Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

4.0 KB
Raw Blame

Change Order — New Part / Replacement Part / Consolidation

Last tested: 2026-07-19 Routes: /x/change-order/new · /x/items/change-order/{coId}/details

Prerequisites

  • A Draft change order (create via /x/change-order/new — fill Name, Save).
  • For consolidation: an active Make part with an Active (non-CO-owned) make method and ≥2 BOM components. (M000000001 works locally; parts with only Draft/CO-owned methods can't be added as Version — the draft-create needs an Active method.)

Steps

1. Create the CO

Navigate /x/change-order/new → fill the first textbox (Name) → requestSubmit the form (button "Save"). Redirects to /x/items/change-order/{coId}/details.

2. Add a net-new New Part (§C)

  • Click Add Affected Item (explorer bottom button).
  • Modal: first control is a Change type Select (Version / Revision / Replacement Part / New Part). Selecting New Part swaps the body to a mini-form: Part Number, Name, Type (Part/Tool), Replenishment System.
  • KNOWN BUG: the Part Number does NOT auto-populate — type one manually (e.g. PBRKT001). Fill Name; open the Type combobox → pick Part; open Replenishment combobox → pick Make.
  • requestSubmit the modal form (button "Add"). Navigates to the new affected item.
  • Verify detail: badge NEW; Properties + Bill of Material + Bill of Process (empty); NO cutover/Part Supersession card.

3. Add an assembly as Version (§D)

  • Add Affected Item → keep Version → open the item picker (2nd combobox) → pick a Make part with an Active method. requestSubmit "Add".
  • Open the assembly's affected-item detail → Add Item (BOM) → the item picker (includeInactive) lists the inactive New Part draft too (it may be past the dropdown's first virtualized page — filter/scroll to it).

4. Release (§E)

  • Advance the CO: click Advance to Start → Advance to Engineering Complete → Advance to Implementation → Release.
  • (Browser refs drift on the release dialog; a reliable fallback is to POST the status route directly — see Selector Notes.)

Selector Notes

  • Submit Carbon forms with requestSubmit(button), never a click.
  • The Add-item modal has two ValidatedForms (existing-item vs new-part) toggled by the change-type Select; requestSubmit the form of the mode you're in.
  • Reliable release (bypasses the drifty dialog): POST the status route with id, fromStatus, status:
    fetch(`/x/items/change-order/${coId}/status`, {method:'POST',
      body:(()=>{const f=new FormData();f.append('id',coId);f.append('fromStatus','Implementation');f.append('status','Done');return f})(), redirect:'manual'})
    
    (302/opaqueredirect = applied; a 422 means a missing field — id is required.)
  • Reliable add (bypasses the picker): POST /x/items/change-order/${coId}/affected with changeOrderId, itemId, changeType (existing) or changeType=New Part + readableId,name,itemType,replenishmentSystem (net-new).

DB verification (the real proof)

-- Net-new New Part after release: active, and ZERO supersession as successor
SELECT active FROM item WHERE "readableId"='PBRKT001';                 -- t
SELECT count(*) FROM "itemSupersession" s JOIN item i ON i.id=s."successorItemId"
  WHERE i."readableId"='PBRKT001';                                     -- 0
-- Minted New Part is inactive + CO-owned Draft method before release
SELECT active,"revisionStatus","changeOrderId" FROM item WHERE "readableId"='PBRKT001';

Common Failures

  • Version add "silently fails" — usually the picked part has no Active make method (only Draft / CO-owned drafts). createChangeOrderDraftMethod Version branch needs an Active method to version; otherwise it rolls the affected item back.
  • Part Number empty in the New Part mini-form — useNextItemId isn't auto-minting in this modal (bug); type a number manually.
  • Release dialog confirm button hard to hit via agent-browser — use the direct POST.