Capacity planning: scheduler, holidays, shifts, qualifications

Last tested: 2026-10-26 Routes: /x/people/shifts, /x/people/holidays, /x/resources/processes, /x/resources/work-centers, /x/resources/abilities, /x/resources/ability/:id/employee/:eaId, /x/part/new, /x/job/new, /x/production/batches/new, /x/scheduling/forecast, /x/priority/people?view=capacity|board, /x/priority/operations, /x/resources/assignments, /x/resources/contractors, MES /x/operations

Covers the 8 fixes in .ai/plans/2026-10-26-capacity-planning-high-fixes.md (F1, F5, F6, F10, F12, F16, F26, F27). Build your own data — do not judge a fix on the demo data's state.

Prerequisites

  • Dev stack up (crbn up) INCLUDING the Inngest worker: every input change is applied by the debounced replan wave (~30 s). Poll job.scheduleOutdatedReason IS NOT NULL to 0 instead of sleeping.
  • Demo dataset (satellite) seeded; the Manufacturing Plant location exists.

Fixture (build it first, all at Manufacturing Plant)

  1. Shift — /x/people/shifts/new: Name "QA Shift", Location "Manufacturing Plant", end time 16:00 (default 08:00–17:00 Mon–Fri; lower the end hour segment once with ArrowDown).
  2. Process — /x/resources/processes/new: Name "QA Process", Default Unit "Hours/Piece", Batchable ON.
  3. Work centers — /x/resources/work-centers/new twice ("QA Cell A", "QA Cell B"): Processes "QA Process", Operating hours "Some Shifts", Shifts "QA Shift".
  4. Part — /x/part/new: Part ID "QA-PART-1", Replenishment "Make". Add ONE method operation (4 Hours/Piece on QA Process). The BOP editor is hard to drive; inserting the methodOperation row with SQL is acceptable. Check it shows at /x/part/:itemId/make/:makeMethodId.
  5. Jobs — /x/job/new three times (Item QA-PART-1, qty 1, defaults), then release each from the job page: button "Release" → dialog button "Release Job".

Expected plan (shift 08:00–16:00, 4 h ops, 2 stations): two jobs start now (one per station) and finish next morning; the third follows on the first station to free up. Every op's stored workCenterId equals its booking's station.

Checks

  • F1 Capacity (?view=capacity): the QA stations' Scheduled split by working time — e.g. a 13:00 Mon → 09:00 Tue booking reads 3.0 Mon / 1.0 Tue, never hours on nights or weekends.
  • F10: set one QA op's stored work center to the other station (SQL), Regenerate (Forecast header refresh button, aria-label "Regenerate") → stored station moves to the booked one. Ops board and MES columns must equal stored stations.
  • F5: edit QA Shift end time → exactly the QA jobs are stamped "Shift hours changed"; after the wave no QA booking falls outside the new hours. Deleting QA Shift stamps them "Shift removed".
  • F16: create a holiday on a weekday (/x/people/holidays/new) → all released jobs stamped "Company holidays changed"; no booking starts/ends that day; Capacity Available 0 and no "Nh staffed" note that day; Forecast shades it. Edit it to another day, then delete it.
  • F6: batch builder /x/production/batches/new?location=<loc>&process=<QA Process> → tick two QA rows, "Create & Release" → confirm dialog "Create & Release". The Sequential batch (≈ 8 h) starts NOW on a QA station (not behind its members' old bookings) and stays put across 3 Regenerates.
  • F12: /x/resources/abilities/new → Process "QA Process" (makes it gated). Add Test via /x/resources/ability/:id/employee/new (Employee "Test", Expires At). Man Test on a QA cell for one day (SQL peopleAssignment, shiftId = QA Shift to avoid the per-day unique key). Expiry = that day → gated op is a placeholder; expiry = next day → booked that day. People board ?view=board&range=day&date=<day> shows the amber "Missing" triangle only when the expiry is that day. Abilities table hides the person when expiry is today.
  • F26: /x/resources/training/new "QA Training" → header "Publish" → confirm "Publish". Then /x/resources/assignments/new: Training "QA Training", assign-to picker → type "Test" → the person row. List shows Assigned 1; drawer lists Test; "Mark Complete" records a completion.
  • F27: /x/resources/contractors/new (Supplier, Supplier Contact, Hours per Week). No UI adds contractor abilities — insert one contractorAbility row with SQL. Save the edit drawer unchanged and with new hours → abilities stay 1. Help text reads "…for reference. The scheduler does not book contractors on operations."

Cleanup

Delete, in one transaction: QA capacityReservations, the batch (null jobOperation.jobOperationBatchId first), the 3 jobs, trainingCompletion/assignment/training, contractorAbility/contractor, peopleAssignments, employeeAbility/ability, workCenterShift/workCenterProcess, methodOperation, work centers, process, shift, item. Then Regenerate.

Selector Notes

  • Shift/holiday/expiry time and date fields are react-aria spinbuttons: focus the segment ([role=spinbutton], index by position) and use ArrowUp/ArrowDown or digit key presses; fill does not reach them. Check the hidden input (input[name=endTime|date|expiresAt]).
  • Shift weekday toggles are switches with id="monday" … id="sunday".
  • Process "Requires Ability"/"Batchable" are button[role=switch] with that aria-label.
  • Drawer forms: submit with requestSubmit on the drawer's own form ("Save").
  • Board/People: range=day is required for the Day board; the Week board shows no missing-qualification warning.
  • macOS has no timeout; if agent-browser hangs, agent-browser --session <s> close, then log in again at /login with DEV_BYPASS_EMAIL.

Common Failures

  • Pressing Escape inside a drawer combobox closes the whole drawer.
  • A notify sent but nothing re-plans → the Inngest worker is not running.
  • A station manned on a day books ungated ops inside the manned window even when it is free earlier (existing behaviour, same on main) — remove fixture assignments before timing checks.