Planning horizon (time fence) for MRP planning actions
Adds a per-item planning horizon (days from today) that limits which planning actions and suggested orders the two planning grids surface. MRP keeps generating actions over the full 48 weeks; the horizon is a read-time lens, so a buyer can widen it on one row without an MRP rerun and without saving anything.
Source request: .context/attachments/7lixQz/pasted_text_2026-10-01_04-35-37.txt.
Builds on .ai/plans/2026-09-08-mrp-planning-actions.md and
.ai/plans/2026-09-29-planning-actions-grid-rows.md.
Decisions (agreed Oct 1)
- One engine. The request's four aggregate rules (supply vs demand inside the fence) are NOT implemented. The existing per-document actions map onto them: New = Order/Make/Increase, Cancel = Cancel/Decrease, Reschedule In = Expedite, Reschedule Out = Defer.
- Planned POs stay supply. Carbon has no requisition document.
- Empty horizon = no fence (today's behaviour). Resolution:
itemPlanning.planningHorizonDayselsecompanySettings.defaultPlanningHorizonDayselse none. - Weekly dates. "1st negative on-hand" is the start of the first week whose projection is below zero.
- Per-row fence edit, page state only. Sort/filter use the saved horizon.
- No primary action / priority. The Actions chips stay; no sort by action.
- Bulk Order respects the fence.
- Column name is
planningHorizonDays, NOTplanningTimeFenceDays— the MRP v2 spec reserves that name for the auto-firm fence, a different concept.
Tasks
-
- Migration
planning-horizon:itemPlanning.planningHorizonDays,companySettings.defaultPlanningHorizonDays,planningAction.horizonDate+latestOrderDate(backfilled), and the two grid wrappersget_purchasing_planning_grid/get_production_planning_grid(base RPC + item group, horizon, time fence date, first negative week, latest order date, and the action-type / assignee filter evaluated inside the fence).
- Migration
-
pnpm db:migrate(regenerates types).
-
- Engine:
horizonDate+latestOrderDateon every candidate, carried through the diff-write; unit tests.
- Engine:
-
- Pure fence helpers + tests (
planning-fence.ts); scope resolver returns filter inputs instead of item ids.
- Pure fence helpers + tests (
-
- Services + loaders: grid RPCs, actions loaded for the page's items only (removes the 500-action cap).
-
- Grids (both): Item Group, Planning Horizon (editable), 1st Negative columns; fence-aware Actions cell, expanded row, bulk apply and bulk Order.
-
- Drawers (both): orders trimmed to the fence with an "include the rest" control, fence marker on the chart, the item's change actions listed.
-
- Item Planning tab field + Settings → Planning company default.
-
- Docs (
.claude/rules/mrp-system.md), MCP digest, lint, typecheck, tests.
- Docs (
As built
- Grid RPCs are WRAPPERS (
get_*_planning_grid) around the base planning RPCs, not redefinitions: the base stays the one definition of the projection. planningAction.horizonDate= earlier of the target order's current date and the suggested date;latestOrderDate= required date less lead time (new supply only).- The drawer lists suggested changes with the open-orders grid (
OpenOrdersGridinPlanningOrderGrids.tsx, each open order carrying its action), not the grid'sPlanningActionLines— see the@containerlesson in.ai/lessons.md. - The drawer has its own Planning Horizon control; moving the fence re-splits the suggested orders and re-merges the existing ones.
- Browser pass done on the demo company at 1440 and 1100 px (fence in grid and drawer, pull-in, suggested-changes table, expanded row, chart marker).
- The drawer is two editable grids (
PlanningOrderGrids.tsx): a draft Suggested Orders table and an Open Orders table whose cells autosave through newupdateLine/updateJobactions; planning actions sit on the row of the order they target. New shared pieces:EditableDateandGrid isRowEditable. Drawer widened toxl. - Browser-checked: draft edits (quantity, date), locked rows, refusal paths of both save actions (409 / 400 / 404). NOT exercised: a successful autosave, since that writes to the database.
- Not done: translations for the new strings (
pnpm translateat commit time).
Verification
pnpm --filter @carbon/planning test,pnpm --filter erp test(touched files)pnpm exec turbo run typecheck --filter=erp --filter=@carbon/planningpnpm run lint- SQL: call both grid RPCs against the local DB with and without a horizon and with the action filter.