 05
One Active fixed asset, no depreciation run 4 assets (Draft / Active ×2 / Fully Depreciated) + a Draft run with lines 09
Projections blank 48-week period horizon + 24 weekly projections for three make parts 12
Receipt line did not ask for a lot requiresBatchTracking on the battery receipt line 05

Verified after re-seed

jobOperation 81 · jobMaterial 113 · jobMakeMethod 56 · Assembly ops 2 · Outside Processing ops 3 · procedures 2 Active + 1 Archived with 11 steps · operations carrying a procedure 5 · trackedActivity 1 Produce + 6 Consume · productionEvent 6 · demandProjection 24 · depreciationRun 1 with 2 lines · fixed assets Draft/Active×2/Fully Depreciated · quoteLinePrice 8 · digital quote enabled with a live externalLinkId · a sales order at "To Ship and Invoice" · a PO at "To Receive and Invoice" · 3 supplier quotes with portal links · nonConformanceJobOperation 1 · Make-to-Order BOM lines 10 · tracked items 2 Serial + 2 Batch.

Change notices + one wipe bug

changeOrderAffectedItem rows had draftMakeMethodId / baseMakeMethodId NULL, so the affected-item page had nothing to edit and the Release diff was empty. All three notices now clone the item's method into a CO-owned Draft. CN-000002 (the one at Implementation, the status the Release button needs) diverges from its base on purpose — MAT-KAPTON dropped, the battery quantity 1→2, HARNESS-001 added, an operation renamed and re-timed, and a description set that the base does not have — so the diff shows a removal, an addition, a modification and an attribute change. changeSummary is dead code (nothing reads it) and was left null.

Adding supplier quotes exposed a latent bug in wipe.ts: supplierQuoteLine.itemId has the same check constraint salesOrderLine.itemId does, so nullNullableReferences could not null it and the second seed run failed during the wipe. supplierQuote and purchasingRfq joined the list of headers deleted before that pass. The seed has since been run twice in a row cleanly.

Caveat

Everything above is verified at the database level (row counts, statuses, foreign keys), not by loading each of the 38 pages in a browser. The page-by-page check happens naturally during the capture pass — anything still empty will be obvious the moment we open it.


Capture spec — 2026-08-12

The shot list, resolved to exact URLs against this worktree's data. Written so a capture run is mechanical: open URL, do the action, save to the filename.

Settings (identical for every shot)

  • ERP https://erp.docs-screenshots.dev · MES https://mes.docs-screenshots.dev · share pages are public routes on the ERP host.
  • Sign in as [email protected], company Nebula aerospace, location Manufacturing Plant (the MES board and the location-scoped ERP pages read the signed-in user's default location).
  • Viewport 1600×1000 at 2× device pixel ratio for ratio="wide", 1200×1500 for ratio="tall" (only slot 36). Viewport clip, not full-page — a 4000px-tall page scaled into a 16:9 figure is unreadable.
  • Light theme only; the docs site is light-only and a dark screenshot would fight the paper.
  • No browser chrome, no OS window frame, no cursor. Page content only.
  • PNG. Collapse the left sidebar only if it crowds the subject; otherwise leave the app's normal chrome in frame so readers recognise where they are.
  • Wait for skeletons/spinners to clear before capturing. Several of these pages stream.

Naming and location

docs/public/screens/<guide-slug>-<subject>.png, referenced from MDX as src="/screens/<file>.png" (paths under docs/public/ are served from the site root).

Shot list

ratio="wide" unless noted. Action blank = the URL alone is the shot.

# File (docs/public/screens/…) App URL Action
1 quote-builder.png erp /x/quote/quote_YRQzVHySHTzr76KwtRAp4u/KaBjBdxm6xTw3ivoapvG9s/details Q000002, has the quantity breaks. No Draft quote carries breaks; Sent is fine.
2 quote-digital-customer.png share /share/quote/5eed0000-0000-4000-8000-000000000001 Clean window, signed out.
3 quote-sales-order.png erp /x/sales-order/so_UpXcS5TNoTCg4PBdR3peqf/details SO000009, the only "To Ship and Invoice" order. Frame the header + status band.
4 order-dashboard.png erp /x/sales-order/so_UpXcS5TNoTCg4PBdR3peqf/details Same record as 3, framed on the three staggered promisedDate lines instead.
5 order-convert-line-to-job.png erp /x/sales-order/so_UpXcS5TNoTCg4PBdR3peqf/PF1EB543BGPgJuuQa65BaR/details SAW-001, 30 ea, Make to Order. Click Make to Order on the Jobs card.
6 order-job-overview.png erp /x/job/job_8N4xDHh7PkZDHC7zUXWxGT/details J000001.
7 otc-post-shipment.png erp /x/shipment/sh_4sYD2sAk34hWensuB3PxLo/details Open the Post modal. Do not confirm.
8 otc-sales-invoice.png erp /x/sales-invoice/si_BFQ5UXqePsHKen5dbPLVQr/details AR000001 Draft.
9 ship-quality-issue.png erp /x/issue/nc_Wfzn2Lyqsbb6wnQyPxvYSJ/details NCR000001 — the one carrying the job-operation link.
10 ship-procedure-versions.png erp /x/procedure/pro_YDRL1aV6LKJKaoPhzFUwr5 Open the V2 version dropdown (V1 is Archived).
11 ship-traceability-graph.png erp /x/traceability/graph?trackedEntityId=rSMCuSuyt7ZfaIUaM14vJ SAT1000-SN-0001. Without the param the route redirects.
12a ship-partial-shipment.png erp /x/shipment/sh_4sYD2sAk34hWensuB3PxLo/details Slot split in two — shipment half.
12b ship-partial-invoice.png erp /x/sales-invoice/si_BFQ5UXqePsHKen5dbPLVQr/details Slot split in two — invoice half.
13 build-subassembly-kit-toggle.png erp /x/part/item_PsbBdE9LPj13J9rpWegmgH/make/make_LnujjSJLt2XWLMU6outVaJ SAT-1000 v2.00 Draft — the toggle renders only on a Draft method, on a Make-to-Order line. Expand one.
14 build-job-method-explorer.png erp /x/job/job_8N4xDHh7PkZDHC7zUXWxGT/details Expand the explorer. Stay on details; other tabs auto-collapse it.
15 floor-mes-schedule.png mes /x/operations
16 floor-outside-operation.png erp /x/job/job_8N4xDHh7PkZDHC7zUXWxGT/details Frame the Bill of Process card — jo_7riMHK66MAftECyk2nhvcc is the anodize step at AstroMill.
17 floor-work-instructions.png mes /x/operation/jo_B8bp9wUytWkE2uW34Rqyyh Click the Instructions tab (React state, not deep-linkable). Procedure attached.
18 floor-mes-operation.png mes /x/operation/jo_7Z4q5gGdKERVgV7VgEYi5J "Machine structural panels" at CNC Mill — Process, Ready, on J000001.
19 floor-shopfloor-scan.png mes /x/assembly/jo_KazG6bdws4tWUFmWtAZtjT Click a tracked material → Issue Material modal. Dropdown, no scanner needed.
20 plan-projections.png erp /x/production/projections
21 plan-part-planning.png erp /x/part/item_ACg9bW6vQnYRh99VWRwaAj/planning Battery — batch-tracked, has a reorder policy.
22a plan-production-planning.png erp /x/production/planning Slot split in two — suggested jobs.
22b plan-purchasing-planning.png erp /x/purchasing/planning Slot split in two — suggested POs.
23 plan-receive-po.png erp /x/receipt/rec_S7rNbTW4zTAQL4V9nwX2qs/details Expand the battery line so the batch/lot field shows.
24 job-completion.png erp /x/job/job_JSiDJmAGFsRq7UAR2EKUYH/details J000002 Ready → header Complete → modal. Mutating — see ordering below.
25 job-production-events.png erp /x/job/job_8N4xDHh7PkZDHC7zUXWxGT/events 6 seeded events across two operations.
26 rfq-supplier-comparison.png erp /x/purchasing-rfq/d9u8j2tbc0ghholet58g PRFQ000001 Requested → Compare Quotes drawer (3 Active quotes).
27 rfq-supplier-portal.png share /share/supplier-quote/5c0e1a3d-7b41-4c92-9f18-2ad6e0b71c01 Clean window, signed out.
28 rfq-purchase-order.png erp /x/purchase-order/po_TaZiGpDdrPvrCfJzRMvLYU/details PO000004, "To Receive and Invoice".
29 receive-post-receipt.png erp /x/receipt/rec_S7rNbTW4zTAQL4V9nwX2qs/details Open the Post modal. Mutating if confirmed — do not confirm.
30 receive-purchase-invoice.png erp /x/purchase-invoice/pi_RiMaXHS9ibtut6RdV29kUS/details AP000001 Draft.
31 fa-register.png erp /x/fixed-asset/d9u8j2tbc0ghholet5d0/register FA000003, the Draft asset — the route redirects for any other status.
32 fa-depreciation-run.png erp /x/depreciation-run/d9u8j2tbc0ghholet5e0 Draft run, 2 lines.
33 fa-sell.png erp /x/fixed-asset/d9u8j2tbc0ghholet5c0/sell FA000001 Active.
34 co-new-notice.png erp /x/change-notice/new Empty form, before any affected item.
35 co-affected-item.png erp /x/items/change-notice/co_Xc8BasAdAcZwgCtGXqL6YV/coai_GddTJkkreziJcnQa4NbAFU/details CN-000002's affected item, draft method populated.
36 co-release-diff.png (ratio="tall") erp /x/items/change-notice/co_Xc8BasAdAcZwgCtGXqL6YV/details CN-000002 at Implementation → header Release → diff modal. Mutating if confirmed — do not confirm.
37 platform-backups.png erp /x/settings/backups Open the i contents popover. Gated to internal email / local dev — fine here.
38 reference-parts-csv.png erp /x/items/parts Hover the download button so the "Download CSV" tooltip is in frame.

Ordering

Shots 1–23 and 25–28, 30–35, 37–38 are read-only. 24 is the only one that changes data if the modal is confirmed — leave it last, and never confirm 7, 29 or 36 either. If a retake needs clean state, re-run pnpm run db:seed:dev -- --email [email protected] (it wipes and rebuilds the company's business data, so any manual edits made during capture are lost) and re-resolve the ids in this table, since they are regenerated on every seed.

MDX edits that come with this

Slots 12 and 22 each become two <Screenshot> elements — guides/ship.mdx:60 and guides/plan.mdx:49. Their captions need splitting too, one sentence per image. Everything else is a one-line change: add src="/screens/<file>.png" to the existing element.